Adams Memorial Theatre - 1941
(John Quincy Adams) |
1941 |
Built - $250,000
Architect: Hoyle, Cram and Ferguson
Technical Advisor: Stanley McCandless (Yale School of Drama) |
| 1941 |
Parking lot |
| 1963 |
New electronic light board |
| 1965 |
Parking lot and new road |
| 1974 |
Air conditioner replacement - $39,000 |
| 1975 |
Improvements - $41,000 |
| 1979 |
Rigging - $6,600 |
| 1980 |
Light board - $85,000 |
| 1980 |
Major renovation - $92,000 |
| 1982 |
Door hardware - $1,000 |
| 1983 |
Down stage addition - $937,000
Architect: Cambridge Seven Associates, Inc. |
| 1984 |
Asbestos removal - $4,390 |
| 1984 |
New stage - $9,000 |
| 1984 |
Door hardware - $1,000 |
| 1984 |
Reupholster seats - $35,000 |
| 1984 |
Dust collector - $6,000 |
| 1984 |
Asbestos removal - $4,390 |
| 1985 |
Curtain - $3,540 |
| 1985 |
Down stage air conditioning - $23,000 |
| 1986 |
Emergency lighting - $3,930 |
| 1987 |
Rigging - $46,500 |
| 1988 |
New roof-main stage - $8,000 |
| 1990 |
Sound system - $3,700 |
| 1992 |
Theatre relocation - $39,652 |
| 1993 |
Dance studio - $89,897 |
| 1993 |
Replace old high voltage wiring feeding AMT which runs between West College and the Faculty House - $50,000 |
| 1995 |
Pit cover/stage extension - $28,127 |
| 1995 |
Code upgrade - $6,928 |
| 1995 |
Replace sewer line - $10,000 |
| 1995 |
Rigging Phase I - $51,200 |
| 1996 |
Parking lot sewer line repair - $7,880 |
| 1997 |
Rigging Phase II - $132,658 |
| 1998 |
Office renovation - $28,000 |
| 2000 |
AMT/Griffin crosswalk lighting - $25,717 |
| 2002 |
New stage curtains - $12,897 |
| 2005 |
AMT Renovation - $3,200,173
Improvements - $1,762,027
Remove Downstage - 4,900 square feet
Architect: William Rawn Associates
General Contractor: Barr & Barr |
| 2006 |
Dressing rooms card reader expansion - $7,417 |
Agard House - Delta Phi - 1920's
(Harry L. Agard) |
1967 |
Purchased |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1971 |
Major restoration - $93,000 |
| 1979 |
Insulation - Agard/Fort Hoosac - $7,500 |
| 1984 |
Interior renovations - $33,500 |
| 1994 |
Egress 3rd floor - $66,615
Renovate 3rd floor creating five student rooms and satisfy public safety codes. |
| 1996 |
Emergency/exit lights (Agard, Parsons, Sewall, Thompson, Ft. Hoosac, Faculty House, West College) - $20,868 |
| 2004 |
Boiler - $11,616 |
| 2004 |
Flooring/carpeting - $9,000 |
| 2005 |
Summer '05 Renovation project
Design - $100,000 |
| 2005 |
Summer '05 Renovation project
Renovation - $1,899,349
Architect: Woodward, Connor, Gillies, Seleman
General Contractor: Renau |
| Agway/Denison Barns |
1977 |
Barn #1 |
| 1979 |
Barn #2 - $20,000 |
| 1984 |
Barn #3 - $16,950 |
| 1984 |
Gate - $8,730 |
| 1991 |
Cleanup - $14,975 |
| 2004 |
Replace sand/salt structure - $64,744 |
| 2004 |
Improve apron at sand/salt shed - $19,700 |
| Alumni House/The Log |
1941 |
Built
Architect: Kenneth Reynolds '16 |
| 1946 |
Dodge Room |
| 1952 |
West College room addition - $28,000
Architect: Kenneth Reynolds '16 |
| 1973 |
Sprinkler system - $14,000 |
| 1986 |
Renovation - $51,500 |
| 1993 |
The Log/Hockey Rink steam line - $18,277 |
| 2002 |
Renovation - $104,874
Architect: Westall
General Contractor: Renau |
| 2004 |
Hood Compliance Upgrade - $50,000 |
| American Legion |
2001 |
89 Spring Street - acquired property in exchange for construction of new building at 109-117 Latham Street, formerly the Meade Block |
| Athletic Complex |
2008 |
Master planning - $200,000 |
B&L Building - 2005
(formerly 100 Spring Street) |
2005 |
Total project cost - $4,371,104 |
| 2001 |
Acquisition - $300,000 |
| 2003 |
Design, Demolistion and Construction - $3,401,104
Architect: Burr & McCallum
General Contractor: Tierney |
| 2004 |
Additional funding: $670,000 |
Bascom House
Beta Theta Pi - 1913
(John Bascom 1849) |
1913 |
Architect: Harding and Seaver |
| 1966 |
Purchased |
| 1968 |
Major renovation |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1994 |
Renovation and refurbishment - $537,846 |
| 2003 |
Renovation: Convert to house Admission Department- $408,622
Architect: EDM
General Contractor: Renau |
| 2006 |
Drainage - $12,456 |
Baxter Hall - 1953
(James Phinney Baxter III '14) |
1953 |
Built - $1,500,000
Architect: Perry, Shaw, Hepburn, Kehoe and Dean |
| 1954 |
Freshman Quad landscaping and planting - $60,000
Architect: Olmsted Assoc. |
| 1955 |
Rathskeller - $18,250
Designed by: Perry, Shaw, Hepburn, Kehoe and Dean & William C. Bryant |
| 1970 |
Offices and freezers |
| 1971 |
Radio station-WCFM |
| 1972 |
Snack bar |
| 1976 |
Snack bar refurbishing - $5,200 |
| 1976 |
Mailroom - $18,800 |
| 1978 |
Chaplain's office - $1,000 |
| 1979 |
Lawn sidewalk - $4,500 |
| 1979 |
Radio station-WCFM renovation - $4,000 |
| 1984 |
Phase I renovation - $916,000
Architect: John Jordan, P.C. |
| 1984 |
Transformer - $90,100 |
| 1985 |
Phase II renovation - $515,000
Architect: John Jordan, P.C. |
| 1985 |
Electric loop - $18,000 |
| 1986 |
Feeder - $17,900 |
| 1992 |
Refrigeration conversion - $29,106 |
| 1992 |
Boiler - $25,074 |
| 1992 |
Elevator - $4,058 |
| 1994 |
Generator - $8,750 |
| 1995 |
Mailroom carpet - $9,500 |
| 1995 |
Egress - $38,039 |
| 1995-96 |
Sitework - Baxter, Chapin, Sawyer - $350,000
Architect: Carol R. Johnson Associates, Inc. |
| 1996 |
Hot water heater replacement - $11,485 |
| 1996 |
Mailroom - replace work area carpet - $6,317 |
| 1999 |
Student Activities Office - $20,000 |
| 2000 |
Front doors - $10,003 |
| 2000 |
Heating coils - $15,485 |
| 2001 |
New railing system - $35,000 |
| 2004 |
Baxter demolished 10/2004 |
| Berkshire Hall - renamed Fitch |
| Berkshire Quadrangle |
1959 |
Landscaping - $25,000
Architect: Olmsted Associates |
| 1963 |
Old campus concrete steps |
| 1963-64 |
Prospect landscaping and parking lot - $22,500
Architect: Olmsted Associates |
| 1979 |
Fitch/Prospect steam - $16,000 |
| 1991 |
Landscape - $116,839 |
| 2004 |
Landscape project - stone wall entrances - $12,800 |
| 2007 |
Quad landscaping - $94,121 |
| Berlin Ski Area |
1960-61 |
Development |
Bernhard Music Center - 1978
(Arnold Bernhard '25) |
1978 |
New music facility - Phase II - $2,300,000
Architect: Cambridge Seven Associates, Inc. |
| 1978 |
Furniture and equipment - $250,000 |
| 1984 |
Furniture - $11,500 |
| 1984 |
Tile floor |
| 1985 |
Light system - $14,400 |
| 1985 |
Air conditioning - $170,300 |
| 1990 |
Elevator repair - $4,350 |
| 1994 |
Storage facilities improvements - $3,507 |
| 1995 |
Emergency lighting - $8,762 |
| 1996 |
Reroof patio roof between Chapin/BMC - $4,775 |
| 1996 |
Air balance (Chandler, Hopkins, Chapin, BMC) - $4,021 |
| 1996 |
Tile floor between Brooks Rogers/Shainman - $4,270 |
| 1997 |
Build storage room for instruments - $6,405 |
| 1997 |
Patio roof repairs - $8,300 |
| 1998 |
Storage lockers/display case - $3,000 |
| 1999 |
Humidifier - $17,000 |
| 2001 |
Bernhard/Chapin wiring/video camera - $11,817 |
| 2001 |
Card reader door - $22,880 |
| 2002 |
Humidity control upgrades - $39,348 |
| 2003 |
HVAC upgrades - $58,962 |
| 2003 |
Audio room partition - $9,126 |
| 2004 |
Create new closet in Rehearsal Hall for equipment storage - $1,612 |
| 2006 |
Chilled water tie-in - $95,302 |
| 2006 |
Humidity controls upgrade design - $30,000 |
| 2007 |
Humidity controls upgrade - $168,861 |
| 2008 |
Music Department master planning - $150,000 |
| 2008 |
Storage solution - $90,000 |
Bronfman Science Center - 1968
(Edgar M. Bronfman '50) |
1966 |
Extension of Electrical Distribution System to Bronfman - $21,000
Engineer: Lockwood Greene Co. |
| 1968 |
Bronfman Science Center - $3,750,000
Architect: Benjamin Thompson & Associates |
| 1968 |
Landscaping - $34,000
Architect: Carol R. Johnson & Associates, Inc. |
| 1976 |
Equipment - $140,545 |
| 1976 |
Fire protection - $5,500 |
| 1978 |
West vestibule - $2,800 |
| 1979 |
Insulated drapes - $5,750 |
| 1979 |
Cage washer floor replacement - $3,000 |
| 1980 |
Aquarium refrigeration - $7,500 |
| 1980 |
Special alterations - $41,000 |
| 1982 |
Computer Center space study - $5,000 |
| 1982 |
Room subdivision - $3,800 |
| 1984 |
Auditorium: humidity control - $3,200 |
| 1984 |
Roof - $72,100 |
| 1984 |
Chillers - $19,900 |
| 1984 |
Auditorium stage drape - $4,000 |
| 1984 |
Air conditioning - $170,260 |
| 1985 |
Still - $3,750 |
| 1985 |
Basement classrooms - $501,000
Architect: Hallock Architects, Inc. |
| 1985 |
Book shelving - $35,000 |
| 1986 |
Micros and shelving - $38,950 |
| 1987-88 |
Fire alarm - $139,310 |
| 1989-90 |
Psychology office - $26,965 |
| 1989-90 |
Elevator - $1,774 |
| 1989-90 |
Fire alarm - $139,310 |
| 1990 |
Still - $6,290 |
| 1990 |
Lighting - $15,000 |
| 1991 |
Cooling tower upgrade - $1,415 |
| 1991 |
Steam coil - $2,677 |
| 1992 |
Room 236 - $11,012 |
| 1992 |
Room B22 - $2,482 |
| 1992 |
Air handler - $42,649 |
| 1992 |
Rooms 378 & 384 - $3,240 |
| 1992 |
Cage washer - $5,000 |
| 1992 |
Neuroscience lab - $15,787 |
| 1993 |
Psych/Legal rooms - $54,589 |
| 1993 |
Neurolab - $66,275 |
| 1994 |
Air handling unit replaced - $29,919 |
| 1994 |
HVAC controls - $38,650 |
| 1994 |
Chill retube - $11,237 |
| 1995 |
Carpet - $16,170 |
| 1995 |
AHU - $37,758 |
| 1996 |
Neuroscience lab (Solomon) renovation - $19,261 |
| 1997 |
Room 323 office renovation - $3,335 |
| 1999-00 |
Unified Science Center: renovation - $738,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co. |
| 2001 |
Renovate research labs 260 & 261 - $6,582 |
| 2001 |
Renovate 316 & 346 - $55,822 |
| 2002 |
Central stair ADA - $74,541 |
| 2003 |
Interior/Exterior Painting - $182,000 |
| 2004 |
Matrix Card Access Installation - $52,000 |
| 2004 |
Rail Replacement - $19,110 |
| 2004 |
Transformer Replacement - $73,963 |
| 2005 |
Auditorium Design - $48,675 |
| 2006 |
Auditorium Construction - $387,623
Architect: Centerline
General Contractor: Renau |
| 2007 |
Computer Science office construction - $30,049 |
| 2007 |
Psychology Office construction - $15,578 |
| 2008 |
Psychology Labs Renovation - $70,000 |
| 2008 |
Systems and roof repair - $120,000 |
Brooks House - Delta Kappa Epsilon - 1961
(Belvidere Brooks '10) |
1961 |
Built
Architect: Daniel O'Connell & Sons |
| 1966 |
Weston/Brooks parking lot - $19,000
Designed by: Winthrop M. Wassenar, P.E.
