1791-93 |
West College (West Township original name of Williamstown)
Remodeled 1855 - central door out and north and south doors cut in. Remodeled 1904 and north door sealed up. |
1801 |
President's House (Samuel Sloan House)
Front part only; woodwork imported from Boston |
1828 |
Griffin Hall (Edward Dorr Griffin)
Originally had double entrance and stood near Main St. Built by President Griffin at a cost of $6,000; served as chapel until 1859 (when Goodrich Hall was built), library built 1847, and lecture room; moved to northeast in 1904 and remodeled. The building was originally called "the brick chapel," and was named Griffin Hall in 1859.
Architect: Harding and Seaver |
1837 |
Hopkins Observatory (Albert Hopkins)
Built by Professor Albert Hopkins and students near East College. Moved in the 1850's to the south end of the Berkshire Quad. In 1962, it was moved to the north end of the Berkshire Quad.
Cost: $2,075 |
1842 |
East College
Rebuilt - the original building of 1798 burned in 1841. In 1907 larger doorways added.
Designed by J.S. Oakman '99. |
1842 |
South College (Fayerweather Hall)
Gold Coast addition to south in 1905 and the building renamed Fayerweather.
Architect: Allen & Collens |
1846 |
Lawrence Hall (Amos Lawrence)
Octagonal Library, cost $7,000.
Architect: Thomas Tefft, (Providence).
East and west wings 1890; additions at rear in 1915, 1926, 1938. Became Art Museum in 1926. |
1859 |
Goodrich Hall (John Zaccheus Goodrich)
Chapel and Alumni Hall - shift to stone (local dolomite) and to Gothic.
Architect: Gervase Wheeler |
1882 |
Morgan Hall (Edwin Denison Morgan)
First campus building to be connected to a College heating plant. It was the first dorm to have plumbing, including indoor bathrooms.
Architect: J.C. Cady and Co. (N.Y.C.) |
1886 |
Lasell Gymnasium (Edward Lasell '28 and Josiah Lasell '84)
Architect: J.C. Cady and Co. (N.Y.C.) |
1893 |
Thompson Scientific Laboratories
Architect: Francis Allen (Allen & Collens)
(designed all three and rebuilt the chemistry building).
Chemistry Laboratory burned 1915, rebuilt 1916; enlarged and modernized 1941. |
1897 |
Hopkins Hall (Mark Hopkins)
Based on Romanesque style of Henry Hobson Richardson; memorial to Mark Hopkins (d. 1887).
Cost: $87,000
Architect: Francis Allen and Kenway (Boston) |
1899 |
Jesup Hall (Morgan Ketchum Jesup)
Campus center, orange brick, painted yellow
Architect: George Tilden
Remodeled 1908 by John S. Oakman '99 |
1902 |
College Garage |
1905 |
Berkshire Hall (renamed Ebenezer Fitch Hall in 1963)
Architect: Francis R. Allen (Allen and Collens) |
| 1905 |
Goodrich Hall
Remodeled and named Goodrich. |
1905 |
Thompson Memorial Chapel (Frederick Ferris Thompson '56)
Compare the Gothic of Goodrich Hall
Architect: Francis R. Allen (Allen and Collens)
Windows: The Church Decorating Company (N.Y.) |
1905 |
Wood House (Hamilton B. Wood '10)
Architect: John B. Snook, Inc. (New York) |
1908 |
Currier Hall (Lura Ormsbee Currier)
Architect: Robins and J.S Oakman '99 |
1908 |
Clark Hall (Edward Clark '31) (Geology)
Old Clark Hall (wooden) pulled down 1886
Architect: Frank Wallis and William J. Rogers |
1909 |
Spencer House (Philip Spencer)
Architect: James Purdon |
1911 |
Thompson Hall Infirmary (Mary Clark Thompson)
Architect: Allen & Collens |
1911 |
Williams Hall (Colonel Ephraim Williams)
Architect: (Ralph Adams) Cram, Goodhue and Ferguson |
1911/12 |
Chapin Hall (Alfred Clark Chapin) (formerly Grace Hall named after Mrs. Chapin)
Cost: $259,313; cost of organ $45,800
Architect: (Ralph Adams) Cram, Goodhue and Ferguson |
1922 |
Stetson Hall Library (Francis Lynde Stetson '67)
Cost: $750,000
Architect: (Ralph Adams) Cram and Ferguson |
1923 |
Sage Hall (Mrs. Russell Sage)
