Facilities Williams

Property Book
spacer
spacer

Campus Properties

Rental Properties

Buildings
Campus Property Listing

Historical Information
Chronological List of Architecture
Brief College History
Eph's Gravesite and Monument

Projects
History of Construction Projects
Miscellaneous Projects

Square Footage Information
Square Footage Subtotals
Total Square Footage by Fiscal Year
Cumulative Square Footage Graph (PDF)
Square Footage/Cubic Footage Subtotals
Additions and Deletions

Utilities Information
Electric Distribution Transformer Schedule
Electric Primary Distribution System
Radiation Figures
Steam Distribution System

Facilities Information
Certificates of Inspection - Capacities
Classroom Capacities
Legal Capacities

Parking Lot Capacities

Details of Individual Buildings




spacer spacer

History of Construction Projects

Adams Memorial Theatre - 1941
(John Quincy Adams)
1941 Built - $250,000
Architect: Hoyle, Cram and Ferguson
Technical Advisor: Stanley McCandless (Yale School of Drama)
1941 Parking lot
1963 New electronic light board
1965 Parking lot and new road
1974 Air conditioner replacement - $39,000
1975 Improvements - $41,000
1979 Rigging - $6,600
1980 Light board - $85,000
1980 Major renovation - $92,000
1982 Door hardware - $1,000
1983 Down stage addition - $937,000
Architect: Cambridge Seven Associates, Inc.
1984 Asbestos removal - $4,390
1984 New stage - $9,000
1984 Door hardware - $1,000
1984 Reupholster seats - $35,000
1984 Dust collector - $6,000
1984 Asbestos removal - $4,390
1985 Curtain - $3,540
1985 Down stage air conditioning - $23,000
1986 Emergency lighting - $3,930
1987 Rigging - $46,500
1988 New roof-main stage - $8,000
1990 Sound system - $3,700
1992 Theatre relocation - $39,652
1993 Dance studio - $89,897
1993 Replace old high voltage wiring feeding AMT which runs between West College and the Faculty House - $50,000
1995 Pit cover/stage extension - $28,127
1995 Code upgrade - $6,928
1995 Replace sewer line - $10,000
1995 Rigging Phase I - $51,200
1996 Parking lot sewer line repair - $7,880
1997 Rigging Phase II - $132,658
1998 Office renovation - $28,000
2000 AMT/Griffin crosswalk lighting - $25,717
2002 New stage curtains - $12,897
2005 AMT Renovation - $3,200,173
Improvements - $1,762,027
Remove Downstage - 4,900 square feet
Architect: William Rawn Associates
General Contractor: Barr & Barr
2006 Dressing rooms card reader expansion - $7,417
Agard House - Delta Phi - 1920's
(Harry L. Agard)
1967 Purchased
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp.
1971 Major restoration - $93,000
1979 Insulation - Agard/Fort Hoosac - $7,500
1984 Interior renovations - $33,500
1994 Egress 3rd floor - $66,615
Renovate 3rd floor creating five student rooms and satisfy public safety codes.
1996 Emergency/exit lights (Agard, Parsons, Sewall, Thompson, Ft. Hoosac, Faculty House, West College) - $20,868
2004 Boiler - $11,616
2004 Flooring/carpeting - $9,000
2005 Summer '05 Renovation project
Design - $100,000
2005 Summer '05 Renovation project
Renovation - $1,899,349
Architect: Woodward, Connor, Gillies, Seleman
General Contractor: Renau
Agway/Denison Barns 1977 Barn #1
1979 Barn #2 - $20,000
1984 Barn #3 - $16,950
1984 Gate - $8,730
1991 Cleanup - $14,975
2004 Replace sand/salt structure - $64,744
2004 Improve apron at sand/salt shed - $19,700
Alumni House/The Log 1941 Built
Architect: Kenneth Reynolds '16
1946 Dodge Room
1952 West College room addition - $28,000
Architect: Kenneth Reynolds '16
1973 Sprinkler system - $14,000
1986 Renovation - $51,500
1993 The Log/Hockey Rink steam line - $18,277
2002 Renovation - $104,874
Architect: Westall
General Contractor: Renau
2004 Hood Compliance Upgrade - $50,000
American Legion 2001 89 Spring Street - acquired property in exchange for construction of new building at 109-117 Latham Street, formerly the Meade Block
Athletic Complex 2008 Master planning - $200,000
B&L Building - 2005
(formerly 100 Spring Street)
2005 Total project cost - $4,371,104
2001 Acquisition - $300,000
2003 Design, Demolistion and Construction - $3,401,104
Architect: Burr & McCallum
General Contractor: Tierney
2004 Additional funding: $670,000
Bascom House
Beta Theta Pi - 1913
(John Bascom 1849)
1913 Architect: Harding and Seaver
1966 Purchased
1968 Major renovation
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp.
1994 Renovation and refurbishment - $537,846
2003 Renovation: Convert to house Admission Department- $408,622
Architect: EDM
General Contractor: Renau
2006 Drainage - $12,456
Baxter Hall - 1953
(James Phinney Baxter III '14)
1953 Built - $1,500,000
Architect: Perry, Shaw, Hepburn, Kehoe and Dean
1954 Freshman Quad landscaping and planting - $60,000
Architect: Olmsted Assoc.
1955 Rathskeller - $18,250
Designed by: Perry, Shaw, Hepburn, Kehoe and Dean & William C. Bryant
1970 Offices and freezers
1971 Radio station-WCFM
1972 Snack bar
1976 Snack bar refurbishing - $5,200
1976 Mailroom - $18,800
1978 Chaplain's office - $1,000
1979 Lawn sidewalk - $4,500
1979 Radio station-WCFM renovation - $4,000
1984 Phase I renovation - $916,000
Architect: John Jordan, P.C.
1984 Transformer - $90,100
1985 Phase II renovation - $515,000
Architect: John Jordan, P.C.
1985 Electric loop - $18,000
1986 Feeder - $17,900
1992 Refrigeration conversion - $29,106
1992 Boiler - $25,074
1992 Elevator - $4,058
1994 Generator - $8,750
1995 Mailroom carpet - $9,500
1995 Egress - $38,039
1995-96 Sitework - Baxter, Chapin, Sawyer - $350,000
Architect: Carol R. Johnson Associates, Inc.
1996 Hot water heater replacement - $11,485
1996 Mailroom - replace work area carpet - $6,317
1999 Student Activities Office - $20,000
2000 Front doors - $10,003
2000 Heating coils - $15,485
2001 New railing system - $35,000
2004 Baxter demolished 10/2004
Berkshire Hall - renamed Fitch
Berkshire Quadrangle 1959 Landscaping - $25,000
Architect: Olmsted Associates
1963 Old campus concrete steps
1963-64 Prospect landscaping and parking lot - $22,500
Architect: Olmsted Associates
1979 Fitch/Prospect steam - $16,000
1991 Landscape - $116,839
2004 Landscape project - stone wall entrances - $12,800
2007 Quad landscaping - $94,121
Berlin Ski Area 1960-61 Development
Bernhard Music Center - 1978
(Arnold Bernhard '25)
1978 New music facility - Phase II - $2,300,000
Architect: Cambridge Seven Associates, Inc.
1978 Furniture and equipment - $250,000
1984 Furniture - $11,500
1984 Tile floor
1985 Light system - $14,400
1985 Air conditioning - $170,300
1990 Elevator repair - $4,350
1994 Storage facilities improvements - $3,507
1995 Emergency lighting - $8,762
1996 Reroof patio roof between Chapin/BMC - $4,775
1996 Air balance (Chandler, Hopkins, Chapin, BMC) - $4,021
1996 Tile floor between Brooks Rogers/Shainman - $4,270
1997 Build storage room for instruments - $6,405
1997 Patio roof repairs - $8,300
1998 Storage lockers/display case - $3,000
1999 Humidifier - $17,000
2001 Bernhard/Chapin wiring/video camera - $11,817
2001 Card reader door - $22,880
2002 Humidity control upgrades - $39,348
2003 HVAC upgrades - $58,962
2003 Audio room partition - $9,126
2004 Create new closet in Rehearsal Hall for equipment storage - $1,612
2006 Chilled water tie-in - $95,302
2006 Humidity controls upgrade design - $30,000
2007 Humidity controls upgrade - $168,861
2008 Music Department master planning - $150,000
2008 Storage solution - $90,000
Bronfman Science Center - 1968
(Edgar M. Bronfman '50)
1966 Extension of Electrical Distribution System to Bronfman - $21,000
Engineer: Lockwood Greene Co.
1968 Bronfman Science Center - $3,750,000
Architect: Benjamin Thompson & Associates
1968 Landscaping - $34,000
Architect: Carol R. Johnson & Associates, Inc.
1976 Equipment - $140,545
1976 Fire protection - $5,500
1978 West vestibule - $2,800
1979 Insulated drapes - $5,750
1979 Cage washer floor replacement - $3,000
1980 Aquarium refrigeration - $7,500
1980 Special alterations - $41,000
1982 Computer Center space study - $5,000
1982 Room subdivision - $3,800
1984 Auditorium: humidity control - $3,200
1984 Roof - $72,100
1984 Chillers - $19,900
1984 Auditorium stage drape - $4,000
1984 Air conditioning - $170,260
1985 Still - $3,750
1985 Basement classrooms - $501,000
Architect: Hallock Architects, Inc.
1985 Book shelving - $35,000
1986 Micros and shelving - $38,950
1987-88 Fire alarm - $139,310
1989-90 Psychology office - $26,965
1989-90 Elevator - $1,774
1989-90 Fire alarm - $139,310
1990 Still - $6,290
1990 Lighting - $15,000
1991 Cooling tower upgrade - $1,415
1991 Steam coil - $2,677
1992 Room 236 - $11,012
1992 Room B22 - $2,482
1992 Air handler - $42,649
1992 Rooms 378 & 384 - $3,240
1992 Cage washer - $5,000
1992 Neuroscience lab - $15,787
1993 Psych/Legal rooms - $54,589
1993 Neurolab - $66,275
1994 Air handling unit replaced - $29,919
1994 HVAC controls - $38,650
1994 Chill retube - $11,237
1995 Carpet - $16,170
1995 AHU - $37,758
1996 Neuroscience lab (Solomon) renovation - $19,261
1997 Room 323 office renovation - $3,335
1999-00 Unified Science Center: renovation - $738,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co.
2001 Renovate research labs 260 & 261 - $6,582
2001 Renovate 316 & 346 - $55,822
2002 Central stair ADA - $74,541
2003 Interior/Exterior Painting - $182,000
2004 Matrix Card Access Installation - $52,000
2004 Rail Replacement - $19,110
2004 Transformer Replacement - $73,963
2005 Auditorium Design - $48,675
2006 Auditorium Construction - $387,623
Architect: Centerline
General Contractor: Renau
2007 Computer Science office construction - $30,049
2007 Psychology Office construction - $15,578
2008 Psychology Labs Renovation - $70,000
2008 Systems and roof repair - $120,000
Brooks House - Delta Kappa Epsilon - 1961
(Belvidere Brooks '10)
1961 Built
Architect: Daniel O'Connell & Sons
1966 Weston/Brooks parking lot - $19,000
Designed by: Winthrop M. Wassenar, P.E.
Architect: Daniel O'Connell & Sons
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp.
1975 Major renovation - $20,000
1982 Kitchen - $15,000
1984 Windows - $22,300
1984 Patio - $33,750
1992 Conference move - $151,650
1996 Fire alarm, emergency/exit light upgrade - $23,837
2000 Renovation - $933,559
Architect: Thomas Bartels
2003 B Parking lot expansion - 36 additional spaces- $166,604
Engineer: Vince Guntlow
General Contractor: Petricca
2005 Conference Office lighting - $3,216
2005 Conference Office ventilation - $7,261
2008 Steam distribution - north of Brooks House - $30,000
Bryant House (Greylock Quad) - 1965
(William Cullen Bryant)
1965 Residential houses (Carter, Bryant, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative
1978 Roof replacement - $10,000
1980 Bryant/Lasell roof repairs - $22,500
1985 Roof (Carter, Gladden, Mark Hopkins, Greylock Dining) - $73,300
2000 Greylock Housing Renovation (Bryant/Mark Hopkins) - $2,500,000
Architect: Black River Design
General Contractor: MLB
2001 Bryant/Mark Hopkins exterior painting - $26,272
Carter House (Greylock Quad) - 1965
(Franklin Carter)
1965 Residential Houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative
1979 Roof - $8,400
1984 Drapes - $20,000
1985 Roof (Bryant, Gladden, Mark Hopkins, Greylock Dining) - $73,300
2001 Greylock Housing Renovation (Carter/Gladden) - $3,268,596
Architect: Black River Design
General Contractor: MLB
Central Chilled Water Plant - 2004 2001 Preliminary site work and design - $250,000
2002 Design and Construction - $4,180,587
Architect: William Rawn Associates
General Contractor: Barr & Barr
2007 MSL Chiller/Chiller Plant VFD installation - $47,000
Chadbourne House - formerly Keck House - 1920
(Paul Ansel Chadbourne)
1971 Purchased
1977-78 Conversion to student housing - $57,000
1982 Aluminum siding - $11,000
2003 Interior/Exterior Painting - $5,460
2003 Renovation Design - $50,000
Architect: EDM
2004 Renovation - $497,798
Architect: EDM
General Contractor: Renau
Chaffee Tennis House - 1973
(Clarence Chaffee)
1960 6 hard surface tennis courts - $40,000
Designed by: Peter P. Welanetz, PE
1973 Chaffee Tennis House - $13,000
Designed by: Peter P. Welanetz, PE
1982 Rebuild courts - $11,500
1984 3 new hard surface tennis courts - $44,000
1989-90 Fence - $35,350
1991 Fence/drainage - $70,801
New Chaffee Tennis House - 1998 1998 New tennis house/court improvements - $279,668
Torrance M. Hunt '44 Tournament Courts
Architect: Christopher Williams
  1998 Tennis courts: repaint east end - $15,000
2000-01 Todd Hunt Tennis Center - $167,694
Construction of additional courts
2004 Landscaping - $35,648
2005 Interior/exterior painting - $4,456
2006 Tennis court repair - $9,500
2007 Tennis court repair - $9,975
2008 Tennis court crack reapir - $12,000
2008 Tennis courts resurface - $35,000
Chandler Athletic Center - 1987
(John Wesley Chandler)
1982 Feasibility study - $35,000
1987 Athletic facility: new gym/pool - $16,282,000
Architect: Cambridge Seven Associates, Inc.
General Contractor: Fontaine Brothers
1988 Official opening
1991 Chandler/Lasell signage - $7,800
1992 Signs - $10,283