Architect: Daniel O'Connell & Sons |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1975 |
Major renovation - $20,000 |
| 1982 |
Kitchen - $15,000 |
| 1984 |
Windows - $22,300 |
| 1984 |
Patio - $33,750 |
| 1992 |
Conference move - $151,650 |
| 1996 |
Fire alarm, emergency/exit light upgrade - $23,837 |
| 2000 |
Renovation - $933,559
Architect: Thomas Bartels |
| 2003 |
B Parking lot expansion - 36 additional spaces- $166,604
Engineer: Vince Guntlow
General Contractor: Petricca |
| 2005 |
Conference Office lighting - $3,216 |
| 2005 |
Conference Office ventilation - $7,261 |
| 2008 |
Steam distribution - north of Brooks House - $30,000 |
Bryant House (Greylock Quad) - 1965
(William Cullen Bryant) |
1965 |
Residential houses (Carter, Bryant, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative |
| 1978 |
Roof replacement - $10,000 |
| 1980 |
Bryant/Lasell roof repairs - $22,500 |
| 1985 |
Roof (Carter, Gladden, Mark Hopkins, Greylock Dining) - $73,300 |
| 2000 |
Greylock Housing Renovation (Bryant/Mark Hopkins) - $2,500,000
Architect: Black River Design
General Contractor: MLB |
| 2001 |
Bryant/Mark Hopkins exterior painting - $26,272 |
Carter House (Greylock Quad) - 1965
(Franklin Carter) |
1965 |
Residential Houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative |
| 1979 |
Roof - $8,400 |
| 1984 |
Drapes - $20,000 |
| 1985 |
Roof (Bryant, Gladden, Mark Hopkins, Greylock Dining) - $73,300 |
| 2001 |
Greylock Housing Renovation (Carter/Gladden) - $3,268,596
Architect: Black River Design
General Contractor: MLB |
| Central Chilled Water Plant - 2004 |
2001 |
Preliminary site work and design - $250,000
|
| 2002 |
Design and Construction - $4,180,587
Architect: William Rawn Associates
General Contractor: Barr & Barr |
| 2007 |
MSL Chiller/Chiller Plant VFD installation - $47,000 |
Chadbourne House - formerly Keck House - 1920
(Paul Ansel Chadbourne) |
1971 |
Purchased |
| 1977-78 |
Conversion to student housing - $57,000 |
| 1982 |
Aluminum siding - $11,000 |
| 2003 |
Interior/Exterior Painting - $5,460 |
| 2003 |
Renovation Design - $50,000
Architect: EDM |
| 2004 |
Renovation - $497,798
Architect: EDM
General Contractor: Renau |
Chaffee Tennis House - 1973
(Clarence Chaffee) |
1960 |
6 hard surface tennis courts - $40,000
Designed by: Peter P. Welanetz, PE |
| 1973 |
Chaffee Tennis House - $13,000
Designed by: Peter P. Welanetz, PE |
| 1982 |
Rebuild courts - $11,500 |
| 1984 |
3 new hard surface tennis courts - $44,000 |
| 1989-90 |
Fence - $35,350 |
| 1991 |
Fence/drainage - $70,801 |
| New Chaffee Tennis House -
1998 |
1998 |
New tennis house/court improvements - $279,668
Torrance M. Hunt '44 Tournament Courts
Architect: Christopher Williams |
| |
1998 |
Tennis courts: repaint east end - $15,000 |
| 2000-01 |
Todd Hunt Tennis Center - $167,694
Construction of additional courts |
| 2004 |
Landscaping - $35,648 |
| 2005 |
Interior/exterior painting - $4,456 |
| 2006 |
Tennis court repair - $9,500 |
| 2007 |
Tennis court repair - $9,975 |
| 2008 |
Tennis court crack reapir - $12,000 |
| 2008 |
Tennis courts resurface - $35,000 |
Chandler Athletic Center - 1987
(John Wesley Chandler) |
1982 |
Feasibility study - $35,000 |
| 1987 |
Athletic facility: new gym/pool - $16,282,000
Architect: Cambridge Seven Associates, Inc.
General Contractor: Fontaine Brothers |
| 1988 |
Official opening |
| 1991 |
Chandler/Lasell signage - $7,800 |
| 1992 |
Signs - $10,283 |
| 1993-94 |
Athletic offices - $84,748 |
| 1996 |
Pool - replace stainless steel dampers - $7,269 |
| 1996 |
Air balance (Chandler/Hopkins/Chapin/BMC) - $4,021 |
| 1997 |
Beam detectors - Gym - $13,000 |
| 1999 |
Gym - expansion joints - $70,000 |
| 1999 |
Pool - rails around diving boards/purchase two diving boards - $8,000 (99 R&M - Athletic Projects) |
| 1999 |
Pool - concrete walls - $5,000 |
| 1999 |
Pool - CO2 storage shed - $15,319 |
| 1998 |
Chandler Plaza Replacement - $203,096 |
| 2001 |
Gym 35 second clock - $3,573 |
| 2002 |
Chandler Plaza - extend icemelt - $94,067 |
| 2004 |
Gym Dry-O-Trons - $13,926 |
| 2004 |
Gym ejector pump replacement - $2,695 |
| 2004 |
Pool locker rooms flooring - $13,500 |
| 2004 |
Pool repairs - $50,000 |
| 2005 |
Basketball court - refinish - $5,900 |
| 2005 |
Gym 2nd floor hallway flooring - $4,956 |
| 2005-06 |
Pool and roof repairs - drain pool and perform masonry repair work - $610,000
Architect: Moser, Pilon & Nelson |
| 2006 |
Pool timing system replacement - $13,000 |
| 2007 |
Basketball roof repair - $132,300 |
| 2007 |
Pool recaulking and waterproofing |
| 2008 |
Fire alarm installation and upgrade - $70,000 |
| 2008 |
Roof replacement - coaches offices - $46,000 |
| Chandler Commercial - 1987 |
1987 |
Retail spaces/athletic offices - $700,000
Architect: Cambridge Seven Associates, Inc. |
Chapin Hall - formerly Grace Hall - 1912
(Alfred Clark Chapin) |
1912 |
Built - $259,313; cost of organ - $45,800
Architect: Cram Goodhue and Ferguson |
| 1957 |
Restoration - $30,000 (1953 - $10,000)
Designed by: Peter P. Welanetz, PE and W.C. Bryant |
| 1976 |
Furniture - $15,000 |
| 1976 |
Equipment - $20,000 |
| 1977 |
Renovation Phase I - $400,000
Architect: Cambridge Seven Associates, Inc. |
| 1984 |
Floors in Trustee Room and stage - $9,940 |
| 1984 |
Windows - $6,000 |
| 1985 |
Woodwork - $11,000 |
| 1991 |
P.A. system - $3,718 |
| 1993 |
Replace roof - $113,850 |
| 1993 |
Storage - $3,980 |
| 1993 |
Security - $5,500 |
| 1996 |
Reroof patio roof between Chapin/BMC - $4,775 |
| 1996 |
Air balance (Chandler/Hopkins/Chapin/BMC) - $4,021 |
| 1997 |
Sitework - Baxter, Chapin, Sawyer - $300,000
Additional Funding - $50,000
Architect: Carol R. Johnson Associates, Inc. |
| 2001 |
Chapin/Bernhard wiring/video camera - $11,817 |
| 2002 |
Rekeying - $12,130 |
| 2002 |
Masonry repairs - rebuild front steps - $195,000 |
| 2004 |
Replace/Upgrade PA system - $38,842 |
| 2004 |
Lighting - $84,261 |
| 2004 |
NCUP chilled water to Chapin - $350,000 |
| 2004 |
Restore and clean masonry - $414,424 |
| 2004 |
Windows lead replacement $106,619 |
| 2005 |
Masonry inspection - $56,178 |
| 2005 |
I&I investigation - $3,000 |
| 2006 |
Add additional lockers in basement - $5,451 |
| 2006 |
Practice room soundproofing - $39,138 |
| 2008 |
Renovation/acoustic upgrade - $150,000 |
| Children's Center - 2007 |
2007 |
Total Project Cost - $6,100,000
Architect: DW Arthur Associate Architects
Contractor: Engelberth |
| 2003 |
Expansion Feasibility Anaylsis - $34,992 |
| 2004 |
Site Selection: $75,000 |
| 2004 |
Design: $370,575 |
| 2004 |
Design and Construction: $5,775,000 |
Clark Hall (Geology) - 1908
(Edward Clark '31) |
1908 |
Built - old Clark Hall (wooden) pulled down in 1886
Architect: Frank Wallis and William Rogers |
| 1954 |
Restoration - $12,000
Designed by: Peter P. Welanetz, PE |
| 1970 |
Renovation - $350,000
Architect: Lockwood Greene Co. |
| 1978 |
Biology, Chemistry, Physics, Clark Hall insulation - $12,300 |
| 1988-89 |
Geology Lab: renovation to sub basement - ventilation system for 105 and basement - $117,913 |
| 1990-91 |
Roofs and gutters - $45,000 |
| 1992 |
Computer lab - $35,365 |
| 1994 |
Control work - $3,500 |
| 2003 |
Interior/Exterior Painting - $8,300 |
| 2003 |
Landscape Foundation at Southwest Side - $6,200 |
| 2004 |
Basement - repaint floor, resurface work areas, new cabinets - $3,809 |
| 2006 |
Stair repair - $311,192 |
| Class of '37 House |
1986 |
Remodel - $104,000 |
| 1986 |
Daycare Center - $50,710
Architect: John C. Holden, B.S., M.E., PE |
| 1990 |
Daycare renovation - $33,140 |
| 1991 |
Class '37/Doughty sewer repair - $5,102 |
| 1994 |
Kitchen - $9,582 |
| 1996 |
Replace sewer line - $2,630 |
| 1997-99 |
Renovation and Refurbishment - $395,187
Capital funds 1998 - $100,000
Donor Funding 1998 - $150,000
Additional Funding 1999 - $90,000
Architect: Dignard Architectural Services |
| 2002 |
Renovation - $4,311 |
| Class of '62 Center for Theatre and Dance - 2005 |
2005 |
Total Project Cost: $52,194,310 |
| 1998 |
Herbert Allen donation - $20,000,000 |
| 1998-99 |
Theatre Design Consultant: Robert Davis, Inc. |
| 1999 |
Site Analysis: Sasaki Associates |
| 1999 |
Architect: William Rawn Associates |
| 1999 |
General Contractor: Barr & Barr |
| 2001 |
American Legion - $791,205
Architect: Hill Architects
General Contractor: Waldron |
| 2001 |
Design and engineering fees - $2,000,000 |
| 2002 |
Site work and construction - $46,400,000 |
| 2003 |
High voltage distribution system expansion - $350,000
General Contractor: Barr & Barr |
| 2004 |
Construction Budget Increase - $1,500,000 |
| Cole Field |
1960-64 |
Extension of Cole Athletic Field |
| 1969 |
Electric scoreboard |
| 1973 |
Women's field hockey field |
| 1984 |
Cole Field grading - $10,378 |
| 1985 |
North of tennis courts: rebuild field - $45,000 |
| 1986 |
Playing fields: replace lighting - $20,050 |
| 1986 |
Athletic field - $66,470 |
| 1993 |
Scoreboard - $5,455 |
| 1998 |
Softball backstop - $5,930 |
| 1999 |
Women's field hockey field: regrade sod - $33,883 |
| 2000 |
Women's Soccer field permanent scoreboard - $10,389 |
| 2000 |
Women's Soccer Field renovation - $26,400 |
| 2000 |
Women's softball field - $14,925 |
| 2003 |
Build scoring table covering (3) - $3,416 |
| 2003 |
Build portable shelter for crew boats - $10,500 |
| 2004 |
Install quick connect - $25,000 |
| 2004 |
Lower Cole irrigation - $62,000 |
| 2004 |
New Bobby Coombs Baseball Field
Design and Construction - $510,814 |
| 2005 |
Magnum water cannon - $9,121 |
| 2005 |
Men's soccer field drainage and sodding - $245,598
Architect/General Contractor: Clark Co. |
| 2005 |
Stetson Road reconstruction - $240,000
Engineer: Guntlow |
| 2006 |
Softball field renovation - $101,294 |
| 2006 |
Replace softball outfield fence - $4,009 |
| Cole Field House - 1926 |
1926 |
Built
Architect: Densmore, Leclare and Robbins |
| 1973 |
2nd floor |
| 1976 |
Washing machines - $2,361 |
| 1986 |
Renovation - new chimney liner - $105,000
Architect: David J. Westall, R.A. |
| 1994 |
Sewer - $13,692 |
| 1994 |
Showers - $8,779 |
| 1994 |
Storage - $70,859 |
| 1995 |
Sewer line - $22,514 |
| 1995 |
Rest rooms - $3,284 |
| 1997 |
Remove B&G equipment from storage building and return to athletic space 1993 - $70,000
Design and Construction - $1,727,923
Additional Funding - $247,000
Architect: Baron & Hammer |
| 1998-99 |
Bathroom facilities - $87,539
Architect: Christopher Williams |
| 2003 |
Interior Exterior Painting - $11,800 |
| 2008 |
Drainage - $50,000 |
| 2008 |
Ventilation upgrade - $45,000 |
| College Garage/Art Studio - 1902 |
1902 |
Built |
| 1975 |
Art sculpture in Art Studio - $35,000 |
| 1980 |
Art facilities project - $100,000 |
| 1984 |
Art Studio roof - $58,300 |
| 1985 |
Faculty Art Studio - $333,000
Architect: Burr & McCallum |
| 1990 |
Art Studio spray booth - $1,710 |
| 1996 |
Sculpture Studio-replace leaking transformer - $8,525 |
| 1998 |
South studio - $84,500 |
| 2004 |
Art studio drainage - $3,304 |
| 2004 |
Sidewalk waterproofing - $29,173 |
| 2005 |
Metal art studio - $3,675 |
Currier Hall - 1908
(Lura Ormsbee Currier) |
1908 |
Built
Architect: Robins & Oakman '99 |
| 1954-57 |
Restoration and Music Department - $35,000
Designed by: Peter P. Welanetz, PE |
| 1964 |
Renovation - $180,000
Architect: The Architects Collaborative |
| 1965-66 |
Repainting exterior |
| 1973 |
Doors and toilets |
| 1979 |
Conversion to student housing - $30,000 |
| 1979 |
Currier/Fitch window repairs - $13,000 |
| 1982 |
Retaining wall - $6,000 |
| 1987 |
Carlisle fully adhered rubber roof - $29,000 |
| 1989-90 |
Railing - $12,050 |
| 1993 |
Increase main service from 200 amp to 400 amp - $50,000 |
| 1993 |
Renovation and refurbishment - $685,082 |
| 1993 |
Currier/Fitch steam line - $32,205 |
| 1996 |
Data wiring - $8,000 |
| 1998 |
Roof parapet - $24,780 |
| 2003 |
Interior/Exterior Painting - $13,015 |
| 2004 |
Sewer - $3,196 |
| 2005 |
Heat control - $1,746 |
| 2005 |
Sprinkler system design - Currier, Poker Flats - $30,057 |
| 2006 |
Heating system replacement - $75,113 |
| 2006 |
Residence halls sprinklers - Currier/Poker Flats - $372,666
Engineer: Fire Protection Services