Architect: (Ralph Adams) Cram and Ferguson
Gate between Williams and Sage erected 1936 |
1925 |
Mears House (Brainerd Mears)
Architect: (Ralph Adams) Cram and Ferguson |
1925 |
Tyler House (Lt. John Cowperthwaite Tyler '15)
Architect: Andrews, Jones, Briscoe & Whitmore |
1926 |
Cole Field House
Architect: Densmore, LeClare and Robbins (Boston) |
1928 |
Lasell Extension South of Gymnasium
Architect: Densmore, LeClare and Robbins (Boston) |
1928 |
Lehman Hall (Herbert Lehman '99)
Architect: (Ralph Adams) Cram and Ferguson |
1931 |
Taconic House (Fort Hoosac)
Architect: Grosvenor S. Wright |
1934 |
Heating Plant
Architect: (Ralph Adams) Cram and Ferguson |
1938 |
Faculty House/Alumni Center
Cost: $150,000
Architect: T.H. Ellett (N.Y.). |
1938 |
Squash Courts
Architect: Shreve, Lamb '04 and Harmon |
1941 |
Adams Memorial Theatre (John Quincy Adams)
Cost: approx. $250,000
Architect: Hoyle (Cram and Ferguson)
Tech. Advisor: Stanley McCandless (Yale School of Drama) |
1941 |
Alumni House/The Log
Architect: Kenneth Reynolds '16 |
1946 |
Faculty Housing Project (Stetson Road Apartments-12)
Architect: Kenneth Reynolds '16 |
1949-51 |
Thompson Physics and Biology Laboratory
Additions: $900,000
Architect: Des Granges and Steffian |
1951 |
Weston Field House
Cost: $17,500
Designed by: Peter P. Welanetz, P.E. |
1952 |
Alumni House
West College room addition: $28,000
Architect: Kenneth Reynolds '16 |
1952 |
Griffin Hall
Restored: $29,000
Designed by: Peter P. Welanetz |
1952 |
West College
Rebuilt: $225,000 (Fire 1/2/51)
Architect: Perry, Shaw, Hepburn, Kehoe and Dean |
1953 |
Baxter Hall (James Phinney Baxter III '14)
Cost: $1,500,000
Architect: Perry, Shaw, Hepburn, Kehoe and Dean |
1953 |
Heating Plant
Addition: $300,000
Architect: Lockwood Greene Co. |
1953 |
Lansing Chapman Rink and Machinery Building (William Lansing Chapman '10)
Cost: $100,000
Architect: Mollenburg and Betz |
1953 |
Weston Field
Press Box built: $1,000
Designed by: Peter P. Welanetz, P.E. |
1954 |
President's House
Garage: $6,000
Designed by: Peter P. Welanetz, P.E. |
1954/57 |
Currier Hall
Restoration and Music Department: $35,000
Designed by: Peter P. Welanetz, P.E. |
1955 |
Baxter Hall - Rathskeller
Basement of Baxter Hall: $18,250
Designed by: Perry, Shaw, Hepburn, Kehoe and Dean & William C. Bryant |
1955 |
Taconic Golf Club House
Cost: $70,000
Architect: Seymour Saltus |
1956 |
East College
Rebuilt: $267,000
Architect: Cram and Ferguson |
1956 |
Mather House (Benjamin F. Mather)
Restored: $37,000
Architects: William Gass and Peter P. Welanetz, P.E. |
1956 |
Stetson Hall
Library Addition: $450,000
Architect: Cram and Ferguson |
1957 |
Conversion of Electrical Distribution System
Conversion from 2300 to 4140 volts: $11,800
Designed by: Northern Berkshire Electric Co. |
1957 |
Fayerweather Hall (Daniel F. Fayerweather)
Rebuilt: $325,000
Architect: Cram and Ferguson |
1958-61 |
Thompson Chemistry Building
Alterations: $75,000
Designed by: A. B. Stanley and Peter P. Welanetz, P.E. |
1961 |
Brooks House (Belvidere Brooks '10)
Architect: Daniel O'Connell & Sons |
1961 |
Lansing Chapman Hockey Rink
Canopy: $176,500
Architect: Lockwood Greene Co. |
1961 |
Thompson Physics Library
Expansion: $12,000 |
1962 |
Hopkins Observatory (Albert Hopkins)
Moving of Observatory: $50,000 |
1962 |
New Planetarium - Hopkins Observatory
Cost: $25,000
Designed by: Spitz Laboratories |
1962 |
Prospect House (Prospect Mountain)
Cost: $1,200,000
Architect: Shepley, Bulfinch, Richardson and Abbott |
1962 |
Service Building
Cost: $200,000
Architects: William Kirby and Peter P. Welanetz, P.E. |
1962 |
Stetson Hall - Roper Center
Addition to Stetson Library: $200,000