1993-94 Athletic offices - $84,748
1996 Pool - replace stainless steel dampers - $7,269
1996 Air balance (Chandler/Hopkins/Chapin/BMC) - $4,021
1997 Beam detectors - Gym - $13,000
1999 Gym - expansion joints - $70,000
1999 Pool - rails around diving boards/purchase two diving boards - $8,000 (99 R&M - Athletic Projects)
1999 Pool - concrete walls - $5,000
1999 Pool - CO2 storage shed - $15,319
1998 Chandler Plaza Replacement - $203,096
2001 Gym 35 second clock - $3,573
2002 Chandler Plaza - extend icemelt - $94,067
2004 Gym Dry-O-Trons - $13,926
2004 Gym ejector pump replacement - $2,695
2004 Pool locker rooms flooring - $13,500
2004 Pool repairs - $50,000
2005 Basketball court - refinish - $5,900
2005 Gym 2nd floor hallway flooring - $4,956
2005-06 Pool and roof repairs - drain pool and perform masonry repair work - $610,000
Architect: Moser, Pilon & Nelson
2006 Pool timing system replacement - $13,000
2007 Basketball roof repair - $132,300
2007 Pool recaulking and waterproofing
2008 Fire alarm installation and upgrade - $70,000
2008 Roof replacement - coaches offices - $46,000
Chandler Commercial - 1987 1987 Retail spaces/athletic offices - $700,000
Architect: Cambridge Seven Associates, Inc.
Chapin Hall - formerly Grace Hall - 1912
(Alfred Clark Chapin)
1912 Built - $259,313; cost of organ - $45,800
Architect: Cram Goodhue and Ferguson
1957 Restoration - $30,000 (1953 - $10,000)
Designed by: Peter P. Welanetz, PE and W.C. Bryant
1976 Furniture - $15,000
1976 Equipment - $20,000
1977 Renovation Phase I - $400,000
Architect: Cambridge Seven Associates, Inc.
1984 Floors in Trustee Room and stage - $9,940
1984 Windows - $6,000
1985 Woodwork - $11,000
1991 P.A. system - $3,718
1993 Replace roof - $113,850
1993 Storage - $3,980
1993 Security - $5,500
1996 Reroof patio roof between Chapin/BMC - $4,775
1996 Air balance (Chandler/Hopkins/Chapin/BMC) - $4,021
1997 Sitework - Baxter, Chapin, Sawyer - $300,000
Additional Funding - $50,000
Architect: Carol R. Johnson Associates, Inc.
2001 Chapin/Bernhard wiring/video camera - $11,817
2002 Rekeying - $12,130
2002 Masonry repairs - rebuild front steps - $195,000
2004 Replace/Upgrade PA system - $38,842
2004 Lighting - $84,261
2004 NCUP chilled water to Chapin - $350,000
2004 Restore and clean masonry - $414,424
2004 Windows lead replacement $106,619
2005 Masonry inspection - $56,178
2005 I&I investigation - $3,000
2006 Add additional lockers in basement - $5,451
2006 Practice room soundproofing - $39,138
2008 Renovation/acoustic upgrade - $150,000
Children's Center - 2007 2007 Total Project Cost - $6,100,000
Architect: DW Arthur Associate Architects
Contractor: Engelberth
2003 Expansion Feasibility Anaylsis - $34,992
2004 Site Selection: $75,000
2004 Design: $370,575
2004 Design and Construction: $5,775,000
Clark Hall (Geology) - 1908
(Edward Clark '31)
1908 Built - old Clark Hall (wooden) pulled down in 1886
Architect: Frank Wallis and William Rogers
1954 Restoration - $12,000
Designed by: Peter P. Welanetz, PE
1970 Renovation - $350,000
Architect: Lockwood Greene Co.
1978 Biology, Chemistry, Physics, Clark Hall insulation - $12,300
1988-89 Geology Lab: renovation to sub basement - ventilation system for 105 and basement - $117,913
1990-91 Roofs and gutters - $45,000
1992 Computer lab - $35,365
1994 Control work - $3,500
2003 Interior/Exterior Painting - $8,300
2003 Landscape Foundation at Southwest Side - $6,200
2004 Basement - repaint floor, resurface work areas, new cabinets - $3,809
2006 Stair repair - $311,192
Class of '37 House 1986 Remodel - $104,000
1986 Daycare Center - $50,710
Architect: John C. Holden, B.S., M.E., PE
1990 Daycare renovation - $33,140
1991 Class '37/Doughty sewer repair - $5,102
1994 Kitchen - $9,582
1996 Replace sewer line - $2,630
1997-99 Renovation and Refurbishment - $395,187
Capital funds 1998 - $100,000
Donor Funding 1998 - $150,000
Additional Funding 1999 - $90,000
Architect: Dignard Architectural Services
2002 Renovation - $4,311
Class of '62 Center for Theatre and Dance - 2005 2005 Total Project Cost: $52,194,310
1998 Herbert Allen donation - $20,000,000
1998-99 Theatre Design Consultant: Robert Davis, Inc.
1999 Site Analysis: Sasaki Associates
1999 Architect: William Rawn Associates
1999 General Contractor: Barr & Barr
2001 American Legion - $791,205
Architect: Hill Architects
General Contractor: Waldron
2001 Design and engineering fees - $2,000,000
2002 Site work and construction - $46,400,000
2003 High voltage distribution system expansion - $350,000
General Contractor: Barr & Barr
2004 Construction Budget Increase - $1,500,000
Cole Field 1960-64 Extension of Cole Athletic Field
1969 Electric scoreboard
1973 Women's field hockey field
1984 Cole Field grading - $10,378
1985 North of tennis courts: rebuild field - $45,000
1986 Playing fields: replace lighting - $20,050
1986 Athletic field - $66,470
1993 Scoreboard - $5,455
1998 Softball backstop - $5,930
1999 Women's field hockey field: regrade sod - $33,883
2000 Women's Soccer field permanent scoreboard - $10,389
2000 Women's Soccer Field renovation - $26,400
2000 Women's softball field - $14,925
2003 Build scoring table covering (3) - $3,416
2003 Build portable shelter for crew boats - $10,500
2004 Install quick connect - $25,000
2004 Lower Cole irrigation - $62,000
2004 New Bobby Coombs Baseball Field
Design and Construction - $510,814
2005 Magnum water cannon - $9,121
2005 Men's soccer field drainage and sodding - $245,598
Architect/General Contractor: Clark Co.
2005 Stetson Road reconstruction - $240,000
Engineer: Guntlow
2006 Softball field renovation - $101,294
2006 Replace softball outfield fence - $4,009
Cole Field House - 1926 1926 Built
Architect: Densmore, Leclare and Robbins
1973 2nd floor
1976 Washing machines - $2,361
1986 Renovation - new chimney liner - $105,000
Architect: David J. Westall, R.A.
1994 Sewer - $13,692
1994 Showers - $8,779
1994 Storage - $70,859
1995 Sewer line - $22,514
1995 Rest rooms - $3,284
1997 Remove B&G equipment from storage building and return to athletic space 1993 - $70,000
Design and Construction - $1,727,923
Additional Funding - $247,000
Architect: Baron & Hammer
1998-99 Bathroom facilities - $87,539
Architect: Christopher Williams
2003 Interior Exterior Painting - $11,800
2008 Drainage - $50,000
2008 Ventilation upgrade - $45,000
College Garage/Art Studio - 1902 1902 Built
1975 Art sculpture in Art Studio - $35,000
1980 Art facilities project - $100,000
1984 Art Studio roof - $58,300
1985 Faculty Art Studio - $333,000
Architect: Burr & McCallum
1990 Art Studio spray booth - $1,710
1996 Sculpture Studio-replace leaking transformer - $8,525
1998 South studio - $84,500
2004 Art studio drainage - $3,304
2004 Sidewalk waterproofing - $29,173
2005 Metal art studio - $3,675
Currier Hall - 1908
(Lura Ormsbee Currier)
1908 Built
Architect: Robins & Oakman '99
1954-57 Restoration and Music Department - $35,000
Designed by: Peter P. Welanetz, PE
1964 Renovation - $180,000
Architect: The Architects Collaborative
1965-66 Repainting exterior
1973 Doors and toilets
1979 Conversion to student housing - $30,000
1979 Currier/Fitch window repairs - $13,000
1982 Retaining wall - $6,000
1987 Carlisle fully adhered rubber roof - $29,000
1989-90 Railing - $12,050
1993 Increase main service from 200 amp to 400 amp - $50,000
1993 Renovation and refurbishment - $685,082
1993 Currier/Fitch steam line - $32,205
1996 Data wiring - $8,000
1998 Roof parapet - $24,780
2003 Interior/Exterior Painting - $13,015
2004 Sewer - $3,196
2005 Heat control - $1,746
2005 Sprinkler system design - Currier, Poker Flats - $30,057
2006 Heating system replacement - $75,113
2006 Residence halls sprinklers - Currier/Poker Flats - $372,666
Engineer: Fire Protection Services
General Contractor: Renau
Danforth Block 1992 Renovate and upgrade eight apartments - $815,798
2006-07 Air quality testing
2007 Fire escape - $90,869
Denison Gate House - 1898 1984 Deleading - $4,830
1988 Administrative offices
1997 Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000
Dewey House - 1900 1974 Conversion to student housing
1977 Central College library
1979 Furnishings - $3,500
1982 Exhaust fans - $6,300
1982 Radiator traps - $7,500
1989 Bookstore restoration - $182,000
1995 Sold
Dining Services 2002 Support facility (project cancelled)
Design and permitting - $89,687
Architect/Contractor: Breadloaf
2004 Hood compliance upgrades - $21,870
Dodd Annex 1972 Restoration: Williams Inn Annex #3 - $39,000
Designed by: Peter P. Welanetz, PE
1984 Rewire - $5,500
1984 Dodd complex: central electric conversion - $53,000
2005 Interior/exterior painting - $3,216
Cyrus M. Dodd House - formerly Treadway Williams Inn - 1900
(Cyrus Morris Dodd 1855)
1956 Purchased
1960-61 Major restoration
1974 Conversion to student housing - $116,000
1974 Landscaping - $4,000
1979 Storm windows - $15,000
1980 Renovation - $28,600
1982 Bathroom fans - $5,700
1984 Dodd complex: central electric conversion - $53,000
1984 Aluminum siding - $33,500
1984 Exhaust fan - $6,300
1984 Radiator traps - $7,500
1984 Electrical distribution - $12,000
1985 Electrical conversion: central system - $318,000
1985 Rewiring - $175,000
1985 Door lock replacement - $17,650
1990 Bathrooms - $6,810
1990 Fire line - $115,635
1993 Renovation and refurbishment - $886,702
1998 Power outage: cable replacement - $15,500
1999-00 Dining refurbishment and purchase new tables and chairs - $100,172
Architect: Christopher Williams
2001 Dodd Dining Renovation - $1,045,705
Architect: CenterLine
General Contractor: Cutler
2004 Exit stairs - $61,089
2004 Dodd dishroom reconfiguration - $47,231
2007 Dining A/C installation - $57,251
Doughty House - 1908
(William H. Doughty Jr. 1898)
1968 Purchased
1975 Sprinkler system - $12,000
1979 Fire escapes - $15,000
1991 Doughty/Class '37 sewer repair - $5,102
1998 Renovation and refurbishment - $362,973
2003 Interior/Exterior Painting - $9,800
2006 Road repairs - $66,018
Driscoll Dining Hall - 1963
(Alfred E. Driscoll '25)
1963 Berkshire Quad dining/lounge - $385,000
Architect: Shepley, Bulfinch, Richardson & Abbott
1984 New heating coil installed - $6,000
1984 Roof - $14,000
1991 Driscoll/Berkshire patio - $43,289
1996 Upgrade of kitchen and serving facilities (Driscoll, Faculty House, Greylock) - $134,000
2002 Electrical projects-switch gear - $7,509
2004 Hood Compliance Upgrade - $21,870
2004 Roof replacement - $36,000
2004 Replace lighting - $14,000
2005 Driscoll Dining Renovation Schematic - $43,433
Droppers House - 1933
(Garrett Droppers)
1987 Administrative offices
1989 Personnel office
1997 Addition/renovation - $52,071
Architect: Christopher Williams
2004 Human Resources moved to B&L (7/04)
2004 Dining Services offices moved to Droppers (8/04)
2005 Replace existing electrical service - $1,873
East College - 1842 1842 The original building of 1798 burned in 1841; in 1907 larger doorways added
Designed by: J.S. Oakman '99
1956 Rebuilt - $267,000
Architect: Cram and Ferguson
1982 Major renovation - $41,690
1984 Roof - $12,100
1988 Asbestos removal - $10,670
1988 Asbestos removal - $24,000
1991 Renovation - $330,412
1999 East/Fayerweather - single sex bathrooms - $532,462
Architect: H.P. Rovinelli Architects
2003 East/Fayerweather - sprinkler system - $223,040
Eph's Monument and Gravesite Restoration - 2005 2005 Monument and Gravesite Restoration - $323,487
Architect: Elmore Design
General Contractor: E.T. O'Connor
Faculty House/Alumni Center - 1938 1938 Built - $150,000
Architect: T.H. Ellett (New York)
1976 New dining room - $3,850
1982 Egress and lighting - $34,050
1982 Bowling machines - $7,000
1983 Addition - $1,245,000
Architect: Cambridge Seven Associates, Inc.
1985 Lighting - $16,740
1986 Landscaping - $10,360
1986 Roof - $12,130
1995-96 Upgrade of kitchen and serving facilities (Driscoll, Faculty House, Greylock) - $134,000
1996 Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College) - $20,868
1997 Roofing repair (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000
1999 Bowling Alley - $20,000
2004 Roof parapet wall - $13,600
2004 Patio wall and rail - $20,300
2004 Steam line - $19,355
2005 Chilled Water to Faculty House - $51,460
2006 Renovation design - $240,000 - project deferred
Architect: Truex
General Contractor: Barr & Barr
2008 Furniture/code issues - $450,000
Fayerweather Hall - formerly South College - 1842
(Daniel F. Fayerweather)
1842 Built
Architect: Allen & Collins
1905 Gold Coast addition to south; building named Fayerweather
Architect: Allen & Collins
1957 Rebuilt - $325,000
Architect: Cram and Ferguson
1982 Major renovation - $41,900
1988-89 Renovation - $400,000
1999 East/Fayerweather single sex bathrooms - $532,462
Architect: H.P.Rovinelli Architects
2003 East/Fayerweather - sprinkler system - $223,040
Fernald House - 1880
(Orlando Marcellus Fernald)
1968 Addition - $6,200
Designed by: Ralph W. Iacuessa
1973 Sprinkler system - $9,000
1979 Renovation - $15,000
1982 Office renovations and stairwell - $6,500
1984 Renovation - $2,600