General Contractor: Renau |
| Danforth Block |
1992 |
Renovate and upgrade eight apartments - $815,798 |
| 2006-07 |
Air quality testing |
| 2007 |
Fire escape - $90,869 |
| Denison Gate House - 1898 |
1984 |
Deleading - $4,830 |
| 1988 |
Administrative offices |
| 1997 |
Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000 |
| Dewey House - 1900 |
1974 |
Conversion to student housing |
| 1977 |
Central College library |
| 1979 |
Furnishings - $3,500 |
| 1982 |
Exhaust fans - $6,300 |
| 1982 |
Radiator traps - $7,500 |
| 1989 |
Bookstore restoration - $182,000 |
| 1995 |
Sold |
| Dining Services |
2002 |
Support facility (project cancelled)
Design and permitting - $89,687
Architect/Contractor: Breadloaf |
| 2004 |
Hood compliance upgrades - $21,870 |
| Dodd Annex |
1972 |
Restoration: Williams Inn Annex #3 - $39,000
Designed by: Peter P. Welanetz, PE |
| 1984 |
Rewire - $5,500 |
| 1984 |
Dodd complex: central electric conversion - $53,000 |
| 2005 |
Interior/exterior painting - $3,216 |
Cyrus M. Dodd House - formerly Treadway Williams Inn - 1900
(Cyrus Morris Dodd 1855) |
1956 |
Purchased |
| 1960-61 |
Major restoration |
| 1974 |
Conversion to student housing - $116,000 |
| 1974 |
Landscaping - $4,000 |
| 1979 |
Storm windows - $15,000 |
| 1980 |
Renovation - $28,600 |
| 1982 |
Bathroom fans - $5,700 |
| 1984 |
Dodd complex: central electric conversion - $53,000 |
| 1984 |
Aluminum siding - $33,500 |
| 1984 |
Exhaust fan - $6,300 |
| 1984 |
Radiator traps - $7,500 |
| 1984 |
Electrical distribution - $12,000 |
| 1985 |
Electrical conversion: central system - $318,000 |
| 1985 |
Rewiring - $175,000 |
| 1985 |
Door lock replacement - $17,650 |
| 1990 |
Bathrooms - $6,810 |
| 1990 |
Fire line - $115,635 |
| 1993 |
Renovation and refurbishment - $886,702 |
| 1998 |
Power outage: cable replacement - $15,500 |
| 1999-00 |
Dining refurbishment and purchase new tables and chairs - $100,172
Architect: Christopher Williams |
| 2001 |
Dodd Dining Renovation - $1,045,705
Architect: CenterLine
General Contractor: Cutler |
| 2004 |
Exit stairs - $61,089 |
| 2004 |
Dodd dishroom reconfiguration - $47,231 |
| 2007 |
Dining A/C installation - $57,251 |
Doughty House - 1908
(William H. Doughty Jr. 1898) |
1968 |
Purchased |
| 1975 |
Sprinkler system - $12,000 |
| 1979 |
Fire escapes - $15,000 |
| 1991 |
Doughty/Class '37 sewer repair - $5,102 |
| 1998 |
Renovation and refurbishment - $362,973 |
| 2003 |
Interior/Exterior Painting - $9,800 |
| 2006 |
Road repairs - $66,018 |
Driscoll Dining Hall - 1963
(Alfred E. Driscoll '25) |
1963 |
Berkshire Quad dining/lounge - $385,000
Architect: Shepley, Bulfinch, Richardson & Abbott |
| 1984 |
New heating coil installed - $6,000 |
| 1984 |
Roof - $14,000 |
| 1991 |
Driscoll/Berkshire patio - $43,289 |
| 1996 |
Upgrade of kitchen and serving facilities (Driscoll, Faculty House, Greylock) - $134,000 |
| 2002 |
Electrical projects-switch gear - $7,509 |
| 2004 |
Hood Compliance Upgrade - $21,870 |
| 2004 |
Roof replacement - $36,000 |
| 2004 |
Replace lighting - $14,000 |
| 2005 |
Driscoll Dining Renovation Schematic - $43,433 |
Droppers House - 1933
(Garrett Droppers) |
1987 |
Administrative offices |
| 1989 |
Personnel office |
| 1997 |
Addition/renovation - $52,071
Architect: Christopher Williams |
| 2004 |
Human Resources moved to B&L (7/04) |
| 2004 |
Dining Services offices moved to Droppers (8/04) |
| 2005 |
Replace existing electrical service - $1,873 |
| East College - 1842 |
1842 |
The original building of 1798 burned in 1841; in 1907 larger doorways added
Designed by: J.S. Oakman '99 |
| 1956 |
Rebuilt - $267,000
Architect: Cram and Ferguson |
| 1982 |
Major renovation - $41,690 |
| 1984 |
Roof - $12,100 |
| 1988 |
Asbestos removal - $10,670 |
| 1988 |
Asbestos removal - $24,000 |
| 1991 |
Renovation - $330,412 |
| 1999 |
East/Fayerweather - single sex bathrooms - $532,462
Architect: H.P. Rovinelli Architects |
| 2003 |
East/Fayerweather - sprinkler system - $223,040 |
| Eph's Monument and Gravesite Restoration - 2005 |
2005 |
Monument and Gravesite Restoration - $323,487
Architect: Elmore Design
General Contractor: E.T. O'Connor |
| Faculty House/Alumni Center - 1938 |
1938 |
Built - $150,000
Architect: T.H. Ellett (New York) |
| 1976 |
New dining room - $3,850 |
| 1982 |
Egress and lighting - $34,050 |
| 1982 |
Bowling machines - $7,000 |
| 1983 |
Addition - $1,245,000
Architect: Cambridge Seven Associates, Inc. |
| 1985 |
Lighting - $16,740 |
| 1986 |
Landscaping - $10,360 |
| 1986 |
Roof - $12,130 |
| 1995-96 |
Upgrade of kitchen and serving facilities (Driscoll, Faculty House, Greylock) - $134,000 |
| 1996 |
Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College) - $20,868 |
| 1997 |
Roofing repair (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000 |
| 1999 |
Bowling Alley - $20,000 |
| 2004 |
Roof parapet wall - $13,600 |
| 2004 |
Patio wall and rail - $20,300 |
| 2004 |
Steam line - $19,355 |
| 2005 |
Chilled Water to Faculty House - $51,460 |
| 2006 |
Renovation design - $240,000 - project deferred
Architect: Truex
General Contractor: Barr & Barr |
| 2008 |
Furniture/code issues - $450,000 |
Fayerweather Hall - formerly South College - 1842
(Daniel F. Fayerweather) |
1842 |
Built
Architect: Allen & Collins |
| 1905 |
Gold Coast addition to south; building named Fayerweather
Architect: Allen & Collins |
| 1957 |
Rebuilt - $325,000
Architect: Cram and Ferguson |
| 1982 |
Major renovation - $41,900 |
| 1988-89 |
Renovation - $400,000 |
| 1999 |
East/Fayerweather single sex bathrooms - $532,462
Architect: H.P.Rovinelli Architects |
| 2003 |
East/Fayerweather - sprinkler system - $223,040 |
Fernald House - 1880
(Orlando Marcellus Fernald) |
1968 |
Addition - $6,200
Designed by: Ralph W. Iacuessa |
| 1973 |
Sprinkler system - $9,000 |
| 1979 |
Renovation - $15,000 |
| 1982 |
Office renovations and stairwell - $6,500 |
| 1984 |
Renovation - $2,600 |
| 1988 |
Asbestos removal - $21,200 |
| 1999 |
Address code issues - $209,665 |
| 2006 |
Demolished 9/12/06 (Stetson/Sawyer Project) |
Fitch House - formerly Berkshire Hall - 1905
(Ebenezer Fitch) |
1905 |
Built
Architect: Francis R. Allen (Allen & Collens) |
| 1963 |
Renovation; renamed Fitch - $180,000
Architect: The Architects Collaborative |
| 1979 |
Fitch/Prospect steam line - $16,000 |
| 1979 |
Fitch/Currier window repairs - $13,000 |
| 1979 |
Fitch/Mission steam line replacement - $29,500 |
| 1987 |
Carlisle rubber roof - $24,000 |
| 1993 |
Replace old main high voltage feeder - $40,000 |
| 1993 |
Fitch/Currier steam line - $32,205 |
| 1994 |
Renovation and refurbishment - $944,270 |
| 1999 |
Prospect/Fitch metal railing - $5,200 |
| 2004 |
Fitch/Lehman Sprinkler System - $311,119 |
| 2005 |
Interior/exterior painting - $9,000 |
| 2006 |
Masonry repair - $147,817 |
| 2007 |
Cornice Repair - $1,169,000
Architect: MCWB/Ryan-Biggs
General Contractor: Allegrone |
| Fort Hoosac - formerly Taconic House - Phi Sigma Kappa -1931 |
1931 |
Built
Architect: Grosvenor S. Wright |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Tyler, Wood) - $16,000
Engineer: Automatic Sprinkler Corp. |
| 1979 |
Insulation (Agard, Fort Hoosac) - $7,500 |
| 1982 |
Handicapped toilet - $12,000 |
| 1984 |
Window replacement - $24,420 |
| 1994 |
Roof pocket - $10,600 |
| 1995 |
Door/hardware - $16,000 |
| 1999 |
Upgrade systems 1997 - $167,222
Architect: Bob Holdridge |
| 2006 |
Replace electrical system - $39,710 |
| 2006 |
Replace heating units - $54,356 |
| 2006 |
Install solar panels for hot water - $18,000 |
| Freshman Quadrangle |
1954 |
Baxter Hall/Freshman Quad landscaping - $60,000
Architect: Olmsted Associates |
| 1984 |
Freshman Quad landscaping - $87,000 |
| James A. Garfield House - Delta Upsilon
(Henry Augustus Garfield 1885) |
1924 |
Purchased |
| 1968 |
Sprinkler system - $14,600
Engineer: M & W Heating, Inc. |
| 1978 |
Renovation - $501,000
Architect: Gary Lindstrom and Associates |
| 1978 |
Survey - $6,500 |
| 1978 |
Garfield/St. Anthony new steam line - $47,300 |
| 1994 |
Fire alarm - $9,741 |
| 1996 |
Stand-by pumps/perimeter radiation (Garfield, Tyler Annex) - $2,831 |
| 2000 |
Upgrade systems - $313,515
Architect: Thomas Bartels |
| 1999-00 |
Repair/replace windows - $500,000 |
| 2006 |
Renovation design - $200,000 |
Gladden House (Greylock Quad) - 1965
(Washington Gladden) |
1965 |
Residential houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative |
| 1982 |
Steam line - $15,518 |
| 1985 |
Roof (Bryant, Carter, Mark Hopkins, Gladden, Greylock Dining) - $73,310 |
| 2001 |
Greylock Housing Renovation (Carter/Gladden)- $3,268,596
Architect: Black River Design
Contractor: MLB |
Goodrich Hall - 1859
(John Zaccheus Goodrich) |
1859 |
Chapel and Alumni Hall: shift to stone (local dolomite) and to Gothic
Architect: Gervase Wheeler |
| 1905 |
Remodeled and named Goodrich |
| 1962 |
Alterations - $10,000
Designed by: Peter P. Welanetz, PE |
| 1975 |
Major renovation - $5,400 |
| 1976 |
Goodrich/Lawrence steam line - $9,000 |
| 1976 |
Lighting - $1,000 |
| 1979 |
Silk screen ventilation - $14,300 |
| 1984 |
Leaded windows - $6,000 |
| 1989-90 |
Roof - $36,600 |
| 1996 |
Parking/fire access (Lawrence/Goodrich) - $38,022 |
| 1999 |
Renovate for Student Acitivities Center - $2,430,251
Additional funds - $303,000
Architect: Bruner/Cott |
| 1998 |
Restoration/installation of tenney window - $12,150
Cummings Studio |
| 2004 |
Replace/upgrade sound system - $34,685 |
| 2004 |
Student Activities office moved to 2nd floor (7/04) |
| 2005 |
Refinish Great Hall floor - $1,050 |
| 2006 |
Sprinkler system installation - $208,465 |
| 2008 |
Dance modifications - $50,000 |
| 2008 |
Structural repair - the Great Hall - $400,000 |
Goodrich House - 1915
(Frank Goodrich) |
1968 |
Purchased |
| 1995-96 |
Refurbishment and upgrades - $141,168
Refurbish student living space and upgrade systems
Architect: Christopher Williams |
| Grace Hall - renamed Chapin Hall (Grace Chapin) |
| Greylock Dining Hall (Greylock Quad) - 1965 |
1965 |
Residential houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining ) - $2,700,000
Architect: The Architects Collaborative |
| 1982 |
Roof - $27,500 |
| 1982 |
Enclosure |
| 1982 |
Greylock economizer - $54,520 |
| 1984 |
Classrooms, lighting and drapes - $12,000 |
| 1985 |
Classrooms - $7,600 |
| 1987 |
Carlisle ballasted roof - $10,000 |
| 1988 |
Classrooms carpet, tables and chairs - $30,000 |
| 1990-91 |
Floor - $19,825 |
| 1994 |
Emergency exit signs - $5,943 |
| 1994 |
High voltage - $10,836 |
| 1994 |
Heat coil - $3,590 |
| 1994 |
HV - $5,148 |
| 1995-96 |
Upgrade of kitchen and serving facilities (Driscoll, Faculty House, Greylock) - $134,000 |
| 2003 |
Interior/Exterior Painting - $6,850 |
| 2005 |
Plumbing repairs - $7,491 |
| 2005 |
Replace AHU and duct repair - $2,000 |
| 2005 |
Roof replacement - $29,093 |
| 2006 |
Greylock Dining and classroom A/C design - $40,000 |
| 2008 |
Makup AHU replacement - $50,000 |
| Greylock Quadrangle - Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining - 1965 |
1964-65 |
Landscaping - $145,000
Architect: Carol R. Johnson & Associates, Inc. |
| 1965 |
Residential houses built - $2,700,000
Architect: The Architects Collaborative |
| 1978 |
Toilet repair - $7,500 |
| 1992 |
Sidewalk/parking lot improvements - $493,266 |
| 1996 |
Greylock Housing Renovation Phase I - $244,000
Code deficiencies and network cabling |
| 2000 |
Greylock Housing Renovation (Bryant/Mark Hopkins) - $2,500,000
Architect: Black River Design
Contractor: MLB |
| 2001 |
Greylock Housing Renovation (Carter/Gladden) - $3,268,596
Architect: Black River Design
Contractor: MLB |
| 2003 |
Greylock vault oil switch replacement - $120,000 |
| 2005 |
Transformer replacement - $42,463 |
| 2006 |
Residence hall emergency lighting replacement - Greylock Quad - $80,000 |
Griffin Hall - 1828
(Edward Dorr Griffin) |
1828 |
Originally had double entrance and stood near Main Street. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built); library built 1847; and lecture room, moved to northeast in 1904 and remodeled. The building was originally called "the brick chapel," and was named Griffin Hall in 1859.