Architect: Hoyle, Doran and Berry |
1962 |
Taconic Golf Club
Club House Addition: $55,000
Designed by: Peter P. Welanetz, P.E. |
1963 |
Driscoll Dining Hall (Alfred E. Driscoll '25)
Berkshire Quadrangle - dining/lounge building: $385,000
Architect: Shepley, Bulfinch, Richardson and Abbott |
1963 |
Fitch House (formerly Berkshire Hall)
Restored: $180,000
Architect: The Architects Collaborative |
1964 |
Currier Hall
Renovation: $180,000
Architect: The Architects Collaborative |
1964 |
Thompson Chemistry Laboratory
Laboratory Remodeling: $75,000
Architect: William Kirby, Jr. |
1964-65 |
Replacement and Extension of Steam Distribution System
Cost: $129,000
Engineer: Lockwood Greene Co. |
1964-65 |
Thompson Memorial Chapel
Exterior major restoration |
1965 |
Greylock Residential Houses
Design and Construction: $2,700,000
William Cullen Bryant, Franklin Carter, Washington Gladden, Mark Hopkins and Greylock Dining
Architect: The Architects Collaborative |
1965 |
Karl E. Weston Language Lab (Karl Ephraim Weston '96)
Alteration to former Phi Delta Theta Fraternity House
Designed by: Ralph W. Iacuessa |
1968 |
Bronfman Science Center (Edgar M. Bronfman '50)
Design and Construction : $3,750,000
Architect: Benjamin Thompson & Associates, Inc. |
1968 |
Fernald House (Orlando Marcellus Fernald)
Addition: $6,200
Designed by: Ralph W. Iacuessa |
1969 |
Clark Hall
Renovation: $350,000
Architect: Lockwood Greene Co. |
1969 |
Lansing Chapman Rink
Total enclosure and connecting building: $900,000
Engineer: Lockwood Greene Co. |
1969 |
Sprinkler System
Agard, Bascom, Brooks, Fort Hoosac, Perry, Spencer, Tyler, Wood: $160,000
Engineer: Automatic Sprinkler Corp. |
1969 |
Taconic Golf Club
Alteration: $35,000
Architect: William Kirby, Jr. |
1970 |
Heating Plant
Addition and alteration (oil storage facility): $615,000
Engineer/Architect: Lockwood Greene Co. |
1970 |
Lasell Gym - Women's Athletic Facility
Design and Construction: $125,000
Architect: Lockwood Greene Co. |
1970 |
John A. Shaw Boathouse
Architect: Jonathan Rose '63 |
1970 |
Herbert S. Towne Field House (Herbert S. Towne '21)
Design and Construction : $1,000,000
Engineer: Lockwood Greene Co. |
1971 |
Baxter Hall - Radio Station - WCFM |
1971 |
Mission Park Residential Houses
(Samuel John Mills 1809; Samuel Chapman Armstrong 1862; James Bissett Pratt 1898; Tyler Dennett 1904)
Design and Construction: $5,415,000
Architect: Mitchell-Giurgola Associates |
1972 |
Dodd Annex (formerly Williams Inn)
Williams Inn Annex #3: $39,000
Designed by: Peter P. Welanetz, P.E. |
1972 |
Morgan Hall
Renovation: $759,000
Architect: Winthrop M. Wassenar, P.E. |
1972 |
Tyler Annex
Cost: $532,000
Architect: Unitec Inc. and Gary Lindstrom and Associates |
1973 |
Chaffee Tennis House (Clarence Chaffee)
Design and Construction: $13,000
Designed by: Peter P. Welanetz, P.E. |
1975 |
Sawyer Library (John Edward Sawyer '39)
Design and Constructioni : $4,916,000
Architect: Harry Weese and Associates |
1976 |
Service Building
Storage building: $17,000
Fabricator: Agway Inc. |
1976-77 |
Stetson Hall
Renovation: $744,000
Architect: Harry Weese and Associates |
1977 |
Chapin Hall
Renovation Phase I: $400,000
Architect: Cambridge Seven Associates, Inc. |
1978 |
Bernhard Music Center (Arnold Bernhard '25)
Brooks-Rogers Recital Hall (Mrs. Belvidere Brooks and Alan Rogers '09)
Presser Choral Hall (Theodore Presser)
Phase II: $2,300,000
Architect: Cambridge Seven Associates, Inc. |
1978 |
Garfield House (Henry Augustus Garfield 1885)
Renovation: $501,000
Architect: Gary Lindstrom and Associates |
1979 |
Fire Protection Safety Systems
Cost: $104,750 |
1982 |
Herbert S. Towne Field House
Storage Addition: $35,670
Architect: David J. Westall, R.A. |