1988 Asbestos removal - $21,200
1999 Address code issues - $209,665
2006 Demolished 9/12/06 (Stetson/Sawyer Project)
Fitch House - formerly Berkshire Hall - 1905
(Ebenezer Fitch)
1905 Built
Architect: Francis R. Allen (Allen & Collens)
1963 Renovation; renamed Fitch - $180,000
Architect: The Architects Collaborative
1979 Fitch/Prospect steam line - $16,000
1979 Fitch/Currier window repairs - $13,000
1979 Fitch/Mission steam line replacement - $29,500
1987 Carlisle rubber roof - $24,000
1993 Replace old main high voltage feeder - $40,000
1993 Fitch/Currier steam line - $32,205
1994 Renovation and refurbishment - $944,270
1999 Prospect/Fitch metal railing - $5,200
2004 Fitch/Lehman Sprinkler System - $311,119
2005 Interior/exterior painting - $9,000
2006 Masonry repair - $147,817
2007 Cornice Repair - $1,169,000
Architect: MCWB/Ryan-Biggs
General Contractor: Allegrone
Fort Hoosac - formerly Taconic House - Phi Sigma Kappa -1931 1931 Built
Architect: Grosvenor S. Wright
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Tyler, Wood) - $16,000
Engineer: Automatic Sprinkler Corp.
1979 Insulation (Agard, Fort Hoosac) - $7,500
1982 Handicapped toilet - $12,000
1984 Window replacement - $24,420
1994 Roof pocket - $10,600
1995 Door/hardware - $16,000
1999 Upgrade systems 1997 - $167,222
Architect: Bob Holdridge
2006 Replace electrical system - $39,710
2006 Replace heating units - $54,356
2006 Install solar panels for hot water - $18,000
Freshman Quadrangle 1954 Baxter Hall/Freshman Quad landscaping - $60,000
Architect: Olmsted Associates
1984 Freshman Quad landscaping - $87,000
James A. Garfield House - Delta Upsilon
(Henry Augustus Garfield 1885)
1924 Purchased
1968 Sprinkler system - $14,600
Engineer: M & W Heating, Inc.
1978 Renovation - $501,000
Architect: Gary Lindstrom and Associates
1978 Survey - $6,500
1978 Garfield/St. Anthony new steam line - $47,300
1994 Fire alarm - $9,741
1996 Stand-by pumps/perimeter radiation (Garfield, Tyler Annex) - $2,831
2000 Upgrade systems - $313,515
Architect: Thomas Bartels
1999-00 Repair/replace windows - $500,000
2006 Renovation design - $200,000
Gladden House (Greylock Quad) - 1965
(Washington Gladden)
1965 Residential houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative
1982 Steam line - $15,518
1985 Roof (Bryant, Carter, Mark Hopkins, Gladden, Greylock Dining) - $73,310
2001 Greylock Housing Renovation (Carter/Gladden)- $3,268,596
Architect: Black River Design
Contractor: MLB
Goodrich Hall - 1859
(John Zaccheus Goodrich)
1859 Chapel and Alumni Hall: shift to stone (local dolomite) and to Gothic
Architect: Gervase Wheeler
1905 Remodeled and named Goodrich
1962 Alterations - $10,000
Designed by: Peter P. Welanetz, PE
1975 Major renovation - $5,400
1976 Goodrich/Lawrence steam line - $9,000
1976 Lighting - $1,000
1979 Silk screen ventilation - $14,300
1984 Leaded windows - $6,000
1989-90 Roof - $36,600
1996 Parking/fire access (Lawrence/Goodrich) - $38,022
1999 Renovate for Student Acitivities Center - $2,430,251
Additional funds - $303,000
Architect: Bruner/Cott
1998 Restoration/installation of tenney window - $12,150
Cummings Studio
2004 Replace/upgrade sound system - $34,685
2004 Student Activities office moved to 2nd floor (7/04)
2005 Refinish Great Hall floor - $1,050
2006 Sprinkler system installation - $208,465
2008 Dance modifications - $50,000
2008 Structural repair - the Great Hall - $400,000
Goodrich House - 1915
(Frank Goodrich)
1968 Purchased
1995-96 Refurbishment and upgrades - $141,168
Refurbish student living space and upgrade systems
Architect: Christopher Williams
Grace Hall - renamed Chapin Hall (Grace Chapin)
Greylock Dining Hall (Greylock Quad) - 1965 1965 Residential houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining ) - $2,700,000
Architect: The Architects Collaborative
1982 Roof - $27,500
1982 Enclosure
1982 Greylock economizer - $54,520
1984 Classrooms, lighting and drapes - $12,000
1985 Classrooms - $7,600
1987 Carlisle ballasted roof - $10,000
1988 Classrooms carpet, tables and chairs - $30,000
1990-91 Floor - $19,825
1994 Emergency exit signs - $5,943
1994 High voltage - $10,836
1994 Heat coil - $3,590
1994 HV - $5,148
1995-96 Upgrade of kitchen and serving facilities (Driscoll, Faculty House, Greylock) - $134,000
2003 Interior/Exterior Painting - $6,850
2005 Plumbing repairs - $7,491
2005 Replace AHU and duct repair - $2,000
2005 Roof replacement - $29,093
2006 Greylock Dining and classroom A/C design - $40,000
2008 Makup AHU replacement - $50,000
Greylock Quadrangle - Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining - 1965 1964-65 Landscaping - $145,000
Architect: Carol R. Johnson & Associates, Inc.
1965 Residential houses built - $2,700,000
Architect: The Architects Collaborative
1978 Toilet repair - $7,500
1992 Sidewalk/parking lot improvements - $493,266
1996 Greylock Housing Renovation Phase I - $244,000
Code deficiencies and network cabling
2000 Greylock Housing Renovation (Bryant/Mark Hopkins) - $2,500,000
Architect: Black River Design
Contractor: MLB
2001 Greylock Housing Renovation (Carter/Gladden) - $3,268,596
Architect: Black River Design
Contractor: MLB
2003 Greylock vault oil switch replacement - $120,000
2005 Transformer replacement - $42,463
2006 Residence hall emergency lighting replacement - Greylock Quad - $80,000
Griffin Hall - 1828
(Edward Dorr Griffin)
1828 Originally had double entrance and stood near Main Street. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built); library built 1847; and lecture room, moved to northeast in 1904 and remodeled. The building was originally called "the brick chapel," and was named Griffin Hall in 1859.
Architect: Harding and Seaver
1952 Restored - $29,000
Designed by: Peter P. Welanetz, PE
1972 Ladies room
1982 Room 2 and 7: carpet and seating - $11,500
1988 Asbestos removal in basement only - $35,120
1988 Cupola restored
1989-90 Paint room 3 - $12,725
1995-97 Phases I & II Renovation
Design - $600,000
Construction - $1,750,000
Construction - $400,000
Architect: Childs Bertman Tseckares
1997 Steam line - Thompson Chapel/Griffin - $295,559
2000 Griffin/AMT crosswalk lighting - $25,717
2006 Sidewalks repairs - Griffin/Chapel - $128,501
Grundy's Garage 1987 Basement: 2 faculty art studios
1988 Purchased - $445,000
1988-89 Bookstore - $165,945
1990-91 1914 Library - $33,840
Move 1914 Library to rear of bookstore; install wiring, lighting, heating, entrance ramps, and interior partitions.
Architect: David J. Westall, R.A. and Cheryl Meyers
2002 Art studio bathroom renovation - $9,808
2002 Insulate and wallboard - $2,634
2004 Interior/exterior painting - $8,600
Hardy House - 1946
(James G. Hardy)
1982 Renovation - $23,500
1992 Renovation and refurbishment to create a meeting room; upgrade furnishings - $49,997
2003 Interior/Exterior Painting - $8,760
2006 Fire escape - $54,917
Heating Plant - 1934 1934 Built
Architect: Cram and Ferguson
1953 Addition - $300,000
Architect: Lockwood Greene Co.
1965 Alteration and remodeling - $478,000
Designed by: Winthrop M. Wassenar, PE and A.B. Stanley
1965 Replace 60,000 lb. boiler
1970 Addition and alteration (oil storage facility) - $615,000
Engineer/Architect: Lockwood Greene Co.
1976 Heating Plant/Gym main steam line - $2,000
1976 Heating Plant/Lasell steam line - $4,500
1976 Oil Storage tank - $13,500
1979 Stack repairs - $16,000
1979 Electrical line replacement - $25,000
1980 Heating Plant survey - $47,000
1984 Economizer - $127,700
Engineer: Pope Engineers
1984 Chimney - $17,140
1987-89 Co-generation - $340,900
Architect: van Zelm, Heywood and Shadford
1993 Stack - $32,500
1994 Study - $13,960
1996 Install gas line and connection to boilers - $107,000
1997-01 Heating Plant upgrade - $969,859
Study 1996 - $100,000
Replace/Upgrade boiler and peripheral equipment - $275,000
Replace failed roof tubes in Boiler #2 - $55,000
Design - $138,000
2002 Boiler 3 replacement - $3,300,000
Architect: Childs Bertman Tseckares
General Contractor: Pizzagalli
2002 Electrical cogeneration - $2,700,000
Architect: Childs Bertman Tseckares
General Contractor: Pizzagalli
2003 Auxiliary system - $693,889
2003 High voltage distribution system expansion - $349,974
Electrical systems repairs - $775,000
Engineering Consultant: VanZelm, Heywood and Shadford
General Contractor: Pizzagalli
2004 Chimney repair - $3,850
2004 Insulation - $2,900
2004 Metasys Interface for Turbine Generator - $22,500
2004 Oil tank repair - $455,000
2004 Platform - $39,781
2004 Repair oil piping - $3,573
2004 Repipe DA tank - $18,043
2004 Steam distribution system - $50,000
2004 Oil (#6) Tank Work - $274,961
2004 High Voltage Distribution System Expansion - $349,974
2005 Boiler #3 access and cleanouts - $7,349
2005 Drainage redirection - $8,325
2005 Install check valve on DA tank - $2,500
2005 Install stairs to #6 oil tank - $32,360
2005 Interior/exterior painting - trim - $10,800
2005 Miscellaneous projects - $27,025
2005 Replace feeder F8 - $18,800
2005 Steam distribution system insulation - $2,900
2006 Miscellaneous projects - $81,126
2006 Redundant feed pump #3/decom #1 - $90,494
2007 Expansion joints - $45,438
2008 Miscellaneous projects - $35,000
Hopkins Memorial Forest/Rosenberg Center (Buxton Farms)
(Arthur E. and Ella M. Rosenberg)
1906 Carriage House built
1933 Land donated to College by wife of Amos Lawrence Hopkins
1935-68 Land by USFS for research
1968 Hopkins Forest returned to College
1976 Develop section "A" - $13,200
1976 Develop section "C" - $1,100
1977 Carriage House renovated
1979 Planning - $12,200
1979 Section "A" operations - $52,000
1991 Purchased Birch Brook Watershed Land 81.4 acres - $50,000
2005 Wire Bridge Farm Land Acquisition, 82 Acres - $200,265
2007 Move weather tower and weather shack
Hopkins Hall - 1897
(Mark Hopkins)
1897 Based on Romanesque style of H.H. Richardson; memorial to Mark Hopkins (d. 1887) - $87,000
Architect: Francis Allen & Kenway (Boston)
1956 Restoration - $42,500
Designed by: Peter P. Welanetz, PE
1962 Alterations - $15,000
Designed by: Peter P. Welanetz, PE
1967 Hopkins Hall to Stetson Library: steam tunnel - $30,000
Engineer: Lockwood Greene Co.
1971 Dean's office, 2nd and 3rd floor offices
1972 Sprinkler system - $15,000
Engineer: M & W Heating, Inc.
1972 Telephone switchboard
1973 Classrooms
1982 Basement offices - $6,470
1982 Business office alterations - $21,350
1984 Basement - $28,640
1984 Office renovation - $8,600
1984 Telephone room - $321
1986 Financial Aid Office - $8,810
1986 Office renovation - $8,500
1987 Total asbestos removal - $159,340
1987-89 Total renovation - floor and wall removal; new addition - $9,300,000
Architect: Architectural Resources Cambridge, Inc.
General Contractor: Barry Bette and Led Duke
1990 4th floor classrooms - $5,890
1990 Interior accessories - $20,800
1991 Registrar's office - $3,764
1991 Hopkins Hall - $5,208
1993 Hopkins/Sawyer: air conditioning - $745,942
1994 Treasurer's office - $23,086
1994 Public relations' office - $11,768
1995 North entry - $24,943
1996 Air balance (Chandler, Hopkins, Chapin, BMC) - $4,021
1996 Registrar's office expansion - $10,038
1996 Financial Aid office - refurbish reception area - $1,201
1996 Install safety glass - $10,575
1997 Refurbish President's outer office - $15,049
1999 Accounts Payable new furniture - $8,000
1999 President's Office inner office - $4,000
2000 Data control workstations - $14,349
2001 Dean's office - $6,053
2001 Public Affairs office - $15,875
2001 Renovation Security office - $3,000
2002 President's office - copier/mail room - $10,100
2003 President's office - conference room
2003 President's office - kitchen - $5,076
2003 Provost office - $9,710
2004 Generator - $26,000
2005 Lighting - $5,440
2006 Lighting replacement - $35,789
2006 Fire alarm replacement - $58,034
2006 Communications room uprades -$18,071
2006 Lighting replacement - $70,000
2006 Telephone room fire suppression - $15,579
2008 Sewer and sanitary line - Morgan/Hopkins - $60,000
Mark Hopkins House - 1965
(Mark Hopkins)
1965 Residential Houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative
1977 Roof replacement - $10,000
2000 Greylock Housing Renovation (Bryant/Mark Hopkins) - $2,500,000
Architect: Black River Design
Contractor: MLB
2001 Mark Hopkins/Bryant exterior painting - $26,272
2004 Roof Replacement - $54,500
Susan Hopkins House - 1920
(Susan Sedgwick Hopkins)
1969 Purchased
1975 Sprinkler system - $11,100
1997 Refurbishment and upgrades - $160,094
Additional Funding - $67,000
Refurbish student living space and upgrade systems
2006 Residence hall access - Matrix - Susie Hopkins and Tyler - $20,786
Hopkins Observatory - 1837
(Albert Hopkins)
1837 Built by Professor Albert Hopkins and students near East College- $2,075
1850's Moved to the south end of Berkshire Quad
1962 Observatory moved to the north end of Berkshire Quad- $50,000
1962 New planetarium in Observatory - $25,000
Designed by: Spitz Laboratories
1974 Mehlin Memorial
1983 Renovation - $16,000
1988 Rebuild Turret Room - $5,000