Architect: Harding and Seaver |
| 1952 |
Restored - $29,000
Designed by: Peter P. Welanetz, PE |
| 1972 |
Ladies room |
| 1982 |
Room 2 and 7: carpet and seating - $11,500 |
| 1988 |
Asbestos removal in basement only - $35,120 |
| 1988 |
Cupola restored |
| 1989-90 |
Paint room 3 - $12,725 |
| 1995-97 |
Phases I & II Renovation
Design - $600,000
Construction - $1,750,000
Construction - $400,000
Architect: Childs Bertman Tseckares |
| 1997 |
Steam line - Thompson Chapel/Griffin - $295,559 |
| 2000 |
Griffin/AMT crosswalk lighting - $25,717 |
| 2006 |
Sidewalks repairs - Griffin/Chapel - $128,501 |
| Grundy's Garage |
1987 |
Basement: 2 faculty art studios |
| 1988 |
Purchased - $445,000 |
| 1988-89 |
Bookstore - $165,945 |
| 1990-91 |
1914 Library - $33,840
Move 1914 Library to rear of bookstore; install wiring, lighting, heating, entrance ramps, and interior partitions.
Architect: David J. Westall, R.A. and Cheryl Meyers |
| 2002 |
Art studio bathroom renovation - $9,808 |
| 2002 |
Insulate and wallboard - $2,634 |
| 2004 |
Interior/exterior painting - $8,600 |
Hardy House - 1946
(James G. Hardy) |
1982 |
Renovation - $23,500 |
| 1992 |
Renovation and refurbishment to create a meeting room; upgrade furnishings - $49,997 |
| 2003 |
Interior/Exterior Painting - $8,760 |
| 2006 |
Fire escape - $54,917 |
| Heating Plant - 1934 |
1934 |
Built
Architect: Cram and Ferguson |
| 1953 |
Addition - $300,000
Architect: Lockwood Greene Co. |
| 1965 |
Alteration and remodeling - $478,000
Designed by: Winthrop M. Wassenar, PE and A.B. Stanley |
| 1965 |
Replace 60,000 lb. boiler |
| 1970 |
Addition and alteration (oil storage facility) - $615,000
Engineer/Architect: Lockwood Greene Co. |
| 1976 |
Heating Plant/Gym main steam line - $2,000 |
| 1976 |
Heating Plant/Lasell steam line - $4,500 |
| 1976 |
Oil Storage tank - $13,500 |
| 1979 |
Stack repairs - $16,000 |
| 1979 |
Electrical line replacement - $25,000 |
| 1980 |
Heating Plant survey - $47,000 |
| 1984 |
Economizer - $127,700
Engineer: Pope Engineers |
| 1984 |
Chimney - $17,140 |
| 1987-89 |
Co-generation - $340,900
Architect: van Zelm, Heywood and Shadford |
| 1993 |
Stack - $32,500 |
| 1994 |
Study - $13,960 |
| 1996 |
Install gas line and connection to boilers - $107,000 |
| 1997-01 |
Heating Plant upgrade - $969,859
Study 1996 - $100,000
Replace/Upgrade boiler and peripheral equipment - $275,000
Replace failed roof tubes in Boiler #2 - $55,000
Design - $138,000 |
| 2002 |
Boiler 3 replacement - $3,300,000
Architect: Childs Bertman Tseckares
General Contractor: Pizzagalli |
| 2002 |
Electrical cogeneration - $2,700,000
Architect: Childs Bertman Tseckares
General Contractor: Pizzagalli |
| 2003 |
Auxiliary system - $693,889 |
| 2003 |
High voltage distribution system expansion - $349,974
Electrical systems repairs - $775,000
Engineering Consultant: VanZelm, Heywood and Shadford
General Contractor: Pizzagalli |
| 2004 |
Chimney repair - $3,850 |
| 2004 |
Insulation - $2,900 |
| 2004 |
Metasys Interface for Turbine Generator - $22,500 |
| 2004 |
Oil tank repair - $455,000 |
| 2004 |
Platform - $39,781 |
| 2004 |
Repair oil piping - $3,573 |
| 2004 |
Repipe DA tank - $18,043 |
| 2004 |
Steam distribution system - $50,000 |
| 2004 |
Oil (#6) Tank Work - $274,961 |
| 2004 |
High Voltage Distribution System Expansion - $349,974 |
| 2005 |
Boiler #3 access and cleanouts - $7,349 |
| 2005 |
Drainage redirection - $8,325 |
| 2005 |
Install check valve on DA tank - $2,500 |
| 2005 |
Install stairs to #6 oil tank - $32,360 |
| 2005 |
Interior/exterior painting - trim - $10,800 |
| 2005 |
Miscellaneous projects - $27,025 |
| 2005 |
Replace feeder F8 - $18,800 |
| 2005 |
Steam distribution system insulation - $2,900 |
| 2006 |
Miscellaneous projects - $81,126 |
| 2006 |
Redundant feed pump #3/decom #1 - $90,494 |
| 2007 |
Expansion joints - $45,438 |
| 2008 |
Miscellaneous projects - $35,000 |
Hopkins Memorial Forest/Rosenberg Center (Buxton Farms)
(Arthur E. and Ella M. Rosenberg) |
1906 |
Carriage House built |
| 1933 |
Land donated to College by wife of Amos Lawrence Hopkins |
| 1935-68 |
Land by USFS for research |
| 1968 |
Hopkins Forest returned to College |
| 1976 |
Develop section "A" - $13,200 |
| 1976 |
Develop section "C" - $1,100 |
| 1977 |
Carriage House renovated |
| 1979 |
Planning - $12,200 |
| 1979 |
Section "A" operations - $52,000 |
| 1991 |
Purchased Birch Brook Watershed Land 81.4 acres - $50,000 |
| 2005 |
Wire Bridge Farm Land Acquisition, 82 Acres - $200,265 |
| 2007 |
Move weather tower and weather shack |
Hopkins Hall - 1897
(Mark Hopkins) |
1897 |
Based on Romanesque style of H.H. Richardson; memorial to Mark Hopkins (d. 1887) - $87,000
Architect: Francis Allen & Kenway (Boston) |
| 1956 |
Restoration - $42,500
Designed by: Peter P. Welanetz, PE |
| 1962 |
Alterations - $15,000
Designed by: Peter P. Welanetz, PE |
| 1967 |
Hopkins Hall to Stetson Library: steam tunnel - $30,000
Engineer: Lockwood Greene Co. |
| 1971 |
Dean's office, 2nd and 3rd floor offices |
| 1972 |
Sprinkler system - $15,000
Engineer: M & W Heating, Inc. |
| 1972 |
Telephone switchboard |
| 1973 |
Classrooms |
| 1982 |
Basement offices - $6,470 |
| 1982 |
Business office alterations - $21,350 |
| 1984 |
Basement - $28,640 |
| 1984 |
Office renovation - $8,600 |
| 1984 |
Telephone room - $321 |
| 1986 |
Financial Aid Office - $8,810 |
| 1986 |
Office renovation - $8,500 |
| 1987 |
Total asbestos removal - $159,340 |
| 1987-89 |
Total renovation - floor and wall removal; new addition - $9,300,000
Architect: Architectural Resources Cambridge, Inc.
General Contractor: Barry Bette and Led Duke |
| 1990 |
4th floor classrooms - $5,890 |
| 1990 |
Interior accessories - $20,800 |
| 1991 |
Registrar's office - $3,764 |
| 1991 |
Hopkins Hall - $5,208 |
| 1993 |
Hopkins/Sawyer: air conditioning - $745,942 |
| 1994 |
Treasurer's office - $23,086 |
| 1994 |
Public relations' office - $11,768 |
| 1995 |
North entry - $24,943 |
| 1996 |
Air balance (Chandler, Hopkins, Chapin, BMC) - $4,021 |
| 1996 |
Registrar's office expansion - $10,038 |
| 1996 |
Financial Aid office - refurbish reception area - $1,201 |
| 1996 |
Install safety glass - $10,575 |
| 1997 |
Refurbish President's outer office - $15,049 |
| 1999 |
Accounts Payable new furniture - $8,000 |
| 1999 |
President's Office inner office - $4,000 |
| 2000 |
Data control workstations - $14,349 |
| 2001 |
Dean's office - $6,053 |
| 2001 |
Public Affairs office - $15,875 |
| 2001 |
Renovation Security office - $3,000 |
| 2002 |
President's office - copier/mail room - $10,100 |
| 2003 |
President's office - conference room |
| 2003 |
President's office - kitchen - $5,076 |
| 2003 |
Provost office - $9,710 |
| 2004 |
Generator - $26,000 |
| 2005 |
Lighting - $5,440 |
| 2006 |
Lighting replacement - $35,789 |
| 2006 |
Fire alarm replacement - $58,034 |
| 2006 |
Communications room uprades -$18,071 |
| 2006 |
Lighting replacement - $70,000 |
| 2006 |
Telephone room fire suppression - $15,579 |
| 2008 |
Sewer and sanitary line - Morgan/Hopkins - $60,000 |
Mark Hopkins House - 1965
(Mark Hopkins) |
1965 |
Residential Houses (Bryant, Carter, Gladden, Mark Hopkins, Greylock Dining) - $2,700,000
Architect: The Architects Collaborative |
| 1977 |
Roof replacement - $10,000 |
| 2000 |
Greylock Housing Renovation (Bryant/Mark Hopkins) - $2,500,000
Architect: Black River Design
Contractor: MLB |
| 2001 |
Mark Hopkins/Bryant exterior painting - $26,272 |
| 2004 |
Roof Replacement - $54,500 |
Susan Hopkins House - 1920
(Susan Sedgwick Hopkins) |
1969 |
Purchased |
| 1975 |
Sprinkler system - $11,100 |
| 1997 |
Refurbishment and upgrades - $160,094
Additional Funding - $67,000
Refurbish student living space and upgrade systems |
| 2006 |
Residence hall access - Matrix - Susie Hopkins and Tyler - $20,786 |
Hopkins Observatory - 1837
(Albert Hopkins) |
1837 |
Built by Professor Albert Hopkins and students near East College- $2,075 |
| 1850's |
Moved to the south end of Berkshire Quad |
| 1962 |
Observatory moved to the north end of Berkshire Quad- $50,000 |
| 1962 |
New planetarium in Observatory - $25,000
Designed by: Spitz Laboratories |
| 1974 |
Mehlin Memorial |
| 1983 |
Renovation - $16,000 |
| 1988 |
Rebuild Turret Room - $5,000 |
| 1997 |
Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000 |
| 2004 |
A/C Installation - $35,589 |
| 2005 |
New Projector - $366,824 |
Hubbell House - 1872
(Mary Hubbell) |
1974 |
Purchased |
| 1984 |
Rewire - $27,000 |
| 1991 |
Hubbell/Sewall front doors - $4,721 |
| 1996 |
Fire stair - $40,221 |
| 2001 |
Renovation - $276,543
Modify existing halls/stairwells and upgrade systems
Architect: David Westall
Contractor: Renau |
| 2004 |
Interior/exterior painting - $10,865 |
Jenness House - 1895
(Arthur Freeman Jenness) |
1966 |
Purchased |
| 1990 |
Multicultural Center - $27,300 |
| 1991 |
Furniture & renovations - $7,935 |
| 1991 |
MCC - $10,944 |
| 1996 |
Relocate from 30 Grace Court to 35 Grace Court - $125,000
Engineer: Vince Guntlow |
| 2000 |
MCC renovation - $29,900 |
Jesup Hall - 1899
(Morgan Ketchum Jesup) |
1899 |
Campus Center built
Architect: George Tilden |
| 1908 |
Remodeled by: J.S. Oakman '99 |
| 1959 |
Restoration - $20,000
Designed by: Peter P. Welanetz, PE |
| 1979 |
Install two west entrance vestibules - $3,500 |
| 1982 |
1914 book dispensary renovation - $5,690 |
| 1984 |
Conversion to Computer Center - $1,960,500
Architect: John Jordan, P.C. |
| 1990 |
Computer network equipment - $2,665,050 |
| 1990 |
Railing - $12,830 |
| 1990-91 |
Lobby floor - $13,272 |
| 1992 |
Room 205 - $9,402 |
| 1993 |
Room 112 - $19,953 |
| 1994 |
Cooling tower repair - $3,124 |
| 1994 |
Computer Center cable - $300,000 |
| 1995 |
Computer network - $450,000 |
| 1996 |
Computer network - $441,909 |
| 1997 |
Air conditioning - $28,895 |
| 1997 |
Jesup 24 hour room - $16,501 |
| 1999 |
Power backup system - $230,000 |
| 1999 |
Network rewiring - $390,000 |
| 2000 |
Cooling tower - $38,863 |
| 2000 |
Fire alarm - $48,000 |
| 2000 |
Network rewiring - $390,000 |
| 2001 |
Network rewiring - $385,000 |
| 2001 |
Card reader access - $3,000 |
| 2001 |
Rooms 313 & 314 wall - $1,234 |
| 2002 |
Office conversion -$26,000 |
| 2002 |
Replace Locknetics with card reader system - $7,500 |
| 2002 |
Secure storage area - $2,500 |
| 2002 |
Reorganize WSO space - $2,442 |
| 2002 |
Convert room to office space - $36,877 |
| 2002 |
Secure storage area - $2,500 |
| 2002 |
Network rewiring - $325,000 |
| 2003 |
UPS - $330,000 |
| 2003 |
Install Locknetics/Jesup and Stetson Media Labs - $2,054 |
| 2003 |
Install Locknetics/computer machine room - $918 |
| 2003 |
Network rewiring - $190,000 |
| 2003 |
UPS - $378,858 |
| 2004 |
Network Academic Building CAT 3 replacement - $121,000 |
| 2004 |
Network Chemistry and Biology Upgrades - $70,000 |
| 2004 |
Network dorm CAT 3 replacement - $42,000 |
| 2004 |
Network fiber loop upgrade - $140,000 |
| 2004 |
Network Mears CAT 5 replacement - $60,000 |
| 2004 |
Add lighting and dimmers to 205 and 207 - $539 |
| 2004 |
Jesup 5kv Feeder XLP Replacement - $14,500 |
| 2004 |
Jesup and Mears chemical storage upgrade - $8,439 |
| 2004 |
Jesup A/C and UPS design - $332,500 |
| 2005 |
Communications network upgrade - $370,000 |
| 2005 |
West foundation landscaping - $10,000 |
| 2006 |
Computer room fire suppression - $59,144 |
| 2006 |
Network communication upgrade - $365,000 |
| 2006 |
Wireless Implementation - $572,427 |
| 2006 |
Main computer room divider - $10,603 |
| 2006 |
Room 101 media lab lighitng modifications - $4,383 |
| 2007 |
Accessibility entrance design - $45,000 |
| 2007 |
Network communication upgrade - $420,000 |
| 2008 |
Accessibility entrance construction - $350,000 |
| 2008 |
Chiller and FCU replacement - $50,000 |
| 2008 |
Network communication upgrade - $548,500 |
| Jewish Religious Center - 1989-90 |
1989-90 |
Built - $1,457,450
Architect: Herbert S. Newman Associates, AIA, P.C.
General Contractor: GSS Construction |
| 1996 |
Replace chimneys - $4,294 |
| 1999 |
Card reader access - $11,000 |
| 2004 |
Interior/exterior painting - $6,400 |
| 2005 |
Sewer line replacement - $13,500 |
| Keck House - renamed Chadbourne House |
Kellogg House (CES) - 1920
(Ebenezer Kellogg) |
1978 |
Library |
| 1978 |
Conversion to Center for Environmental Studies (CES) - $41,000 |
| 1978 |
Extension of steam line - $6,000 |
| 1988 |
Fire alarm system - $3,800 |
| 1991 |
CES land - $50,000 |
| 1995 |
CES Matthew Cole Library - $350,729
Architect: Ann Beha Associates |
| 1996 |
Renovate existing library to offices - $24,746 |
| 1996 |
Reroof existing main building - $6,800 |
| 1997 |
Construct snow guard - $5,000 |
| 2002 |
CES office renovation - $1,976 |
| 2008 |
Kellogg relocation and renovation for Stetson/Sawyer Project |
Lambert House - c. 1900
(Anna Elizabeth Lambert) |
1969 |
Purchased |
| 1975 |
Sprinkler system - $10,500 |
| 1996 |
Emergency/exit light upgrade (Lambert/Milham) - $8,050 |
| 2000 |
Upgrade systems - $105,862 |
Lansing Chapman Rink - 1953
(William Lansing Chapman '10) |
1953 |
Hockey Rink and machinery building - $100,000
Architect: Mollenburg and Betz |
| 1954 |
Warm up shed: restoration |
| 1961 |
Warm up shed: restoration |
| 1962 |
Hockey Rink canopy - $176,500
Architect: Lockwood Greene Co. |
| 1969 |
Total enclosure and connecting building - $900,000
Engineer: Lockwood Greene Co. |
| 1970 |
Landscaping and parking lot |
| 1973 |
Sound system - $13,000 |
| 1974 |
New dasher boards - $23,000 |
| 1979 |
Machinery repairs - $7,500 |
| 1981 |
Hockey Rink roof |
| 1984 |
Hockey Rink drape - $12,000 |
| 1985 |
Hockey Rink lights - $12,690 |
| 1985-86 |
Rebuild Zamboni - $5,000 |
| 1986 |
Chiller - $27,030 |
| 1988 |
New roof insulation - $230,000 |
| 1989 |
Roof - $240,090 |
| 1991 |
Hockey Rink oil recovery - $6,383 |
| 1992 |
Repairs - $72,955 |
| 1992 |
Roof repair - $38,895 |
| 1993 |
Hockey Rink/The Log steam line - $18,277 |
| 1993 |
Zamboni - $14,336 |
| 1993 |
Locker room floor - $14,480 |
| 1995 |
Locker room - $156,000 |
| 1995 |
Replace pumps - $11,000 |
| 2000 |
Women's hockey bench storage units - $2,195 |
| 2001 |
Hockey Rink dasher boards - $167,938 |
| 2003 |
Hockey Rink Renovation - $922,021
Engineer: RFS
General Contractor: American Refrigeration |
| 2004 |
Gate Installation - $9,990 |
| 2004 |
Roof replacement - $48,237 |
| 2005 |
Locker rooms/rest rooms flooring - $35,000 |
| 2005 |
Refinish bleachers - $6,570 |
| 2008 |
Ice rink - install oxidizers - $25,000 |
Lasell Gymnasium - 1886
(Edward Lasell '28 and Josiah Lasell '84) |
1886 |
Built
Architect: J.C. Cady & Co. (NYC) |
| 1928 |
South extension of gymnasium
Architect: Densmore, Leclare and Robbins (Boston) |
| 1965 |
Swimming pool improvements |
| 1965 |
Locker room improvements |
| 1968 |
New electrical substation - $18,000
Engineer: Lockwood Greene Co. |
| 1970 |
Women's athletic facility - $125,000
Architect: Lockwood Greene Co. |
| 1973 |
Temperature controls - $12,000 |
| 1973 |
Freshman court resurfaced - Tartan |
| 1973 |
Trainer's room, offices |
| 1975 |
Women's lockers - $15,000 |
| 1978 |
Pool-new backwash valve and repair piping - $4,000 |
| 1979 |
Electrical distribution - $20,000 |
| 1979 |
Clock tower roof repair - $12,500 |
| 1980 |
Two north entry vestibules - $4,000 |
| 1980 |
Security locks - $2,500 |
| 1980 |
Bryant/Lasell roof repairs - $22,500 |
| 1982 |
Foldback bleachers - $11,170 |
| 1984 |
Sidewalk - $16,710 |
| 1988 |
Major renovation - $3,000,000
Architect: Cambridge Seven Associates |
| 1990-91 |
Dance Studio New Lighting System- $50,000 |
| 1991 |
Compressor - $3,800 |
| 1991 |
Lasell/Chandler signage - $7,800 |
| 1994 |
Valve - $1,975 |
| 1994 |
Gutters - $34,960 |
| 1995 |
Lighting - $3,000 |
| 1997 |
Replace old gutters with new - $13,000 |
| 1999 |
Electrical service upgrade - $47,500 |
| 1999 |
Office renovation - Gary Guerin/Dave Barnard - $9,000
('99 R&M Athletic Projects) |
| 2000 |
Crew tanks - $5,925 |
| 2000 |
Gym clock - $60,807 |
| 2003 |
Interior/Exterior Painting - $11,240 |
| 2006 |
Install manual walk-drawn divider curtain - $5,000 |
| 2007 |
Fitness Center Rehabilitation - $382,000 |
| 2008 |
Basketball court lighting upgrade - $40,000 |
| 2008 |
Fitness Center Expansion - 3rd floor (formerly the Dance Studio) - $520,000 |
Lawrence Hall - 1846
(Amos Lawrence) |
1846 |
Octagonal library built - $7,000
Architect: Thomas Tefft (Providence) |
| 1890 |
East and west wings |
| 1915 |
Addition at rear |
| 1926 |
Addition at rear |
| 1926 |
Art Museum |
| 1938 |
Addition at rear |
| 1957-58 |
Restoration - $37,000
Designed by: Peter P. Welanetz, PE |
| 1969 |
Photo lab |
| 1976 |
Goodrich Hall/Lawrence steam line - $9,000 |
| 1977 |
Security system - $5,300 |
| 1979 |
Security system - $3,000 |
| 1982 |
Classrooms - $30,000 |
| 1982 |
Photo lab renovation - $23,300 |
| 1982 |
Roof repairs - $32,500 |
| 1983 |
Museum of Art - Phase I - $4,980,000
Architect: Moore, Grover & Harper |
| 1984 |
Classrooms - $30,000 |
| 1986 |
Museum of Art - Phase II - $2,571,500
Architect: Centerbrook Architects, Inc. |
| 1991 |
AC compressor - $3,713 |
| 1991 |
WCMA - $3,400 |
| 1992 |
Art Department office - $7,130 |
| 1992 |
Roof - $15,000 |
| 1992 |
Art slide library - $4,177 |
| 1994 |
WCMA dock/spray booth - $3,033 |
| 1994 |
Art museum security upgrade - $24,842 |
| 1996 |
Parking/fire access(Goodrich Hall/Lawrence) - $38,022 |
| 1997 |
Lawrence Hall classroom upgrade - $151,776
Architect: Bob Holdridge |
| 2001 |
Central security - $50,000 |
| 2001 |
Slide library renovation - $3,203 |
| 2002 |
WCMA utilities - $154,416 |
| 2004 |
Upgrade restrooms - $77,083
Architect: Centerline
General Contractor: Renau |
| 2005 |
Rose Gallery Renovation - $210,190
Architect: Centerline
General Contractor: Renau |
| 2005 |
Interior/exterior painting - exterior trim - $3,880 |
| 2006 |
Gallery HVAC renovation study - $50,000 |
| 2006 |
Fire alarm replacement/upgrade - $52,409 |
| 2008 |
WCMA master planning - $100,000 |
| 2008 |
Replace wheelchair lift - $16,000 |
| 2008 |
Roof replacement - $72,000 |
Lehman Hall - 1928
(Herbert Lehman '99) |
1928 |
Built
Architect: Cram and Ferguson |
| 1972 |
Toilets and heating |
| 1976 |
Rooms in basement - $20,000 |
| 1988 |
Renovation - wiring, carpet, paint, computer, phone, fire alarm, radiation - $12,840 |
| 1988 |
Rewiring and upgrades - $397,724 |
| 1998 |
Egress - $80,000 |
| 2004 |
Interior/exterior painting - $7,000 |
| 2004 |
Fitch/Lehman Sprinkler System - $311,119 |
| 2007 |
Exterior stair rebuild - $150,000 |
Mather House - 1840
(Benjamin F. Mather) |
1956 |
Restored - $37,000
Architects: William Gass and Peter P. Welanetz, PE |
| 1971 |
Converted to Admission Office |
| 1976 |
Addition - $20,000 |
| 1984 |
Renovation Admissions Office - $114,500
Architect: David J. Westall, R.A. |
| 1995 |
Refurbishment - $22,239 |
| 1996 |
Air conditioning - $25,000 |
| 2002 |
Relocation to Stetson Court and renovations - $497,187
Remove shed-roofed addition, site work, install new heating system
Architect: Thomas Bartels
General Contractor: Renau |
Mears House - Theta Delta Chi - 1925
(Brainerd Mears) |
1925 |
Built
Architect: Cram and Ferguson (Ralph Adams) |
| 1968 |
Photo lab |
| 1984 |
Alumni and Development Offices - $477,300
Architect: John Jordan, P.A. |
| 1984 |
Offices - $18,470 |
| 1984 |
Roof - $66,890 |
| 1986 |
Office alteration - $3,900 |
| 1986 |
Alteration - $60,690 |
| 1987 |
Asbestos removal complete - $23,590 |
| 1988 |
Enclosed porch and install new power file - $60,000 |
| 1994 |
Sewer - $2,083 |
| 1997-98 |
Renovation/AC - $220,339 |
| 2000 |
Conference room conversion - $14,793 |
| 2003 |
Research office - $19,509 |
| 2003 |
Landscape East Foundation - $14,859 |
| 2004 |
Interior/exterior painting - $6,032 |
| 2004 |
Network CAT 5 replacement - $71,654 |
| 2004 |
Water/Sewer Lines - $23,500 |
| 2005 |
Darkroom conversion - $7,356 |
| 2005 |
Interior/exterior painting - $10,000 |
| 2006 |
TDX room upgrade - $4,256 |
| Mears West - formerly Sears House |
1986 |
Purchased |
| 1987 |
Renovation - $26,350 |
| 1987 |
Renovated for Alumni Office expansion - $556,400
Architect: John Jordan, P.A. |
| 1989-90 |
Drainage - $3,505 |
Milham House
(Willis I. Milham 1894) |
1977 |
Conversion to Graduate Art housing - $12,000 |
| 1977 |
Fire alarm, smoke and heat detector, emergency lights - $14,000 |
| 1996 |
Emergency/exit light upgrade (Lambert/Milham) - $8,050 |
| 2000 |
Upgrade systems - $244,611 |
| 2005 |
Water/sewer lines - drainage redirection - $4,832 |
| Miller House |
1993-94 |
Purchased - $375,431 |
| 2004 |
Interior/exterior painting - $13,500 |
Mission Park - 1971
(Samuel John Mills 1809)
(Samuel Chapman Armstrong 1862)
(James Bissett Pratt 1898)
(Tyler Dennett 1904) |
1971 |
Residential houses - $5,415,000
Architect: Mitchell-Giurgola Associates |
| 1972 |
Landscaping and planting - $14,000
Architect: Carol R. Johnson Associates, Inc. |
| 1979 |
Mission Park/Fitch steam line - $29,500 |
| 1979 |
Dining hall carpet - $7,900 |
| 1979 |
Renovation - $22,500 |
| 1979 |
Roof repair - $10,000 |
| 1980 |
PA system - $8,000 |
| 1980 |
Special alterations - $22,500 |
| 1984 |
Energy management - $35,000 |
| 1984 |
Roof - $23,470 |
| 1984 |
Armstrong Recreation Room floor - quarry tile - $4,900 |
| 1986 |
Exterior panels: caulk, precast concrete - $10,000 |
| 1990-91 |
Renovations - Phases I, II and III - $2,885,000 |
| 1991 |
Reheat coils - $82,835 |
| 1992 |
Dining walkway - $4,796 |
| 1992 |
Parking lot - $19,437 |
| 1993 |
Dining enclosure - $18,714 |
| 1993 |
Air handler - $7,330 |
| 1993 |
Roof - $117,202 |
| 1996 |
Transformer replacement - $38,604
($38,572 insurance settlement) |
| 1997 |
Fire alarm upgrade - $31,250 |
| 1999 |
Exterior caulking - $178,314 |
| 2002 |
Furniture - $407,067 |
| 2002-03 |
Mission Park Renovation Phase I
Dining Hall Renovation - $3,061,876
Architect: CenterLine
General Contractor : Breadloaf |
| 2004 |
Mission Park Renovation Phase II
Student Life Improvements - $1,835,376
Network Upgrades - $650,000
Life Safety and ADA - $3,283,919
Architect: Centerline
General Contractor: Breadloaf |
| 2006 |
Construct larger shed - $2,490 |
| 2006 |
Electrical distribution - replace feeder from Mission Park to Sage - $65,000 |
| 2008 |
Electrical distribution - modify vault - $300,000 |
Morgan Hall - 1882
(Edwin Denison Morgan) |
1882 |
First campus building to be connected to a college heating plant. It was the first dorm to have plumbing, including indoor bathrooms.