1997 Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000
2004 A/C Installation - $35,589
2005 New Projector - $366,824
Hubbell House - 1872
(Mary Hubbell)
1974 Purchased
1984 Rewire - $27,000
1991 Hubbell/Sewall front doors - $4,721
1996 Fire stair - $40,221
2001 Renovation - $276,543
Modify existing halls/stairwells and upgrade systems
Architect: David Westall
Contractor: Renau
2004 Interior/exterior painting - $10,865
Jenness House - 1895
(Arthur Freeman Jenness)
1966 Purchased
1990 Multicultural Center - $27,300
1991 Furniture & renovations - $7,935
1991 MCC - $10,944
1996 Relocate from 30 Grace Court to 35 Grace Court - $125,000
Engineer: Vince Guntlow
2000 MCC renovation - $29,900
Jesup Hall - 1899
(Morgan Ketchum Jesup)
1899 Campus Center built
Architect: George Tilden
1908 Remodeled by: J.S. Oakman '99
1959 Restoration - $20,000
Designed by: Peter P. Welanetz, PE
1979 Install two west entrance vestibules - $3,500
1982 1914 book dispensary renovation - $5,690
1984 Conversion to Computer Center - $1,960,500
Architect: John Jordan, P.C.
1990 Computer network equipment - $2,665,050
1990 Railing - $12,830
1990-91 Lobby floor - $13,272
1992 Room 205 - $9,402
1993 Room 112 - $19,953
1994 Cooling tower repair - $3,124
1994 Computer Center cable - $300,000
1995 Computer network - $450,000
1996 Computer network - $441,909
1997 Air conditioning - $28,895
1997 Jesup 24 hour room - $16,501
1999 Power backup system - $230,000
1999 Network rewiring - $390,000
2000 Cooling tower - $38,863
2000 Fire alarm - $48,000
2000 Network rewiring - $390,000
2001 Network rewiring - $385,000
2001 Card reader access - $3,000
2001 Rooms 313 & 314 wall - $1,234
2002 Office conversion -$26,000
2002 Replace Locknetics with card reader system - $7,500
2002 Secure storage area - $2,500
2002 Reorganize WSO space - $2,442
2002 Convert room to office space - $36,877
2002 Secure storage area - $2,500
2002 Network rewiring - $325,000
2003 UPS - $330,000
2003 Install Locknetics/Jesup and Stetson Media Labs - $2,054
2003 Install Locknetics/computer machine room - $918
2003 Network rewiring - $190,000
2003 UPS - $378,858
2004 Network Academic Building CAT 3 replacement - $121,000
2004 Network Chemistry and Biology Upgrades - $70,000
2004 Network dorm CAT 3 replacement - $42,000
2004 Network fiber loop upgrade - $140,000
2004 Network Mears CAT 5 replacement - $60,000
2004 Add lighting and dimmers to 205 and 207 - $539
2004 Jesup 5kv Feeder XLP Replacement - $14,500
2004 Jesup and Mears chemical storage upgrade - $8,439
2004 Jesup A/C and UPS design - $332,500
2005 Communications network upgrade - $370,000
2005 West foundation landscaping - $10,000
2006 Computer room fire suppression - $59,144
2006 Network communication upgrade - $365,000
2006 Wireless Implementation - $572,427
2006 Main computer room divider - $10,603
2006 Room 101 media lab lighitng modifications - $4,383
2007 Accessibility entrance design - $45,000
2007 Network communication upgrade - $420,000
2008 Accessibility entrance construction - $350,000
2008 Chiller and FCU replacement - $50,000
2008 Network communication upgrade - $548,500
Jewish Religious Center - 1989-90 1989-90 Built - $1,457,450
Architect: Herbert S. Newman Associates, AIA, P.C.
General Contractor: GSS Construction
1996 Replace chimneys - $4,294
1999 Card reader access - $11,000
2004 Interior/exterior painting - $6,400
2005 Sewer line replacement - $13,500
Keck House - renamed Chadbourne House
Kellogg House (CES) - 1920
(Ebenezer Kellogg)
1978 Library
1978 Conversion to Center for Environmental Studies (CES) - $41,000
1978 Extension of steam line - $6,000
1988 Fire alarm system - $3,800
1991 CES land - $50,000
1995 CES Matthew Cole Library - $350,729
Architect: Ann Beha Associates
1996 Renovate existing library to offices - $24,746
1996 Reroof existing main building - $6,800
1997 Construct snow guard - $5,000
2002 CES office renovation - $1,976
2008 Kellogg relocation and renovation for Stetson/Sawyer Project
Lambert House - c. 1900
(Anna Elizabeth Lambert)
1969 Purchased
1975 Sprinkler system - $10,500
1996 Emergency/exit light upgrade (Lambert/Milham) - $8,050
2000 Upgrade systems - $105,862
Lansing Chapman Rink - 1953
(William Lansing Chapman '10)
1953 Hockey Rink and machinery building - $100,000
Architect: Mollenburg and Betz
1954 Warm up shed: restoration
1961 Warm up shed: restoration
1962 Hockey Rink canopy - $176,500
Architect: Lockwood Greene Co.
1969 Total enclosure and connecting building - $900,000
Engineer: Lockwood Greene Co.
1970 Landscaping and parking lot
1973 Sound system - $13,000
1974 New dasher boards - $23,000
1979 Machinery repairs - $7,500
1981 Hockey Rink roof
1984 Hockey Rink drape - $12,000
1985 Hockey Rink lights - $12,690
1985-86 Rebuild Zamboni - $5,000
1986 Chiller - $27,030
1988 New roof insulation - $230,000
1989 Roof - $240,090
1991 Hockey Rink oil recovery - $6,383
1992 Repairs - $72,955
1992 Roof repair - $38,895
1993 Hockey Rink/The Log steam line - $18,277
1993 Zamboni - $14,336
1993 Locker room floor - $14,480
1995 Locker room - $156,000
1995 Replace pumps - $11,000
2000 Women's hockey bench storage units - $2,195
2001 Hockey Rink dasher boards - $167,938
2003 Hockey Rink Renovation - $922,021
Engineer: RFS
General Contractor: American Refrigeration
2004 Gate Installation - $9,990
2004 Roof replacement - $48,237
2005 Locker rooms/rest rooms flooring - $35,000
2005 Refinish bleachers - $6,570
2008 Ice rink - install oxidizers - $25,000
Lasell Gymnasium - 1886
(Edward Lasell '28 and Josiah Lasell '84)
1886 Built
Architect: J.C. Cady & Co. (NYC)
1928 South extension of gymnasium
Architect: Densmore, Leclare and Robbins (Boston)
1965 Swimming pool improvements
1965 Locker room improvements
1968 New electrical substation - $18,000
Engineer: Lockwood Greene Co.
1970 Women's athletic facility - $125,000
Architect: Lockwood Greene Co.
1973 Temperature controls - $12,000
1973 Freshman court resurfaced - Tartan
1973 Trainer's room, offices
1975 Women's lockers - $15,000
1978 Pool-new backwash valve and repair piping - $4,000
1979 Electrical distribution - $20,000
1979 Clock tower roof repair - $12,500
1980 Two north entry vestibules - $4,000
1980 Security locks - $2,500
1980 Bryant/Lasell roof repairs - $22,500
1982 Foldback bleachers - $11,170
1984 Sidewalk - $16,710
1988 Major renovation - $3,000,000
Architect: Cambridge Seven Associates
1990-91 Dance Studio New Lighting System- $50,000
1991 Compressor - $3,800
1991 Lasell/Chandler signage - $7,800
1994 Valve - $1,975
1994 Gutters - $34,960
1995 Lighting - $3,000
1997 Replace old gutters with new - $13,000
1999 Electrical service upgrade - $47,500
1999 Office renovation - Gary Guerin/Dave Barnard - $9,000
('99 R&M Athletic Projects)
2000 Crew tanks - $5,925
2000 Gym clock - $60,807
2003 Interior/Exterior Painting - $11,240
2006 Install manual walk-drawn divider curtain - $5,000
2007 Fitness Center Rehabilitation - $382,000
2008 Basketball court lighting upgrade - $40,000
2008 Fitness Center Expansion - 3rd floor (formerly the Dance Studio) - $520,000
Lawrence Hall - 1846
(Amos Lawrence)
1846 Octagonal library built - $7,000
Architect: Thomas Tefft (Providence)
1890 East and west wings
1915 Addition at rear
1926 Addition at rear
1926 Art Museum
1938 Addition at rear
1957-58 Restoration - $37,000
Designed by: Peter P. Welanetz, PE
1969 Photo lab
1976 Goodrich Hall/Lawrence steam line - $9,000
1977 Security system - $5,300
1979 Security system - $3,000
1982 Classrooms - $30,000
1982 Photo lab renovation - $23,300
1982 Roof repairs - $32,500
1983 Museum of Art - Phase I - $4,980,000
Architect: Moore, Grover & Harper
1984 Classrooms - $30,000
1986 Museum of Art - Phase II - $2,571,500
Architect: Centerbrook Architects, Inc.
1991 AC compressor - $3,713
1991 WCMA - $3,400
1992 Art Department office - $7,130
1992 Roof - $15,000
1992 Art slide library - $4,177
1994 WCMA dock/spray booth - $3,033
1994 Art museum security upgrade - $24,842
1996 Parking/fire access(Goodrich Hall/Lawrence) - $38,022
1997 Lawrence Hall classroom upgrade - $151,776
Architect: Bob Holdridge
2001 Central security - $50,000
2001 Slide library renovation - $3,203
2002 WCMA utilities - $154,416
2004 Upgrade restrooms - $77,083
Architect: Centerline
General Contractor: Renau
2005 Rose Gallery Renovation - $210,190
Architect: Centerline
General Contractor: Renau
2005 Interior/exterior painting - exterior trim - $3,880
2006 Gallery HVAC renovation study - $50,000
2006 Fire alarm replacement/upgrade - $52,409
2008 WCMA master planning - $100,000
2008 Replace wheelchair lift - $16,000
2008 Roof replacement - $72,000
Lehman Hall - 1928
(Herbert Lehman '99)
1928 Built
Architect: Cram and Ferguson
1972 Toilets and heating
1976 Rooms in basement - $20,000
1988 Renovation - wiring, carpet, paint, computer, phone, fire alarm, radiation - $12,840
1988 Rewiring and upgrades - $397,724
1998 Egress - $80,000
2004 Interior/exterior painting - $7,000
2004 Fitch/Lehman Sprinkler System - $311,119
2007 Exterior stair rebuild - $150,000
Mather House - 1840
(Benjamin F. Mather)
1956 Restored - $37,000
Architects: William Gass and Peter P. Welanetz, PE
1971 Converted to Admission Office
1976 Addition - $20,000
1984 Renovation Admissions Office - $114,500
Architect: David J. Westall, R.A.
1995 Refurbishment - $22,239
1996 Air conditioning - $25,000
2002 Relocation to Stetson Court and renovations - $497,187
Remove shed-roofed addition, site work, install new heating system
Architect: Thomas Bartels
General Contractor: Renau
Mears House - Theta Delta Chi - 1925
(Brainerd Mears)
1925 Built
Architect: Cram and Ferguson (Ralph Adams)
1968 Photo lab
1984 Alumni and Development Offices - $477,300
Architect: John Jordan, P.A.
1984 Offices - $18,470
1984 Roof - $66,890
1986 Office alteration - $3,900
1986 Alteration - $60,690
1987 Asbestos removal complete - $23,590
1988 Enclosed porch and install new power file - $60,000
1994 Sewer - $2,083
1997-98 Renovation/AC - $220,339
2000 Conference room conversion - $14,793
2003 Research office - $19,509
2003 Landscape East Foundation - $14,859
2004 Interior/exterior painting - $6,032
2004 Network CAT 5 replacement - $71,654
2004 Water/Sewer Lines - $23,500
2005 Darkroom conversion - $7,356
2005 Interior/exterior painting - $10,000
2006 TDX room upgrade - $4,256
Mears West - formerly Sears House 1986 Purchased
1987 Renovation - $26,350
1987 Renovated for Alumni Office expansion - $556,400
Architect: John Jordan, P.A.
1989-90 Drainage - $3,505
Milham House
(Willis I. Milham 1894)
1977 Conversion to Graduate Art housing - $12,000
1977 Fire alarm, smoke and heat detector, emergency lights - $14,000
1996 Emergency/exit light upgrade (Lambert/Milham) - $8,050
2000 Upgrade systems - $244,611
2005 Water/sewer lines - drainage redirection - $4,832
Miller House 1993-94 Purchased - $375,431
2004 Interior/exterior painting - $13,500
Mission Park - 1971
(Samuel John Mills 1809)
(Samuel Chapman Armstrong 1862)
(James Bissett Pratt 1898)
(Tyler Dennett 1904)
1971 Residential houses - $5,415,000
Architect: Mitchell-Giurgola Associates
1972 Landscaping and planting - $14,000
Architect: Carol R. Johnson Associates, Inc.
1979 Mission Park/Fitch steam line - $29,500
1979 Dining hall carpet - $7,900
1979 Renovation - $22,500
1979 Roof repair - $10,000
1980 PA system - $8,000
1980 Special alterations - $22,500
1984 Energy management - $35,000
1984 Roof - $23,470
1984 Armstrong Recreation Room floor - quarry tile - $4,900
1986 Exterior panels: caulk, precast concrete - $10,000
1990-91 Renovations - Phases I, II and III - $2,885,000
1991 Reheat coils - $82,835
1992 Dining walkway - $4,796
1992 Parking lot - $19,437
1993 Dining enclosure - $18,714
1993 Air handler - $7,330
1993 Roof - $117,202
1996 Transformer replacement - $38,604
($38,572 insurance settlement)
1997 Fire alarm upgrade - $31,250
1999 Exterior caulking - $178,314
2002 Furniture - $407,067
2002-03 Mission Park Renovation Phase I
Dining Hall Renovation - $3,061,876
Architect: CenterLine
General Contractor : Breadloaf
2004 Mission Park Renovation Phase II
Student Life Improvements - $1,835,376
Network Upgrades - $650,000
Life Safety and ADA - $3,283,919
Architect: Centerline
General Contractor: Breadloaf
2006 Construct larger shed - $2,490
2006 Electrical distribution - replace feeder from Mission Park to Sage - $65,000
2008 Electrical distribution - modify vault - $300,000
Morgan Hall - 1882
(Edwin Denison Morgan)
1882 First campus building to be connected to a college heating plant. It was the first dorm to have plumbing, including indoor bathrooms.
Architect: J.C. Cady & Co. (NYC)
1955-56 Restoration - $14,000
Designed by: Peter P. Welanetz, PE
1965 Toilets
1972 Renovation - $759,000
Architect: Winthrop M. Wassenar, PE
1984 Sidewalks - $4,340
1985 Drainage - $9,000
1990-91 Investigate and design upgrade - $75,000
1991 Roof - $6,500
1991-92 Renovation - $1,572,568
Architect: Weese Langley Weese
2005 Exit Stairs Replacement - $90,000
2006

Renovation design - $200,000
Construction - $6,089,058
Eliminate center stairways, upgrade finishes and systgems, create common rooms and kitchen
Architect: Black River Design
General Contractor: Barr & Barr

2008 Sewer and sanitary line - Morgan/Hopkins - $60,000
Morley Science Laboratories - 2001
(Edward William Morley)
(see Schow Science Library)
1993-94 Unified Science Center Planning - $125,000
1995-01 Design and Construction - $47,827,700
Architects: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co.
1997 New parking lots-Thompson Health Center/Brooks
Architect: Carol R. Johnson Associates, Inc.
1997 Property acquisition (Siskind House) - $342,394
2000 Peter Pond sculpture - $269,244
Landscape Architect: Carol R. Johnson Associates
Sculpture: Ursula von Rydingsvard
2003 Neuroscience lab renovation 022 - $254,012
Paul Solomon's office - $19,394
Architect: Einhorn Yaffee Prescott
General Contractor: Tierney
2004 Morley Circle landscaping - $13,280
2004 Shower Modification - $13,500
2006 Greenhouse controls - $278,626
2006 MSL chiller rebuild - $30,000
2006 MSL chiller/Chiller Plant VFD installation - $47,000
2006 MSL retrocommissioning - $54,106
2008 Chiller #3 repair - $95,000
2008 Drainage field replacement - $15,000
Mt. Hope/Elm Tree House 1990 Renovation - $356,970
1991 Remove oil and gasoline storage tanks; repair retaining wall along entrance road, repair water filter for elm Tree House; replace electrical distribution panel in Elm Tree House; remove a portion of retaining wall and upgrade banking at Cow Barn- $128,000
1999 Renovation/code compliance - $538,966
Architect: Einhorn Yaffee Prescott
2000 River wall - $34,366
2002 Renovation - $37,519
2003 Renovation - $25,000
2003 Replace oil tanks - $121,160
2003 Install new boiler - $37,789
2004 Faculty Housing Upgrades - Caretaker's House - $15,970
2004 Cow barn security fencing - $4,108
2004 Drapery replacement - $8,168
2004 Install new thermostats/heating system controls - $40,000
2004 Interior/exterior painting: Calf Barn - $17,499
2004 Interior/exterior painting: Elm Tree House - $25,819
2004 Mt. Hope roof replacement - $73,833
2004 Plumbing projects - treatment chamber upgrade - $5,000
2006 Bridge repair - $95,000
2006 Culverts - $155,524
2006 Interior renovation - $15,000
2007 Mt. Hope Road chip sealing - $75,000
2008 Historic/facility assessment - $35,000
2008 Walk-in cooler replacement - $30,000
North Campus Utility Plan 2007 Total project cost - $6,277,039
2004 Phase I - $3,500,000
Engineer: VanZelm, Heywood and Shadford
General Contractor: Breadloaf
2004 Chilled Water to Chapin - $350,000
2006 Phase II - $2,777,039
Engineer: VanZelm, Heywood and Shadford
General Contractor: Breadloaf
Oakley Center/Makepeace - 1936
(Francis Oakley)
(Charles D. Makepeace '00)
1987 E&G building, administrative offices
1992 Roof - $4,335
1997 Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000
Paddle Tennis Courts - 1976 1976 Erected
1988 Repainted - $2,500
1992 Heater - $3,000
Paresky Center - 2007
(David '60 and Linda Paresky)
2007 Total project budget - $44,500,000
2001 Programming and predesign- $1,000,000
2002 Design Consultants - $2,500,000
2004 Construction - $35,200,000
Architect: The Polshek Partnership
General Contractor: Breadloaf
2005 Contaminated Soil Clean-up and Additional Construction Cost
Additional funding - $8,500,000
Park Street Condos 2001 Purchase Unit #3-3A - $120,000
2002 Purchase Unit #2 - $250,000
2003 Purchase Unit #5 - $255,000
Parking Garage - 2003 2001 Preliminary Design - $400,000
2003 Sitework and Construction - $5,393,158
Architect: William Rawn Associates
General Contractor: Barr & Barr
Parsons House - 1846
(Eben B. Parsons 1859)
1974 Purchased
1996 Emergency/exit lights (Agard, Faculty House, Ft. Hoosac Parsons, Sewall, Thompson, West College) - $20,868
2001 Renovation - $245,827
Modify existing halls/stairwells and upgrade systems
Architect: David Westall
2004 Interior/exterior painting - $6,500
Perry House - Alpha Delta Phi
(Arthur Latham Perry 1852)
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood - $160,000
Engineer: Automatic Sprinkler Corp.
1970 Major renovation - $90,000
1984 Storm damage - $18,590
1990-91 Porch roof - $26,173
1994 Renovation and refurbishment - $968,874
1994 Roof - $76,800
2005 Interior/exterior painting - $22,650
2008 Chimney rebuild - $35,000
Pine Cobble Facility Housing Development 1988 Purchased - $3,500,000
Contractor: J.H. Maxymillian, Inc.
1990-91 Housing subdivision - $7,612,000
1994-96 Slope stabilization - $300,460
2004 Fire hyrdrant replacement - $3,304
Poker Flats - 1993
formerly Stetson Apartments - 1946
1946 Faculty Housing Project
Architect: Kenneth Reynolds '16
1991 Preliminary Design - $200,000
Stetson Apartments conversion to student housing
1993 Design and Construction - $1,400,000
Architect: Einhorn Yaffee and Prescott
2004 Domestic hot water system - $10,352
2004 Matrix system - $9,676
2005 Sprinkler system design - Currier, Poker Flats - $30,057
2005 Steam distribution projects - repair infiltration - $7,500
2006 Residence halls sprinklers - Currier/Poker Flats - $372,666
Engineer: Fire Protection Services
General Contractor: Renau
2006 Steamline replacement - $189,155
President's House - 1801
(Samuel Sloan House)
1801 Samuel Sloan House, front part only; woodwork imported from Boston
1954 Garage - $6,000
Designed by: Peter P. Welanetz, PE
1961 Restoration - $35,000
1977 Decoration and furnishing - $35,000
1979 Refurnishing - $35,000
1985 Renovation - $170,300
1989-90 Roof - $11,170
1992 Repaint exterior - $109,449
1996 New roof (roof damaged by hurricane winds)- $74,962
2000-01 Upgrades - $448,000
2000-01 Upgrades - $100,000
2005 Exterior painting - $4,188
2007 AC upgrade - $400,000
Prospect House - 1962
(Prospect Mountain)
1962 Built - $1,254,000
Architect: Shepley Bulfinch Richardson & Abbott
1962-63 Prospect landscaping - $50,000
Architect: Olmsted Associates
1965 Partition soundproofing
1968 Berkshire/Prospect boiler - $8,600
Engineer: Richard J. Libardi
1972 New doorways
1974 Wall soundproofing
1979 Fitch/Prospect steam line - $16,000
1979 Stairwell carpeting - $14,500
1980 Acoustical survey - $2,000
1984 Carpet rooms - $41,740
1985 Roof - $15,000
1985-86 Replace mattresses - $4,686
1986 Window replacement - $13,550
1986 Patio - $47,950
1986 Sound - $5,000
1990-91 Acoustics - $64,797
1998-99 Prospect/Fitch metal railing - $5,200
2004 Phase I - Summer '04 Renovation Project - renovate 1/2 of Prospect and relocate Radio Station to basement
Phase I Design - $250,000
Student Life Improvements Phase I and II- $1,703,089
Phase I Renovation - $1,675,000
Architect: Black River Design
General Contractor: MLB
2005 Phase II -Renovation - renovate the other 1/2 of Prospect - $1,798,180
Architect: Black River Design
General Contractor: MLB
Radio Station - WCFM - Baxter Hall 1971 Radio station
1979 Renovation - $4,000
2004 Relocation to Prospect Basement - $423,390
Received FCC approval 1/25/05
Architect: Black River Design
General Contractor: MLB
Rice House - c. 1900
(Richard A. Rice)
1982 Conversion - $21,660
1984 Furniture - $8,500
1993 Furniture - $8,000
1994 Renovations - $74,336
1997 Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000
Roper Center - 1962 1962 Addition to Stetson Library - $200,000
Architect: Hoyle, Doran and Berry
1962-63 Landscaping - $9,000
Architect: Olmsted Associates
1966 Seminar rooms - two computers
1968 Third floor offices
1973 Parking lot
1973 Personnel offices - $5,060
1984 Roof replacement - $10,330
1984 Roper Center Career Counseling - $113,000
Architect: John Jordan, P.C.
Rosenberg Center - see Hopkins Forest/Rosenberg Center
Sage Hall - 1923
(Mrs. Russell Sage)
1923 Built
Architect: Cram and Ferguson
1936 Gate between Sage and Williams erected
Architect: Cram and Ferguson
1965-67 Piping, radiation controls and toilets
1967 Furniture replacement
1969-70 Entry and room lighting - hung ceilings
1978 Flooring and wall
1979 Renovation - $94,500
1980 Williams/Sage egress and room alterations - $277,500
1982 Stairwell - $12,000
1988 Asbestos removal
1991 Water service - $9,387
1993 Williams/Sage Renovation Planning - $250,000
1994 Williams/Sage Design - $1,000,000
1995-96 Williams/Sage Renovation - $9,797,306
Architect: Einhorn Yaffee Prescott
General Contractor: Barry Bette & Led Duke
2004 Repair Sage C steps - $5,218
2006 Electrical distribution - replace feeder from Mission Park to Sage - $65,000
Saint Anthony Hall/Center for Development Economics - Delta Psi - 1886 1966 Center for Development Economics (CDE)
1971 Sprinkler system - $18,000
Engineer: Ashley Swift
1976 Emergency lights - $2,000
1978 Garfield/St. Anthony new steam line - $47,300
1994 Roof - $96,500
1996 CDE renovations and refurbishment
Design and Construction - $1,059,862
Additional Funding 1994 - $180,000
2004 Paint CDE trim and windows - $24,600
Saint John's Rectory 1984 Day care renovation - $12,000
1985 Day care renovation - $4,650
1994 Rectory renovations/building code - $13,826
2008 Rectory turned over to St. John's Church
Sawyer Library - 1975
(John Edward Sawyer '39)
1975 Built - $4,916,000
Architect: Harry Weese and Associates
1978 West entry slate floor - $2,100
1980 Electrical primary service - $20,000
1984 Offices - $6,500
1985 Stairs - carpet replacement with rubber tile - $18,880
1988 Signage system - $21,790
Designer: Jonathan Cutler
Fabricator: Soheil Mosun, Inc. (Canada)
1990-91 Design: $155,560
1990-91 Roof - $102,465
1990-91 Renovate lower level - $1,600,000
Update AV area, relocate Government Documents, and increase shelf space for book stora
Architect: Ben Weese
1991 Automation - $650,000
1993 Renovation - $3,200,000
Architect: Weese Langley Weese
1992 Computer wiring for new computerized catalogue system - $67,471
1993 Sawyer/Hopkins Hall: air conditioning - $745,942
1994 Leak repairs - $13,080
1994 Water line - $2,410
1994 Ramp - $24,728
1995 Work room - $12,700
1995-96 Sitework - Baxter, Chapin, Sawyer - $350,000
Architect: Carol R. Johnson Associates, Inc.
1999 Workroom - $22,000
2000 E-mail stations - $2,137
2000 Reference desk relocation - $12,027
2000 Electronic classroom - $5,050
2003 Renovate reference office - $19,545
2003 Shelving project - $6,789
Schow Science Library - 2001
(Nan and Howard Schow '51)
2001 See Morley Science Laboratories for construction history.
Architects: Einhorn Yaffee Prescott and Zimmer Gunsul Fresca
General Contractor: Gilbane Building Co.
2006 Schow acoustic upgrade - $19,446
2006 Study rooms-power to tabletops - $9,990
2008 Faculty lounge/office modifications - $30,000
Sears House - renamed Mears West
Seeley House - 1920
(Charles F. Seeley)
1976 Conversion to student housing - $12,500
1985 Conversion of Economics Department offices - $56,470
1997 Roof repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000
1998 Restoration - $54,563
Service Building - 1962 1962 Christmas Lake and brook fill and culvert project
1962 Service Building built - $203,000
Architect: William Kirby & Peter P. Welanetz, PE
1976 Storage building - $17,000
Fabricator: Agway, Inc.
1982 10,000 gallon regular gas tank - $13,000
1985 Garage - $257,000
Architect: David J. Westall, R.A.
1985 Thermal windows - $12,500
1985 Vent - $3,900
1985 Front office renovation - $40,500
1985 Replacement windows - $26,880
1986 Steam line from B&G to Garage - $3,160
1987 Offices and conference room - $50,000
Architect: David J. Westall, R.A.
1989-90 Dust collector - $5,050
1989-90 Roof - $70,765
1996 150 KVA transformer - $12,381
1995-97 Back offices and conference room
Architect: Christopher Williams
2003 Construct EH&S and Stockroom offices - $21,563
2004 B&G North - waterproof sidewalk - $29,467
2004 Hazmat shed paving - $10,500
2005 Paint Mixer - $2,548
2005 B&G North metal art studio interior/exterior painting - $3,675
2006 SPCC secondary containment construction - $30,000
2007 Digitizing print valut - $45,000
Sewall House
(Rev. Albert C. Sewall 1867)
1974 Purchased
1987 Interior door and lock replacement - $9,000
1991 Sewall/Hubbell front doors - $4,721
1996 Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College) - $20,868
1997 Fire alarm upgrade - $16,204
1999-00 Upgrade systems - $135,000
2008 Heating system replacement - $35,000
Shaw Boat House
(John A. Shaw)
1970 Restored
Architect: John Rose '63
1984 Boat house - $7,970
1992 Dock - $14,790
1996-97 Repair roof, grade/resurface yard, exterior/interior painting and general repairs - $19,847
1999 Sliding storage racks/launch dock - $7,000
('99 R&M Athletic Projects)
2006 Renovation - $22,471
2008 Renovation - $100,000
Siskind House 1996 Purchased - $342,394
2004 Boiler replacement - $20,233
2004 Conversion to office space - $1,300,000