Architect: J.C. Cady & Co. (NYC) |
| 1955-56 |
Restoration - $14,000
Designed by: Peter P. Welanetz, PE |
| 1965 |
Toilets |
| 1972 |
Renovation - $759,000
Architect: Winthrop M. Wassenar, PE |
| 1984 |
Sidewalks - $4,340 |
| 1985 |
Drainage - $9,000 |
| 1990-91 |
Investigate and design upgrade - $75,000 |
| 1991 |
Roof - $6,500 |
| 1991-92 |
Renovation - $1,572,568
Architect: Weese Langley Weese |
| 2005 |
Exit Stairs Replacement - $90,000 |
| 2006 |
Renovation design - $200,000
Construction - $6,089,058
Eliminate center stairways, upgrade finishes and systgems, create common rooms and kitchen
Architect: Black River Design
General Contractor: Barr & Barr |
| 2008 |
Sewer and sanitary line - Morgan/Hopkins - $60,000 |
Morley Science Laboratories - 2001
(Edward William Morley)
(see Schow Science Library)
|
1993-94 |
Unified Science Center Planning - $125,000 |
| 1995-01 |
Design and Construction - $47,827,700
Architects: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co. |
| 1997 |
New parking lots-Thompson Health Center/Brooks
Architect: Carol R. Johnson Associates, Inc. |
| 1997 |
Property acquisition (Siskind House) - $342,394 |
| 2000 |
Peter Pond sculpture - $269,244
Landscape Architect: Carol R. Johnson Associates
Sculpture: Ursula von Rydingsvard |
| 2003 |
Neuroscience lab renovation 022 - $254,012
Paul Solomon's office - $19,394
Architect: Einhorn Yaffee Prescott
General Contractor: Tierney |
| 2004 |
Morley Circle landscaping - $13,280 |
| 2004 |
Shower Modification - $13,500 |
| 2006 |
Greenhouse controls - $278,626 |
| 2006 |
MSL chiller rebuild - $30,000 |
| 2006 |
MSL chiller/Chiller Plant VFD installation - $47,000 |
| 2006 |
MSL retrocommissioning - $54,106 |
| 2008 |
Chiller #3 repair - $95,000 |
| 2008 |
Drainage field replacement - $15,000 |
| Mt. Hope/Elm Tree House |
1990 |
Renovation - $356,970 |
| 1991 |
Remove oil and gasoline storage tanks; repair retaining wall along entrance road, repair water filter for elm Tree House; replace electrical distribution panel in Elm Tree House; remove a portion of retaining wall and upgrade banking at Cow Barn- $128,000 |
| 1999 |
Renovation/code compliance - $538,966
Architect: Einhorn Yaffee Prescott |
| 2000 |
River wall - $34,366 |
| 2002 |
Renovation - $37,519 |
| 2003 |
Renovation - $25,000 |
| 2003 |
Replace oil tanks - $121,160 |
| 2003 |
Install new boiler - $37,789 |
| 2004 |
Faculty Housing Upgrades - Caretaker's House - $15,970 |
| 2004 |
Cow barn security fencing - $4,108 |
| 2004 |
Drapery replacement - $8,168 |
| 2004 |
Install new thermostats/heating system controls - $40,000 |
| 2004 |
Interior/exterior painting: Calf Barn - $17,499 |
| 2004 |
Interior/exterior painting: Elm Tree House - $25,819 |
| 2004 |
Mt. Hope roof replacement - $73,833 |
| 2004 |
Plumbing projects - treatment chamber upgrade - $5,000 |
| 2006 |
Bridge repair - $95,000 |
| 2006 |
Culverts - $155,524 |
| 2006 |
Interior renovation - $15,000 |
| 2007 |
Mt. Hope Road chip sealing - $75,000 |
| 2008 |
Historic/facility assessment - $35,000 |
| 2008 |
Walk-in cooler replacement - $30,000 |
| North Campus Utility Plan |
2007 |
Total project cost - $6,277,039 |
| 2004 |
Phase I - $3,500,000
Engineer: VanZelm, Heywood and Shadford
General Contractor: Breadloaf |
| 2004 |
Chilled Water to Chapin - $350,000 |
| 2006 |
Phase II - $2,777,039
Engineer: VanZelm, Heywood and Shadford
General Contractor: Breadloaf |
Oakley Center/Makepeace - 1936
(Francis Oakley)
(Charles D. Makepeace '00) |
1987 |
E&G building, administrative offices |
| 1992 |
Roof - $4,335 |
| 1997 |
Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000 |
| Paddle Tennis Courts - 1976 |
1976 |
Erected |
| 1988 |
Repainted - $2,500 |
| 1992 |
Heater - $3,000 |
Paresky Center - 2007
(David '60 and Linda Paresky) |
2007 |
Total project budget - $44,500,000 |
| 2001 |
Programming and predesign- $1,000,000 |
| 2002 |
Design Consultants - $2,500,000 |
| 2004 |
Construction - $35,200,000
Architect: The Polshek Partnership
General Contractor: Breadloaf |
| 2005 |
Contaminated Soil Clean-up and Additional Construction Cost
Additional funding - $8,500,000 |
| Park Street Condos |
2001 |
Purchase Unit #3-3A - $120,000 |
| 2002 |
Purchase Unit #2 - $250,000 |
| 2003 |
Purchase Unit #5 - $255,000 |
| Parking Garage - 2003 |
2001 |
Preliminary Design - $400,000 |
| 2003 |
Sitework and Construction - $5,393,158
Architect: William Rawn Associates
General Contractor: Barr & Barr |
Parsons House - 1846
(Eben B. Parsons 1859) |
1974 |
Purchased |
| 1996 |
Emergency/exit lights (Agard, Faculty House, Ft. Hoosac Parsons, Sewall, Thompson, West College) - $20,868 |
| 2001 |
Renovation - $245,827
Modify existing halls/stairwells and upgrade systems
Architect: David Westall |
| 2004 |
Interior/exterior painting - $6,500 |
Perry House - Alpha Delta Phi
(Arthur Latham Perry 1852) |
1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1970 |
Major renovation - $90,000 |
| 1984 |
Storm damage - $18,590 |
| 1990-91 |
Porch roof - $26,173 |
| 1994 |
Renovation and refurbishment - $968,874 |
| 1994 |
Roof - $76,800 |
| 2005 |
Interior/exterior painting - $22,650 |
| 2008 |
Chimney rebuild - $35,000 |
| Pine Cobble Facility Housing Development |
1988 |
Purchased - $3,500,000
Contractor: J.H. Maxymillian, Inc. |
| 1990-91 |
Housing subdivision - $7,612,000 |
| 1994-96 |
Slope stabilization - $300,460 |
| 2004 |
Fire hyrdrant replacement - $3,304 |
Poker Flats - 1993
formerly Stetson Apartments - 1946 |
1946 |
Faculty Housing Project
Architect: Kenneth Reynolds '16 |
| 1991 |
Preliminary Design - $200,000
Stetson Apartments conversion to student housing |
| 1993 |
Design and Construction - $1,400,000
Architect: Einhorn Yaffee and Prescott |
| 2004 |
Domestic hot water system - $10,352 |
| 2004 |
Matrix system - $9,676 |
| 2005 |
Sprinkler system design - Currier, Poker Flats - $30,057 |
| 2005 |
Steam distribution projects - repair infiltration - $7,500 |
| 2006 |
Residence halls sprinklers - Currier/Poker Flats - $372,666
Engineer: Fire Protection Services
General Contractor: Renau |
| 2006 |
Steamline replacement - $189,155 |
President's House - 1801
(Samuel Sloan House) |
1801 |
Samuel Sloan House, front part only; woodwork imported from Boston |
| 1954 |
Garage - $6,000
Designed by: Peter P. Welanetz, PE |
| 1961 |
Restoration - $35,000 |
| 1977 |
Decoration and furnishing - $35,000 |
| 1979 |
Refurnishing - $35,000 |
| 1985 |
Renovation - $170,300 |
| 1989-90 |
Roof - $11,170 |
| 1992 |
Repaint exterior - $109,449 |
| 1996 |
New roof (roof damaged by hurricane winds)- $74,962 |
| 2000-01 |
Upgrades - $448,000 |
| 2000-01 |
Upgrades - $100,000 |
| 2005 |
Exterior painting - $4,188 |
| 2007 |
AC upgrade - $400,000 |
Prospect House - 1962
(Prospect Mountain) |
1962 |
Built - $1,254,000
Architect: Shepley Bulfinch Richardson & Abbott |
| 1962-63 |
Prospect landscaping - $50,000
Architect: Olmsted Associates |
| 1965 |
Partition soundproofing |
| 1968 |
Berkshire/Prospect boiler - $8,600
Engineer: Richard J. Libardi |
| 1972 |
New doorways |
| 1974 |
Wall soundproofing |
| 1979 |
Fitch/Prospect steam line - $16,000 |
| 1979 |
Stairwell carpeting - $14,500 |
| 1980 |
Acoustical survey - $2,000 |
| 1984 |
Carpet rooms - $41,740 |
| 1985 |
Roof - $15,000 |
| 1985-86 |
Replace mattresses - $4,686 |
| 1986 |
Window replacement - $13,550 |
| 1986 |
Patio - $47,950 |
| 1986 |
Sound - $5,000 |
| 1990-91 |
Acoustics - $64,797 |
| 1998-99 |
Prospect/Fitch metal railing - $5,200 |
| 2004 |
Phase I - Summer '04 Renovation Project - renovate 1/2 of Prospect and relocate Radio Station to basement
Phase I Design - $250,000
Student Life Improvements Phase I and II- $1,703,089
Phase I Renovation - $1,675,000
Architect: Black River Design
General Contractor: MLB |
| 2005 |
Phase II -Renovation - renovate the other 1/2 of Prospect - $1,798,180
Architect: Black River Design
General Contractor: MLB |
| Radio Station - WCFM - Baxter Hall |
1971 |
Radio station |
| 1979 |
Renovation - $4,000 |
| 2004 |
Relocation to Prospect Basement - $423,390
Received FCC approval 1/25/05
Architect: Black River Design
General Contractor: MLB |
Rice House - c. 1900
(Richard A. Rice) |
1982 |
Conversion - $21,660 |
| 1984 |
Furniture - $8,500 |
| 1993 |
Furniture - $8,000 |
| 1994 |
Renovations - $74,336 |
| 1997 |
Roofing repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000 |
| Roper Center - 1962 |
1962 |
Addition to Stetson Library - $200,000
Architect: Hoyle, Doran and Berry |
| 1962-63 |
Landscaping - $9,000
Architect: Olmsted Associates |
| 1966 |
Seminar rooms - two computers |
| 1968 |
Third floor offices |
| 1973 |
Parking lot |
| 1973 |
Personnel offices - $5,060 |
| 1984 |
Roof replacement - $10,330 |
| 1984 |
Roper Center Career Counseling - $113,000
Architect: John Jordan, P.C. |
| Rosenberg Center - see Hopkins Forest/Rosenberg Center |
Sage Hall - 1923
(Mrs. Russell Sage) |
1923 |
Built
Architect: Cram and Ferguson |
| 1936 |
Gate between Sage and Williams erected
Architect: Cram and Ferguson |
| 1965-67 |
Piping, radiation controls and toilets |
| 1967 |
Furniture replacement |
| 1969-70 |
Entry and room lighting - hung ceilings |
| 1978 |
Flooring and wall |
| 1979 |
Renovation - $94,500 |
| 1980 |
Williams/Sage egress and room alterations - $277,500 |
| 1982 |
Stairwell - $12,000 |
| 1988 |
Asbestos removal |
| 1991 |
Water service - $9,387 |
| 1993 |
Williams/Sage Renovation Planning - $250,000 |
| 1994 |
Williams/Sage Design - $1,000,000 |
| 1995-96 |
Williams/Sage Renovation - $9,797,306
Architect: Einhorn Yaffee Prescott
General Contractor: Barry Bette & Led Duke |
| 2004 |
Repair Sage C steps - $5,218 |
| 2006 |
Electrical distribution - replace feeder from Mission Park to Sage - $65,000 |
| Saint Anthony Hall/Center for Development Economics - Delta Psi - 1886 |
1966 |
Center for Development Economics (CDE) |
| 1971 |
Sprinkler system - $18,000
Engineer: Ashley Swift |
| 1976 |
Emergency lights - $2,000 |
| 1978 |
Garfield/St. Anthony new steam line - $47,300 |
| 1994 |
Roof - $96,500 |
| 1996 |
CDE renovations and refurbishment
Design and Construction - $1,059,862
Additional Funding 1994 - $180,000 |
| 2004 |
Paint CDE trim and windows - $24,600 |
| Saint John's Rectory |
1984 |
Day care renovation - $12,000 |
| 1985 |
Day care renovation - $4,650 |
| 1994 |
Rectory renovations/building code - $13,826 |
| 2008 |
Rectory turned over to St. John's Church |
Sawyer Library - 1975
(John Edward Sawyer '39) |
1975 |
Built - $4,916,000
Architect: Harry Weese and Associates |
| 1978 |
West entry slate floor - $2,100 |
| 1980 |
Electrical primary service - $20,000 |
| 1984 |
Offices - $6,500 |
| 1985 |
Stairs - carpet replacement with rubber tile - $18,880 |
| 1988 |
Signage system - $21,790
Designer: Jonathan Cutler
Fabricator: Soheil Mosun, Inc. (Canada) |
| 1990-91 |
Design: $155,560 |
| 1990-91 |
Roof - $102,465 |
| 1990-91 |
Renovate lower level - $1,600,000
Update AV area, relocate Government Documents, and increase shelf space for book stora
Architect: Ben Weese |
| 1991 |
Automation - $650,000 |
| 1993 |
Renovation - $3,200,000
Architect: Weese Langley Weese |
| 1992 |
Computer wiring for new computerized catalogue system - $67,471 |
| 1993 |
Sawyer/Hopkins Hall: air conditioning - $745,942 |
| 1994 |
Leak repairs - $13,080 |
| 1994 |
Water line - $2,410 |
| 1994 |
Ramp - $24,728 |
| 1995 |
Work room - $12,700 |
| 1995-96 |
Sitework - Baxter, Chapin, Sawyer - $350,000
Architect: Carol R. Johnson Associates, Inc. |
| 1999 |
Workroom - $22,000 |
| 2000 |
E-mail stations - $2,137 |
| 2000 |
Reference desk relocation - $12,027 |
| 2000 |
Electronic classroom - $5,050 |
| 2003 |
Renovate reference office - $19,545 |
| 2003 |
Shelving project - $6,789 |
Schow Science Library - 2001
(Nan and Howard Schow '51) |
2001 |
See Morley Science Laboratories for construction history.