Smith-Rudnick 2007 Athletic Office renovation - $37,066
South College - see Fayerweather Hall
Southworth Schoolhouse 2003 Acquisition and preliminary design: $400,000
2002-04 Design and conversion to faculty apartments- $5,504,500
Architect: Black River Design
General Contractor: Engelberth
2004 Water/sewer lines - $6,074
Spencer House - Chi Psi - 1909
(Philip Spencer)
1909 Built
Architect: James Purdon
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Fort Hoosac, Spencer, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp.
1970 Major renovation - $64,000
1984 Brickwork - $6,000
1985 Gutters - $8,260
1991 Roof - $26,420
1994 Renovation and refurbishment - $845,046
Architect: EDM
1994 Roof - $90,000
2004 Basement stair rework - $30,000
WLS Spencer Studio Art Building - 1996
(Wadsworth Littleford Stegeman)
1996 Built - $5,606,660
Architect: Carlos Jiminez Assoc. and Cambridge Seven Assoc.
1998 Movable light grid - $5,600
2001 Room 114 shelving & lighting - $2,250
2001 Gallery lighting - $4,650
2002 Soundproof 318 and 319 - $24,142
2005 Northwest plantings - $20,000
2006 Install incandescent lighting in 117, 120, 121 and 122 - $5,200
2006 Install sun-blocking curtains for 318 and 319 - $11,400
2006 Install standard TV studio scythe in 112 - $4,924
2006 Slide library lighting system replacement - $7,159
2008 Enclose 3rd floor lounge - $20,000
Squash Courts - 1938 1938 Built
Architect: Shreve, Lamb '04 and Harmon
1970 Lighting
1978 Lighting - $6,000
1982 Doubles court lighting - $3,100
1984 Walls - $28,150
1985 Refinish four squash courts - $28,100
1986 Courts (4) - $33,010
1988 Asbestos removal and reinsulation in sub-basement - $69,500
Simon Squash Center - 1997
(Carol Girard and Cynthia Stewart Simon)
1997 Renovation - Simon Squash Center - $3,800,000
Architect: Wurmfeld Associates
2004 Squash Courts refinish 6 courts - $6,300
2005 Squash Courts refinish 6 courts - $6,300
Stetson Hall - 1922
(Francis Lynde Stetson '67)
1922 Built - $750,000
Architect: Ralph Adams, Cram and Ferguson
1956 Library addition - $450,000
Architect: Cram and Ferguson
1967 Hopkins to Stetson Library - steam tunnel - $30,000
1976 Central Office Services - $17,000
1976 Storm windows - $4,500
1976-77 Library renovation - $744,000
Architect: Harry Weese and Associates
1978 Chapin Library and stacks: fire and security systems - $30,000
1978 Griffin, Stetson (old) offices, Weston, Infirmary storm windows - $9,500
1978 OCC refurbishing - $1,750
1979 Audio Visual - $12,000
1979 Library '57 additional repairs - $15,000
1982 Chapin Library security tie-in
1982 Audio Visual renovation - $43,160
1984 Chapin Library window replacement - $6,000
1984 404 - word processing - $7,000
1984 Audio Visual chairs - $4,580
1985 Seminar room - $3,050
1987 Classroom renovation: carpet, tables, chairs, chalkboards and wall carpet - $35,000
1987 Transformer - $70,000
1988 Chapin Library office display area - $33,010
Architect: David J. Westall, R.A.
1990-91 Roof - $25,875
1992 Renew finishes in public area adjacent to faculty offices - $122,661
1992 Gutters - $20,450
1992 Room 323 - $2,967
1993 Replace old high voltage feeder - $64,611
1993 History department office - $19,784
1994 Central Office Services new Xerox 5090 Duplicator and auxiliary equipment- $117,476
1995 Basement - $24,463
1995 Elevator/ADA & signs - $15,900
1995 Audio Visual air conditioning - $2,379
1997 Elevator recall for code requirements - $8,500
1997 Audio Visual - replace carpeting - $5,026
1997 Audio Visual renovation/refurbishment - $12,841
1997 Political Science offices - renovate department chair and secretary offices - $16,179
1998 Rekey doors - $18,603
1998 Fire alarm upgrade - $12,174
1998 Library stacks - $22,000
1998 Stetson Hall/Chapin Library egress - $25,000
1998 Faculty secretarial office - $15,400
1999 COS - Xerox 9900 and other equipment - $170,000
1999 OCC renovation - $25,000
2000 Political Science common area - $3,531
2001 Information Technology - create teaching space - $11,279
2002 Chapin Library cases - $1,585
2003 Install Locknetics/Jesup and Stetson OIT media labs - $4,400
Stetson/Sawyer Project 2006 Total project budget - $128,000,000
2003 Programming - $1,000,000
2004 Design: $2,000,000
Architect: Bohlin Cywinski Jackson
General Contractor: Barr & Barr
2005 Continued Design Work: $2,000,000
2006 Completion of Design and Construction: $123,000,000
2008 Off-Site Storage/Simonds Road Property Purchase and Development - $2,350,000
General Contractor: Barr & Barr
Taconic Golf Club - 1955 1955 Club House - $70,000
Architect: Seymour Saltus
1962 Club House addition - $55,000
Designed by: Peter P. Welanetz, PE
1962 Parking lot
1969 Alteration - $35,000
Architect: William Kirby, Jr.
1985 Women's locker room addition - $200,000
Architect: William Kirby, Jr.
1988 Bridges - $24,900
1989-90 Dams - $25,000
1995 Irrigation system
Taconic House - renamed Fort Hoosac
Thompson Biology Lab - 1893 1893 Built
Architect: Francis R. Allen (Allen & Collens)
1949-51 Biology Laboratory addition - $900,000
Architect: Des Granges and Steffian
1950 Lab major restoration - old section
1971 Library
1973 Basement
1976 Masonry repairs
1976 Furniture - $4,000
1976 Lab Renovation - $2,500
1977 Heat controls - $25,000
1977-78 1st floor labs - $97,000
1978 Greenhouse - $35,000
1978 Biology, Chemistry, Physics, Clark Hall insulation - $12,300
1979 Roof repairs - $40,000
1979 Lab Renovation - $160,000
1984 Elevator doors - $6,690
1985 Aquarium - $6,100
1987-92 Renovations:
1987-88 - Phase 1 - $273,985
1988-89 - Phase II - $204,680
1988-89 - Phase III - $70,150
1991-92 - Phase IV - $64,226
1988 Asbestos removal - $53,800
1989-90 Rewiring - $33,558
1991 Fume air handling unit - $10,987
1992 Animal test lab - $2,766
1992 Emergency lights - $17,870
1993 Fume hoods - $24,573
1993 Labs 021/014 - $39,174
1993 Foyer - $11,742
1994 Convert Biology #1 to lab - $38,531
1994 Bio 111 - $26,247
1995 Bio 111 - $43,542
1999-00 Unified Science Center: renovation - $3,102,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co.
2003 Lobby and student space furniture - $5,000
2004 Physics/Biology/Chemistry - repair exterior stone - $27,742
2004 Network Chemistry and Biology upgrades - $70,000
2006 Seating/carpeting room 112 - $68,000
2006 Sciences lighting improvements - $30,000
2006 Thompson Sciences masonry repair - $174,500
Engineer: Ryan-Biggs
2007 Thompson Sciences masonry repair - $155,000
Engineer: Ryan-Biggs
2008 Room 309 renovation - $45,000
2008 Rooms 003 and 004 - combine - $11,500
2008 Thompson Sciences masonry repair - $410,000
Engineer: Ryan-Biggs
Thompson Chemistry Lab - 1893 1893 Built
Architect: Francis R. Allen (Allen & Collens)
1915 Burned down
1916 Rebuilt
Architect: Francis R. Allen (Allen & Collens)
1941 Major addition: enlarged and modernized
1951 Physics and Chemistry parking lot
1958-61 Alterations - $75,000
Designed by: AB Stanley/Peter P. Welanetz, PE
1964 Laboratory remodeling - $75,000
Architect: William Kirby, Jr.
1966 Laboratory renovation - $42,000
Designed by: Winthrop M. Wassenar/Harold Warren
1968 Laboratory renovation: 2nd & 3rd floors - $125,000
Designed by: Winthrop M. Wassenar/Harold Warren
1972 Library expansion and room 41
1976 Masonry repairs
1976 Lab equipment and alterations - $14,400
1978 Biology, Chemistry, Physics, Clark Hall insulation - $12,300
1984 Laboratory renovation lower level west - $189,480
1985 Renovation - $29,400
1987 Asbestos removal: chemical storage room - $16,500
1988 Asbestos removal: room 36 and 37 - $7,500
1989-90 Electrical design - $22,730
1989-90 Lab - $16,300
1990-91 Upgrade service capacity and replace faulty wiring - $119,418
1990-91 Astronomy telescope - $130,967
1993 Ventilation upgrade - $302,758
1993 Chemistry rooms - $2,735
1994 Blackboards - $4,728
1999-00 Unified Science Center: renovation - $3,273,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co.
2004 Physics/Biology/Chemistry - repair exterior stone - $27,742
2004 Install blackout shades and Laser Interlock System - $2,983
2004 Network Chemistry and Biology upgrades - $70,000
2006 Sciences lighting improvements - $30,000
2006 Add natural gas line to 206 - $4,223
2006 Thompson Sciences masonry repair - $174,500
Engineer: Ryan-Biggs
2007 Computer Science Office Construction - $30,049
2007 Thompson Sciences masonry repair - $155,000
Engineer: Ryan-Biggs
2008 Thompson Sciences masonry repair - $410,000
Engineer: Ryan-Biggs
Thompson Hall - 1911
(Mary Clark Thompson)
1911 Infirmary built
Architect: Allen & Collens
1956 Infirmary addition and connecting passage
1978 Griffin, Stetson (old) offices, Weston, Infirmary storm windows - $9,500
1982 Renovation - $75,000
1986 Conversion from infirmary to dorm - $377,000
Architect: Hallock Architects, Inc.
1996 Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College- $20,868
1997 New parking lots (Thompson/Weston Field) - $400,000
1998 Renovation and refurbishment - $1,121,774
Architect: Thomas Bartels
2002 Student Parking Lot
Design and Construction - $300,339
Architect: Halvorson
2004 Lower parking lot screening - $5,400
2005 Interior/exterior painting - $16,145
2006 Sprinkler system - $182,467
Last student residence hall to be sprinklered.
Thompson Memorial Chapel - 1905
(Frederick Ferris Thompson '56)
1905 Compare the Gothic of Goodrich Hall
Architect: Francis R. Allen (Allen and Collens)
Windows: The Church Decorating Company (New York)
1954 Chapel parking lot
Architect: Olmsted Associates
1964-65 Chapel exterior major restoration
1978 Basement kitchen - $3,500
1979 Basement schematics - $2,500
1982 Hallway paint and light - $4,280
1983 Stained glass window repair - $18,000
1985 Chapel wall masonry repair - $65,000
1986 Wall rebuilt - $40,000
1987 Asbestos removal: tunnel under hallway - $14,900
1989-90 Lower level renovation - $109,045
1991 Basement offices - $10,166
1992 Storm drain - $15,000
1996-97 Steam line - Thompson Chapel/Griffin - $295,559
1997 Energy conservation including Chapel lighting - $25,000
1997 Chapel bells - $21,000
1998 Newman Association - $16,400
2000-01 Lighting/plaques/design - $275,000
2004 Centennial Celebration
Restore and clean masonry - $414,424
Architect: Ryan-Biggs
General Contractor: Allegrone
2004 Windows - lead replacement - $106,619
2005 Masonry Inspection - $56,178
2005 I&I investigation - $3,000
2006 Install hard-wired card access entry system - $2,781
2006 Install indirect lighting in Catholic space - $7,173
2006 Install new lighting in Newman Chapel - $4,500
2006 O'Connell room-fluorescent lighting replacement - $10,000
2006 Purchase miscellaneous furniture - $7,240
2006 Sidewalks repairs - Griffin/Chapel - $128,501
2008 Replace dimmer system - $45,000
Thompson Physical Lab - 1893 1893 Built
Architect: Francis R. Allen (Allen & Collens)
1949-51 Addition - $900,000
Architect: Des Granges and Steffian
1950 Lab major restoration - old section
1951 Physics and Chemistry parking lot
1961 Library expansion - $12,000
1964 First floor lab
1976 Masonry repairs
1976 Astronomy library - $3,000
1978 Biology, Chemistry, Physics, Clark Hall insulation - $12,300
1979 Astronomy dome - $18,900
1985 Renovation - $895,500
Architect: Hallock Architects, Inc.
1992 Physics library - $3,315
1993 Heliostat - $6,233
1996 Room 6 - new A/C unit - $15,488
2000-01 Unified Science Center: renovation - $2,218,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co.
2003 Renovate office and student lab
2004 Physics/Biology/Chemistry - repair exterior stone - $27,742
2004 Lab/Storage - $27,497
2006 Sciences lighting improvements - $30,000
2006 Conversion Room 014 - $2,801 (project cancelled)
2006 Thompson Sciences masonry repairs - $174,500
Engineer: Ryan-Biggs
2007 Thompson Sciences masonry repair - $155,000
Engineer: Ryan-Biggs
2008 Install handicap ramp - $120,000
2008 Thompson Sciences masonry repair - $410,000
Engineer: Ryan-Biggs
Thompson Center for Health Services - 1985
(Mary Clark Thompson)
1985 Built - $821,000
Architect: David J. Westall, R.A.
1994 Oil tanks - $14,119
1997 Director's office - $9,100
2002 Carpet and ceiling tiles - $4,441
2006 Convert xray room into meeting/office space - $1,750
Towne Field House - 1970
(Herbert S. Towne '21)
1970 Built - $1,000,000
Engineer: Lockwood Greene Co.
1977 Resurface floor - $12,000
1978 Volleyball courts - $11,000
1982 Storage addition - $35,670
Architect: David J. Westall, R.A.
1983-84 Resurface floor - $44,000 - Tartan(green)/Rekortan(red)
1985 Relamping - $16,750
1985 Roof - $123,000
1996 Bathrooms - $72,392
1997 Repair water line - $15,577
1997 Repair wood buttresses - $32,000
1997 Water line - $20,607
2005 Indoor Track Resurface - $100,008
Treadway House - 1917
(John Treadway)

1991 Purchase and Renovation - $75,000
Tyler Annex - 1972 1972 Built - $532,000
Architect: Unitec, Inc. and Gary Lindstrom & Assoc.
1996 Standby pumps/perimeter radiation (Garfield/Tyler Annex - $2,831
2001-02 Renovation and upgrade systems - $966,457
Architect/General Contractor: Breadloaf
John C. Tyler House - Psi Upsilon - 1925
(Lt. John Cowperthwaite Tyler '15)
1925 Built
Architect: Andrews, Jones, Briscoe & Whitmore
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Wood) - $160,000
Engineer: Automatic Sprinkler Corp.
1982 Interior door jambs - $13,000
1982 Interior renovation - $42,000
1986 Window replacement - $10,000
1999 Enclose stairway and upgrade systems - $50,000
2001-02 Renovation and upgrade systems - $1,282,174
Architect/General Contractor: Breadloaf
2006 Residence hall access - Matrix - Susie Hopkins and Tyler - $20,786
Unified Science Center - 2001 1993-94 Planning - $125,000
1995-01 Project Total Cost - $47,846,499
Design 2005 - $2,000,000
New Construction 1996 - $1,600,000
Construction 1997 - $13,000,000
Construction 1999 - $13,000,000
Construction 2000 - $6,200,000
Construction 2000 - $14,200,000
Complete Construction 2000 - $2,500,000
Architects: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co.
1996-97 New parking lots-Thompson Health Center/Brooks
Architect: Carol R. Johnson Associates, Inc.
1996-97 Property acquisition (Siskind House) - $342,394
2000 Peter Pond sculpture - $400,000
Landscape Architect: Carol R. Johnson Associates
Sculpture: Ursula von Rydingsvard
Vogt '58 House - formerly 63 Park Street
(Carl W. Vogt '58)
2000 Purchase - $487,000
2001