Architects: Einhorn Yaffee Prescott and Zimmer Gunsul Fresca
General Contractor: Gilbane Building Co. |
| 2006 |
Schow acoustic upgrade - $19,446 |
| 2006 |
Study rooms-power to tabletops - $9,990 |
| 2008 |
Faculty lounge/office modifications - $30,000 |
| Sears House - renamed Mears West |
Seeley House - 1920
(Charles F. Seeley) |
1976 |
Conversion to student housing - $12,500 |
| 1985 |
Conversion of Economics Department offices - $56,470 |
| 1997 |
Roof repairs (Rice, Makepeace, Smith-Rudnick, Denison Gate, Seeley, Hopkins Obs, Faculty House) - $50,000 |
| 1998 |
Restoration - $54,563 |
| Service Building - 1962 |
1962 |
Christmas Lake and brook fill and culvert project |
| 1962 |
Service Building built - $203,000
Architect: William Kirby & Peter P. Welanetz, PE |
| 1976 |
Storage building - $17,000
Fabricator: Agway, Inc. |
| 1982 |
10,000 gallon regular gas tank - $13,000 |
| 1985 |
Garage - $257,000
Architect: David J. Westall, R.A. |
| 1985 |
Thermal windows - $12,500 |
| 1985 |
Vent - $3,900 |
| 1985 |
Front office renovation - $40,500 |
| 1985 |
Replacement windows - $26,880 |
| 1986 |
Steam line from B&G to Garage - $3,160 |
| 1987 |
Offices and conference room - $50,000
Architect: David J. Westall, R.A. |
| 1989-90 |
Dust collector - $5,050 |
| 1989-90 |
Roof - $70,765 |
| 1996 |
150 KVA transformer - $12,381 |
| 1995-97 |
Back offices and conference room
Architect: Christopher Williams |
| 2003 |
Construct EH&S and Stockroom offices - $21,563 |
| 2004 |
B&G North - waterproof sidewalk - $29,467 |
| 2004 |
Hazmat shed paving - $10,500 |
| 2005 |
Paint Mixer - $2,548 |
| 2005 |
B&G North metal art studio interior/exterior painting - $3,675 |
| 2006 |
SPCC secondary containment construction - $30,000 |
| 2007 |
Digitizing print valut - $45,000 |
Sewall House
(Rev. Albert C. Sewall 1867) |
1974 |
Purchased |
| 1987 |
Interior door and lock replacement - $9,000 |
| 1991 |
Sewall/Hubbell front doors - $4,721 |
| 1996 |
Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College) - $20,868 |
| 1997 |
Fire alarm upgrade - $16,204 |
| 1999-00 |
Upgrade systems - $135,000 |
| 2008 |
Heating system replacement - $35,000 |
Shaw Boat House
(John A. Shaw) |
1970 |
Restored
Architect: John Rose '63 |
| 1984 |
Boat house - $7,970 |
| 1992 |
Dock - $14,790 |
| 1996-97 |
Repair roof, grade/resurface yard, exterior/interior painting and general repairs - $19,847 |
| 1999 |
Sliding storage racks/launch dock - $7,000
('99 R&M Athletic Projects) |
| 2006 |
Renovation - $22,471 |
| 2008 |
Renovation - $100,000 |
| Siskind House |
1996 |
Purchased - $342,394 |
| 2004 |
Boiler replacement - $20,233 |
| 2004 |
Conversion to office space - $1,300,000 |
| Smith-Rudnick |
2007 |
Athletic Office renovation - $37,066 |
| South College - see Fayerweather Hall |
| Southworth Schoolhouse |
2003 |
Acquisition and preliminary design: $400,000 |
| 2002-04 |
Design and conversion to faculty apartments- $5,504,500
Architect: Black River Design
General Contractor: Engelberth |
| 2004 |
Water/sewer lines - $6,074 |
Spencer House - Chi Psi - 1909
(Philip Spencer) |
1909 |
Built
Architect: James Purdon |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Fort Hoosac, Spencer, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1970 |
Major renovation - $64,000 |
| 1984 |
Brickwork - $6,000 |
| 1985 |
Gutters - $8,260 |
| 1991 |
Roof - $26,420 |
| 1994 |
Renovation and refurbishment - $845,046
Architect: EDM |
| 1994 |
Roof - $90,000 |
| 2004 |
Basement stair rework - $30,000 |
WLS Spencer Studio Art Building - 1996
(Wadsworth Littleford Stegeman) |
1996 |
Built - $5,606,660
Architect: Carlos Jiminez Assoc. and Cambridge Seven Assoc. |
| 1998 |
Movable light grid - $5,600 |
| 2001 |
Room 114 shelving & lighting - $2,250 |
| 2001 |
Gallery lighting - $4,650 |
| 2002 |
Soundproof 318 and 319 - $24,142 |
| 2005 |
Northwest plantings - $20,000 |
| 2006 |
Install incandescent lighting in 117, 120, 121 and 122 - $5,200 |
| 2006 |
Install sun-blocking curtains for 318 and 319 - $11,400 |
| 2006 |
Install standard TV studio scythe in 112 - $4,924 |
| 2006 |
Slide library lighting system replacement - $7,159 |
| 2008 |
Enclose 3rd floor lounge - $20,000 |
| Squash Courts - 1938 |
1938 |
Built
Architect: Shreve, Lamb '04 and Harmon |
| 1970 |
Lighting |
| 1978 |
Lighting - $6,000 |
| 1982 |
Doubles court lighting - $3,100 |
| 1984 |
Walls - $28,150 |
| 1985 |
Refinish four squash courts - $28,100 |
| 1986 |
Courts (4) - $33,010 |
| 1988 |
Asbestos removal and reinsulation in sub-basement - $69,500 |
Simon Squash Center - 1997
(Carol Girard and Cynthia Stewart Simon)
|
1997 |
Renovation - Simon Squash Center - $3,800,000
Architect: Wurmfeld Associates |
| 2004 |
Squash Courts refinish 6 courts - $6,300 |
| 2005 |
Squash Courts refinish 6 courts - $6,300 |
Stetson Hall - 1922
(Francis Lynde Stetson '67) |
1922 |
Built - $750,000
Architect: Ralph Adams, Cram and Ferguson |
| 1956 |
Library addition - $450,000
Architect: Cram and Ferguson |
| 1967 |
Hopkins to Stetson Library - steam tunnel - $30,000 |
| 1976 |
Central Office Services - $17,000 |
| 1976 |
Storm windows - $4,500 |
| 1976-77 |
Library renovation - $744,000
Architect: Harry Weese and Associates |
| 1978 |
Chapin Library and stacks: fire and security systems - $30,000 |
| 1978 |
Griffin, Stetson (old) offices, Weston, Infirmary storm windows - $9,500 |
| 1978 |
OCC refurbishing - $1,750 |
| 1979 |
Audio Visual - $12,000 |
| 1979 |
Library '57 additional repairs - $15,000 |
| 1982 |
Chapin Library security tie-in |
| 1982 |
Audio Visual renovation - $43,160 |
| 1984 |
Chapin Library window replacement - $6,000 |
| 1984 |
404 - word processing - $7,000 |
| 1984 |
Audio Visual chairs - $4,580 |
| 1985 |
Seminar room - $3,050 |
| 1987 |
Classroom renovation: carpet, tables, chairs, chalkboards and wall carpet - $35,000 |
| 1987 |
Transformer - $70,000 |
| 1988 |
Chapin Library office display area - $33,010
Architect: David J. Westall, R.A. |
| 1990-91 |
Roof - $25,875 |
| 1992 |
Renew finishes in public area adjacent to faculty offices - $122,661 |
| 1992 |
Gutters - $20,450 |
| 1992 |
Room 323 - $2,967 |
| 1993 |
Replace old high voltage feeder - $64,611 |
| 1993 |
History department office - $19,784 |
| 1994 |
Central Office Services new Xerox 5090 Duplicator and auxiliary equipment- $117,476 |
| 1995 |
Basement - $24,463 |
| 1995 |
Elevator/ADA & signs - $15,900 |
| 1995 |
Audio Visual air conditioning - $2,379 |
| 1997 |
Elevator recall for code requirements - $8,500 |
| 1997 |
Audio Visual - replace carpeting - $5,026 |
| 1997 |
Audio Visual renovation/refurbishment - $12,841 |
| 1997 |
Political Science offices - renovate department chair and secretary offices - $16,179 |
| 1998 |
Rekey doors - $18,603 |
| 1998 |
Fire alarm upgrade - $12,174 |
| 1998 |
Library stacks - $22,000 |
| 1998 |
Stetson Hall/Chapin Library egress - $25,000 |
| 1998 |
Faculty secretarial office - $15,400 |
| 1999 |
COS - Xerox 9900 and other equipment - $170,000 |
| 1999 |
OCC renovation - $25,000 |
| 2000 |
Political Science common area - $3,531 |
| 2001 |
Information Technology - create teaching space - $11,279 |
| 2002 |
Chapin Library cases - $1,585 |
| 2003 |
Install Locknetics/Jesup and Stetson OIT media labs - $4,400 |
| Stetson/Sawyer Project |
2006 |
Total project budget - $128,000,000 |
| 2003 |
Programming - $1,000,000 |
| 2004 |
Design: $2,000,000
Architect: Bohlin Cywinski Jackson
General Contractor: Barr & Barr |
| 2005 |
Continued Design Work: $2,000,000 |
| 2006 |
Completion of Design and Construction: $123,000,000 |
| 2008 |
Off-Site Storage/Simonds Road Property Purchase and Development - $2,350,000
General Contractor: Barr & Barr |
| Taconic Golf Club - 1955 |
1955 |
Club House - $70,000
Architect: Seymour Saltus |
| 1962 |
Club House addition - $55,000
Designed by: Peter P. Welanetz, PE |
| 1962 |
Parking lot |
| 1969 |
Alteration - $35,000
Architect: William Kirby, Jr. |
| 1985 |
Women's locker room addition - $200,000
Architect: William Kirby, Jr. |
| 1988 |
Bridges - $24,900 |
| 1989-90 |
Dams - $25,000 |
| 1995 |
Irrigation system |
| Taconic House - renamed Fort Hoosac |
| Thompson Biology Lab - 1893 |
1893 |
Built
Architect: Francis R. Allen (Allen & Collens) |
| 1949-51 |
Biology Laboratory addition - $900,000
Architect: Des Granges and Steffian |
| 1950 |
Lab major restoration - old section |
| 1971 |
Library |
| 1973 |
Basement |
| 1976 |
Masonry repairs |
| 1976 |
Furniture - $4,000 |
| 1976 |
Lab Renovation - $2,500 |
| 1977 |
Heat controls - $25,000 |
| 1977-78 |
1st floor labs - $97,000 |
| 1978 |
Greenhouse - $35,000 |
| 1978 |
Biology, Chemistry, Physics, Clark Hall insulation - $12,300 |
| 1979 |
Roof repairs - $40,000 |
| 1979 |
Lab Renovation - $160,000 |
| 1984 |
Elevator doors - $6,690 |
| 1985 |
Aquarium - $6,100 |
| 1987-92 |
Renovations:
1987-88 - Phase 1 - $273,985
1988-89 - Phase II - $204,680
1988-89 - Phase III - $70,150
1991-92 - Phase IV - $64,226 |
| 1988 |
Asbestos removal - $53,800 |
| 1989-90 |
Rewiring - $33,558 |
| 1991 |
Fume air handling unit - $10,987 |
| 1992 |
Animal test lab - $2,766 |
| 1992 |
Emergency lights - $17,870 |
| 1993 |
Fume hoods - $24,573 |
| 1993 |
Labs 021/014 - $39,174 |
| 1993 |
Foyer - $11,742 |
| 1994 |
Convert Biology #1 to lab - $38,531 |
| 1994 |
Bio 111 - $26,247 |
| 1995 |
Bio 111 - $43,542 |
| 1999-00 |
Unified Science Center: renovation - $3,102,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co. |
| 2003 |
Lobby and student space furniture - $5,000 |
| 2004 |
Physics/Biology/Chemistry - repair exterior stone - $27,742 |
| 2004 |
Network Chemistry and Biology upgrades - $70,000 |
| 2006 |
Seating/carpeting room 112 - $68,000 |
| 2006 |
Sciences lighting improvements - $30,000 |
| 2006 |
Thompson Sciences masonry repair - $174,500
Engineer: Ryan-Biggs |
| 2007 |
Thompson Sciences masonry repair - $155,000
Engineer: Ryan-Biggs |
| 2008 |
Room 309 renovation - $45,000 |
| 2008 |
Rooms 003 and 004 - combine - $11,500 |
| 2008 |
Thompson Sciences masonry repair - $410,000
Engineer: Ryan-Biggs |
| Thompson Chemistry Lab - 1893 |
1893 |
Built
Architect: Francis R. Allen (Allen & Collens) |
| 1915 |
Burned down |
| 1916 |
Rebuilt
Architect: Francis R. Allen (Allen & Collens) |
| 1941 |
Major addition: enlarged and modernized |
| 1951 |
Physics and Chemistry parking lot |
| 1958-61 |
Alterations - $75,000
Designed by: AB Stanley/Peter P. Welanetz, PE |
| 1964 |
Laboratory remodeling - $75,000
Architect: William Kirby, Jr. |
| 1966 |
Laboratory renovation - $42,000
Designed by: Winthrop M. Wassenar/Harold Warren |
| 1968 |
Laboratory renovation: 2nd & 3rd floors - $125,000
Designed by: Winthrop M. Wassenar/Harold Warren |
| 1972 |
Library expansion and room 41 |
| 1976 |
Masonry repairs |
| 1976 |
Lab equipment and alterations - $14,400 |
| 1978 |
Biology, Chemistry, Physics, Clark Hall insulation - $12,300 |
| 1984 |
Laboratory renovation lower level west - $189,480 |
| 1985 |
Renovation - $29,400 |
| 1987 |
Asbestos removal: chemical storage room - $16,500 |
| 1988 |
Asbestos removal: room 36 and 37 - $7,500 |
| 1989-90 |
Electrical design - $22,730 |
| 1989-90 |
Lab - $16,300 |
| 1990-91 |
Upgrade service capacity and replace faulty wiring - $119,418 |
| 1990-91 |
Astronomy telescope - $130,967 |
| 1993 |
Ventilation upgrade - $302,758 |
| 1993 |
Chemistry rooms - $2,735 |
| 1994 |
Blackboards - $4,728 |
| 1999-00 |
Unified Science Center: renovation - $3,273,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co. |
| 2004 |
Physics/Biology/Chemistry - repair exterior stone - $27,742 |
| 2004 |
Install blackout shades and Laser Interlock System - $2,983 |
| 2004 |
Network Chemistry and Biology upgrades - $70,000 |
| 2006 |
Sciences lighting improvements - $30,000 |
| 2006 |
Add natural gas line to 206 - $4,223 |
| 2006 |
Thompson Sciences masonry repair - $174,500
Engineer: Ryan-Biggs |
| 2007 |
Computer Science Office Construction - $30,049 |
| 2007 |
Thompson Sciences masonry repair - $155,000
Engineer: Ryan-Biggs |
| 2008 |
Thompson Sciences masonry repair - $410,000
Engineer: Ryan-Biggs |
Thompson Hall - 1911
(Mary Clark Thompson) |
1911 |
Infirmary built
Architect: Allen & Collens |
| 1956 |
Infirmary addition and connecting passage |
| 1978 |
Griffin, Stetson (old) offices, Weston, Infirmary storm windows - $9,500 |
| 1982 |
Renovation - $75,000 |
| 1986 |
Conversion from infirmary to dorm - $377,000
Architect: Hallock Architects, Inc. |
| 1996 |
Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College- $20,868 |
| 1997 |
New parking lots (Thompson/Weston Field) - $400,000 |
| 1998 |
Renovation and refurbishment - $1,121,774
Architect: Thomas Bartels |
| 2002 |
Student Parking Lot
Design and Construction - $300,339
Architect: Halvorson |
| 2004 |
Lower parking lot screening - $5,400 |
| 2005 |
Interior/exterior painting - $16,145 |
| 2006 |
Sprinkler system - $182,467
Last student residence hall to be sprinklered. |
Thompson Memorial Chapel - 1905
(Frederick Ferris Thompson '56) |
1905 |
Compare the Gothic of Goodrich Hall
Architect: Francis R. Allen (Allen and Collens)
Windows: The Church Decorating Company (New York) |
| 1954 |
Chapel parking lot
Architect: Olmsted Associates |
| 1964-65 |
Chapel exterior major restoration |
| 1978 |
Basement kitchen - $3,500 |
| 1979 |
Basement schematics - $2,500 |
| 1982 |
Hallway paint and light - $4,280 |
| 1983 |
Stained glass window repair - $18,000 |
| 1985 |
Chapel wall masonry repair - $65,000 |
| 1986 |
Wall rebuilt - $40,000 |
| 1987 |
Asbestos removal: tunnel under hallway - $14,900 |
| 1989-90 |
Lower level renovation - $109,045 |
| 1991 |
Basement offices - $10,166 |
| 1992 |
Storm drain - $15,000 |
| 1996-97 |
Steam line - Thompson Chapel/Griffin - $295,559 |
| 1997 |
Energy conservation including Chapel lighting - $25,000 |
| 1997 |
Chapel bells - $21,000 |
| 1998 |
Newman Association - $16,400 |
| 2000-01 |
Lighting/plaques/design - $275,000 |
| 2004 |
Centennial Celebration
Restore and clean masonry - $414,424
Architect: Ryan-Biggs
General Contractor: Allegrone |
| 2004 |
Windows - lead replacement - $106,619 |
| 2005 |
Masonry Inspection - $56,178 |
| 2005 |
I&I investigation - $3,000 |
| 2006 |
Install hard-wired card access entry system - $2,781 |
| 2006 |
Install indirect lighting in Catholic space - $7,173 |
| 2006 |
Install new lighting in Newman Chapel - $4,500 |
| 2006 |
O'Connell room-fluorescent lighting replacement - $10,000 |
| 2006 |
Purchase miscellaneous furniture - $7,240 |
| 2006 |
Sidewalks repairs - Griffin/Chapel - $128,501 |
| 2008 |
Replace dimmer system - $45,000 |
| Thompson Physical Lab - 1893 |
1893 |
Built
Architect: Francis R. Allen (Allen & Collens) |
| 1949-51 |
Addition - $900,000
Architect: Des Granges and Steffian |
| 1950 |
Lab major restoration - old section |
| 1951 |
Physics and Chemistry parking lot |
| 1961 |
Library expansion - $12,000 |
| 1964 |
First floor lab |
| 1976 |
Masonry repairs |
| 1976 |
Astronomy library - $3,000 |
| 1978 |
Biology, Chemistry, Physics, Clark Hall insulation - $12,300 |
| 1979 |
Astronomy dome - $18,900 |
| 1985 |
Renovation - $895,500
Architect: Hallock Architects, Inc. |
| 1992 |
Physics library - $3,315 |
| 1993 |
Heliostat - $6,233 |
| 1996 |
Room 6 - new A/C unit - $15,488 |
| 2000-01 |
Unified Science Center: renovation - $2,218,000
Architect: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co. |
| 2003 |
Renovate office and student lab |
| 2004 |
Physics/Biology/Chemistry - repair exterior stone - $27,742 |
| 2004 |
Lab/Storage - $27,497 |
| 2006 |
Sciences lighting improvements - $30,000 |
| 2006 |
Conversion Room 014 - $2,801 (project cancelled) |
| 2006 |
Thompson Sciences masonry repairs - $174,500
Engineer: Ryan-Biggs |
| 2007 |
Thompson Sciences masonry repair - $155,000
Engineer: Ryan-Biggs |
| 2008 |
Install handicap ramp - $120,000 |
| 2008 |
Thompson Sciences masonry repair - $410,000
Engineer: Ryan-Biggs |
Thompson Center for Health Services - 1985
(Mary Clark Thompson) |
1985 |
Built - $821,000
Architect: David J. Westall, R.A. |
| 1994 |
Oil tanks - $14,119 |
| 1997 |
Director's office - $9,100 |
| 2002 |
Carpet and ceiling tiles - $4,441 |
| 2006 |
Convert xray room into meeting/office space - $1,750 |
Towne Field House - 1970
(Herbert S. Towne '21) |
1970 |
Built - $1,000,000
Engineer: Lockwood Greene Co. |
| 1977 |
Resurface floor - $12,000 |
| 1978 |
Volleyball courts - $11,000 |
| 1982 |
Storage addition - $35,670
Architect: David J. Westall, R.A. |
| 1983-84 |
Resurface floor - $44,000 - Tartan(green)/Rekortan(red) |
| 1985 |
Relamping - $16,750 |
| 1985 |
Roof - $123,000 |
| 1996 |
Bathrooms - $72,392 |
| 1997 |
Repair water line - $15,577 |
| 1997 |
Repair wood buttresses - $32,000 |
| 1997 |
Water line - $20,607 |
| 2005 |
Indoor Track Resurface - $100,008 |
Treadway House - 1917
(John Treadway)
|
1991 |
Purchase and Renovation - $75,000 |
| Tyler Annex - 1972 |
1972 |
Built - $532,000
Architect: Unitec, Inc. and Gary Lindstrom & Assoc. |
| 1996 |
Standby pumps/perimeter radiation (Garfield/Tyler Annex - $2,831 |
| 2001-02 |
Renovation and upgrade systems - $966,457
Architect/General Contractor: Breadloaf |
John C. Tyler House - Psi Upsilon - 1925
(Lt. John Cowperthwaite Tyler '15) |
1925 |
Built
Architect: Andrews, Jones, Briscoe & Whitmore |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Wood) - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1982 |
Interior door jambs - $13,000 |
| 1982 |
Interior renovation - $42,000 |
| 1986 |
Window replacement - $10,000 |
| 1999 |
Enclose stairway and upgrade systems - $50,000 |
| 2001-02 |
Renovation and upgrade systems - $1,282,174
Architect/General Contractor: Breadloaf |
| 2006 |
Residence hall access - Matrix - Susie Hopkins and Tyler - $20,786 |
| Unified Science Center - 2001 |
1993-94 |
Planning - $125,000 |
| 1995-01 |
Project Total Cost - $47,846,499
Design 2005 - $2,000,000
New Construction 1996 - $1,600,000
Construction 1997 - $13,000,000
Construction 1999 - $13,000,000
Construction 2000 - $6,200,000
Construction 2000 - $14,200,000
Complete Construction 2000 - $2,500,000
Architects: Einhorn Yaffee Prescott and Zimmer Gunsul Frasca
General Contractor: Gilbane Building Co. |
| 1996-97 |
New parking lots-Thompson Health Center/Brooks
Architect: Carol R. Johnson Associates, Inc. |
| 1996-97 |
Property acquisition (Siskind House) - $342,394 |
| 2000 |
Peter Pond sculpture - $400,000
Landscape Architect: Carol R. Johnson Associates
Sculpture: Ursula von Rydingsvard |
Vogt '58 House - formerly 63 Park Street
(Carl W. Vogt '58) |
2000 |
Purchase - $487,000 |
| 2001 |
Total Project Cost - $1,594,717
Sitework - $150,000
Architect: Mark Hammer
General Contractor: MLB |
| 2002 |
Sitework - $150,000 |
| 2002 |
Landscape projects - $30,000 |
| 2006 |
Build an inside door in main entrance - $1,481 |
| 2008 |
Level floors - $100,000 |
West College - 1790
(West Township original name of Williamstown) |
1790 |
Built |
| 1855 |
Remodeled - central door out, north and south doors cut in |
| 1904 |
Remodeled and north door sealed up |
| 1951 |
Burned January 2, 1951 |
| 1952 |
Rebuilt - $225,000 (fire 1/2/51)
Architect: Perry, Shaw, Hepburn, Kehoe and Dean |
| 1982 |
Lounge - $11,000 |
| 1982 |
Steps and landscaping - $19,760 |
| 1996 |
Emergency/exit lights (Agard, Faculty House, Ft. Hoosac, Parsons, Sewall, Thompson, West College) - $20,868 |
| 1999 |
Renovation and refurbishment - $850,074
Architect: Primary Group |
| 2005 |
Steam distribution projects - return line - $3,849 |
| Weston Field/Structures - 1951 |
1951 |
Field house - $17,500
Designed by: Peter P. Welanetz, PE |
| 1953 |
Press box built - $1,000
Designed by: Peter P. Welanetz, PE |
| 1964-65 |
Rebuilding varsity baseball diamond |
| 1969 |
Electric scoreboard |
| 1972 |
Bleachers |
| 1984 |
Bleacher replacement - $57,300 |
| 1984 |
Press box replacement - $95,000
Architect: David J. Westall, R.A. |
| 1984 |
Weston Field survey - $3,000 |
| 1987 |
New track and relocate baseball field - $1,243,100
Architect: Saratoga Associates |
| 1989-90 |
Communications - $5,700 |
| 1989-90 |
Well - $3,170 |
| 1991 |
Baseball warning track - $15,653 |
| 1993-94 |
Track re-coat - $70,000 |
| 1995 |
Bleachers - $11,500 |
| 1996 |
Correct drainage problem - $74,967 |
| 1996-97 |
New parking lots (Thompson/Weston Field) - $400,000 |
| 1998 |
25-second clock - $4,295 |
| 1999 |
Track repair - $6,000 |
| 2000 |
Baseball Grandstand - relocate and restore - $254,745
Architect: Christopher Williams |
| 2003 |
Interior/Exterior Painting - Weston Press Box - $8,800 |
| 2004 |
Fence Repair - $63,397 |
| 2004 |
Renzie Lamb Synthetic Turf Field - $1,993,460
Architect/General Contractor: Clark Company |
| 2006 |
Track repair and discus circle - $287,213 |
| 2008 |
Weston Field Improvements
Design and Construction - $17,600,000
Architect: Moser Pilon Nelson/Clark Companies
General Contractor: Daniel O'Connell's Sons, Inc. |
Karl E. Weston Language Center - formerly Phi Delta Theta - 1905
(Karl Ephraim Weston '96) |
1965 |
Alteration to former Phi Delta Theta Fraternity House
Designed by: Ralph W. Iacuessa |
| 1966 |
Weston/Brooks parking lot - $19,000
Designed by: Winthrop M. Wassenar, PE
Architect: Daniel O'Connell & Sons |
| 1966 |
3rd floor |
| 1978 |
Griffin, Stetson (old) offices, Weston, Infirmary storm windows - $9,500 |
| 1982 |
Mail equipment |
| 1984 |
Furniture - $6,300 |
| 1984 |
Personnel furniture - $3,500 |
| 1985 |
Lounge - $4,630 |
| 1987 |
Complete asbestos removal - $24,200 |
| 1987 |
Renovation - $12,600 |
| 1987 |
Classrooms and offices - $250,000 |
| 1987-88 |
New Language Lab - Phases I-III - $897,125
Architect: William Kirby, Jr. and David J. Westall, R.A. |
| 1988 |
Roof repair - $25,000 |
| 1989 |
Language Lab renovation - Phase IV - $140,000 |
| 1992 |
Convert Conference offices to faculty offices - $150,000 |
| 2000 |
Room 34 alterations - $4,320 |
| 2001 |
Lab renovation - $39,706 |
| 2003 |
A/V room - $8,448 |
| 2006 |
Drainage - $1,097 |
| 2008 |
Renovation |
| Williams Club, New York - 1986 |
1986 |
Built - $520,500 |
Williams Hall - 1911
(Colonel Ephraim Williams) |
1911 |
Built
Architect: Ralph Adams, Cram, Goodhue and Ferguson |
| 1965 |
New doors |
| 1967 |
Furniture replacement |
| 1967-70 |
Piping, radiation controls and toilets |
| 1969 |
Entry lighting |
| 1976 |
New bathroom and partitions - $15,000 |
| 1979 |
Entry B bathroom - $17,000 |
| 1980 |
Williams/Sage egress and room alterations - $277,500 |
| 1986 |
Transformer - $32,100 |
| 1989-90 |
Paint - $11,680 |
| 1991 |
Replace transformer and cable from Williams to Mission Park - $94,000 |
| 1993-94 |
Williams/Mission Park steam line - $51,770 |
| 1993-96 |
Williams/Sage Planning 2003 - $250,000
Design 2004 - $600,000
Remove old transformer; clean out vault - $50,000
Design 2004 - $400,000
Design and Construction - $9,797,820
Architect: Einhorn Yaffee Prescott
General Contractor: Barry Bette & Leduke |
| 2004 |
Repair Williams C steps - $5,218 |
| Williams Oxford |
1985 |
Acquisition - $804,000 |
| 1985 |
Improvements - $607,000
Architect: The Oxford Architects Partnership |
| 1991 |
Renovation - $75,000 |
| 1996 |
Smoke detectors - $7,723 |
| 1998 |
Renovation (1st year out of 4) - $10,000 |
| 1999 |
Renovation (2nd year out of 4) - $10,000 |
| 2002 |
Refurbish 1 Morteon - $12,997 |
| 2003 |
Furniture - $2,500 |
| 2003 |
145 Banbury roof - $20,000 |
| 2003 |
Repave courtyard - $60,000 |
| 2005 |
33 Tenison Road, Cambridge
Purchase and Renovation - $1,142,155 |
| 2005 |
Renovation - $94,567 |
| 2006 |
Exterior repairs - $103,573 |
Wood House - Zeta Psi - 1905
(Hamilton B. Wood '10) |
1905 |
Built - $15,000
Architect: John B. Snook, Inc. (New York) |
| 1927 |
Library addition - $29,858
Architect: Charles C. May |
| 1969 |
Sprinkler system (Agard, Bascom, Brooks, Perry, Spencer, Fort Hoosac, Tyler, Wood) - $160,000
Engineer: Automatic Sprinkler Corp. |
| 1969 |
Major renovation - $88,000 |
| 1985 |
Drainage - $6,030 |
| 1999 |
Renovation and refurbishment - $1,047,897
Architect: Primary Group |
| Woodbridge House - c. 1900 |
1977 |
Conversion to student housing - $53,000 |
| 1997 |
Refurbishment and upgrades - $244,940
Additional Funding - $117,000
Refurbish student living space and upgrade systems |
| 2004 |
Interior/exterior painting - $4,700 |
| |