Total Project Cost - $1,594,717
Sitework - $150,000
Architect: Mark Hammer
General Contractor: MLB

2002 Sitework - $150,000
2002 Landscape projects - $30,000
2006 Build an inside door in main entrance - $1,481
2008 Level floors - $100,000
West College - 1790
(West Township original name of Williamstown)
1790 Built
1855 Remodeled - central door out, north and south doors cut in
1904 Remodeled and north door sealed up
1951 Burned January 2, 1951
1952 Rebuilt - $225,000 (fire 1/2/51)
Architect: Perry, Shaw, Hepburn, Kehoe and Dean
1982 Lounge - $11,000
1982 Steps and landscaping - $19,760
1996 Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College) - $20,868
1999 Renovation and refurbishment - $850,074
Architect: Primary Group
2005 Steam distribution projects - return line - $3,849
Weston Field/Structures - 1951 1951 Field house - $17,500
Designed by: Peter P. Welanetz, PE
1953 Press box built - $1,000
Designed by: Peter P. Welanetz, PE
1964-65 Rebuilding varsity baseball diamond
1969 Electric scoreboard
1972 Bleachers
1984 Bleacher replacement - $57,300
1984 Press box replacement - $95,000
Architect: David J. Westall, R.A.
1984 Weston Field survey - $3,000
1987 New track and relocate baseball field - $1,243,100
Architect: Saratoga Associates
1989-90 Communications - $5,700
1989-90 Well - $3,170
1991 Baseball warning track - $15,653
1993-94 Track re-coat - $70,000
1995 Bleachers - $11,500
1996 Correct drainage problem - $74,967
1996-97 New parking lots (Thompson/Weston Field) - $400,000
1998 25-second clock - $4,295
1999 Track repair - $6,000
2000 Baseball Grandstand - relocate and restore - $254,745
Architect: Christopher Williams
2003 Interior/Exterior Painting - Weston Press Box - $8,800
2004 Fence Repair - $63,397
2004 Renzie Lamb Synthetic Turf Field - $1,993,460
Architect/General Contractor: Clark Company
2006 Track repair and discus circle - $287,213
2008 Weston Field Improvements
Design and Construction - $17,600,000
Architect: Moser Pilon Nelson/Clark Companies
General Contractor: Daniel O'Connell's Sons, Inc.
Karl E. Weston Language Center - formerly Phi Delta Theta - 1905
(Karl Ephraim Weston '96)
1965 Alteration to former Phi Delta Theta Fraternity House
Designed by: Ralph W. Iacuessa
1966 Weston/Brooks parking lot - $19,000
Designed by: Winthrop M. Wassenar, PE
Architect: Daniel O'Connell & Sons
1966 3rd floor
1978 Griffin, Stetson (old) offices, Weston, Infirmary storm windows - $9,500
1982 Mail equipment
1984 Furniture - $6,300
1984 Personnel furniture - $3,500
1985 Lounge - $4,630
1987 Complete asbestos removal - $24,200
1987 Renovation - $12,600
1987 Classrooms and offices - $250,000
1987-88 New Language Lab - Phases I-III - $897,125
Architect: William Kirby, Jr. and David J. Westall, R.A.
1988 Roof repair - $25,000
1989 Language Lab renovation - Phase IV - $140,000
1992 Convert Conference offices to faculty offices - $150,000
2000 Room 34 alterations - $4,320
2001 Lab renovation - $39,706
2003 A/V room - $8,448
2006 Drainage - $1,097
2008 Renovation
Williams Club, New York - 1986 1986 Built - $520,500
Williams Hall - 1911
(Colonel Ephraim Williams)
1911 Built
Architect: Ralph Adams, Cram, Goodhue and Ferguson
1965 New doors
1967 Furniture replacement
1967-70 Piping, radiation controls and toilets
1969 Entry lighting
1976 New bathroom and partitions - $15,000
1979 Entry B bathroom - $17,000
1980 Williams/Sage egress and room alterations - $277,500
1986 Transformer - $32,100
1989-90 Paint - $11,680
1991 Replace transformer and cable from Williams to Mission Park - $94,000
1993-94 Williams/Mission Park steam line - $51,770
1993-96 Williams/Sage Planning 2003 - $250,000
Design 2004 - $600,000
Remove old transformer; clean out vault - $50,000
Design 2004 - $400,000
Design and Construction - $9,797,820
Architect: Einhorn Yaffee Prescott
General Contractor: Barry Bette & Leduke
2004 Repair Williams C steps - $5,218
Williams Oxford 1985 Acquisition - $804,000
1985 Improvements - $607,000
Architect: The Oxford Architects Partnership
1991 Renovation - $75,000
1996 Smoke detectors - $7,723
1998 Renovation (1st year out of 4) - $10,000
1999 Renovation (2nd year out of 4) - $10,000
2002 Refurbish 1 Morteon - $12,997
2003 Furniture - $2,500
2003 145 Banbury roof - $20,000
2003 Repave courtyard - $60,000
2005 33 Tenison Road, Cambridge
Purchase and Renovation - $1,142,155
2005 Renovation - $94,567
2006 Exterior repairs - $103,573
Wood House - Zeta Psi - 1905
(Hamilton B. Wood '10)
1905 Built - $15,000
Architect: John B. Snook, Inc. (New York)
1927 Library addition - $29,858
Architect: Charles C. May
1969 Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp.
1969 Major renovation - $88,000
1985 Drainage - $6,030
1999 Renovation and refurbishment - $1,047,897
Architect: Primary Group
Woodbridge House - c. 1900 1977 Conversion to student housing - $53,000
1997 Refurbishment and upgrades - $244,940
Additional Funding - $117,000
Refurbish student living space and upgrade systems
2004 Interior/exterior painting - $4,700
 

Updated 7 January 2008