1983 |
Adams Memorial Theatre
Down stage addition: $937,000
Architect: Cambridge Seven Associates, Inc. |
1983 |
Dimension Phone System
Purchase and installation: $42,000 |
1983 |
Faculty House/Alumni Center
Addition: $1,245,000
Architect: Cambridge Seven Associates, Inc. |
1983 |
Lawrence Hall - Williams College Museum of Art
Phase I: $4,980,000
Architect: Moore, Grover and Harper |
1984 |
Baxter Hall
Phase I: $916,000
Architect: John Jordan, P.A. |
1984 |
Heating Plant
Economizer: $127,700
Engineer: Pope Engineers |
1984 |
Jesup Hall (Morris Ketchum Jesup)
Computer Center: $1,960,500
Architect: John Jordan, P.A. |
1984 |
Mather House
Admissions Office Renovation: $114,500
Architect: David J. Westall, R.A. |
1984 |
Mears House
Alumni/Development Offices: $477,300
Architect: John Jordan, P.A. |
1984 |
Spring Street
Parking Lot: $173,350
Architect: William Kirby, Jr. |
1984 |
Stetson Hall - Roper Center
Career Counseling: $113,000
Architect: John Jordan, P.A. |
1984 |
Thompson Chemistry Lab
Lab renovations - lower level west: $189,480 |
1984 |
Weston Field Press Box
Replacement: $95,000
Architect: David J. Westall, R.A. |
1985 |
Baxter Hall
Phase II: $515,000
Architect: John Jordan, P.A. |
1985 |
Bronfman Science Center
Basement Classrooms: $501,000
Architect: Hallock Architects, Inc. |
1985 |
Chandler Commercial Building (John Wesley Chandler)
Retail/office building: $700,000
Architect: Cambridge Seven Associates, Inc. |
1985 |
Faculty Art Studio/College Garage
Renovation: $330,000
Architect: Burr and McCallum Architects |
1985 |
President's House
Renovation: $170,300 |
1985 |
Service Building
Garage: $257,000
Architect: David J. Westall, R.A. |
1985 |
Taconic Golf Club
Addition - Women's Locker Room: $200,000
Architect: William Kirby, Jr. |
1985 |
Mary Clark Thompson Center for Health Services
Cost: $721,000
Architect: David J. Westall, R.A. |
1985 |
Thompson Physics Lab
Renovation: $895,500
Architect: Hallock Architects, Inc. |
1985 |
Williams Oxford
Improvements: $607,000
Architect: The Oxford Architects Partnership |
1986 |
Cole Field House
Renovation: $105,000
Architect: David J. Westall, R.A. |
1986 |
Lawrence Hall - Williams College Museum of Art
Phase II: $2,571,500
Architect: Centerbrook Architects, Inc. |
1986 |
Thompson Hall
Conversion to Dorm: $377,000
Architect: Hallock Architects, Inc. |
1986 |
Williams Club, New York
Cost: $520,500 |
1987 |
John Wesley Chandler Athletic Facility and Lasell Renovations
Feasibility Study: $35,000
Design and Construction : $16,282,000
Retail Space/Athletic Offices: $700,000
Architect: Cambridge Seven Associates, Inc.
General Contractor: Fontaine Brothers |
1987 |
Mears West
Renovated for Alumni Office expansion: $556,400
Architect: John Jordan, P.A. |
1987 |
Weston Field
New Plansky Track (Tony Plansky) and relocate baseball field: $1,243,100
Architect: Saratoga Associates |
1987-92 |
Thompson Biology Lab
1987-88 Lab Renovation - Phase I: $273,985
1988-89 Lab Renovation - Phase II: $204,680
1988-89 Lab Renovation - Phase III: $ 70,150
1991-92 Lab Renovation - Phase IV: $ 64,226 |
1988 |
Grundy's Garage
Purchased: $445,000 |
1988 |
Lasell Gym
Renovation: $3,000,000
Architect: Cambridge Seven Associates, Inc. |
1989 |
Clark Hall (Edward Clark 1831)
Geology Lab Renovation: $117,913 |
1989 |
Fayerweather Hall
Renovation: $400,000 |
1989 |
Heating Plant
Co-generation: $340,900
Architect: vanZelm, Heywood, & Shadford |
1989 |
Hopkins Hall
Renovations and new addition: $9,300,000
Architect: Architectural Resources Cambridge, Inc.
General Contractor: Barry Bette and Led Duke |
1989 |
Weston Language Center
Phases I-IV: $1,037,125
Architect: William Kirby, Jr. & David J. Westall, R.A. |
1990 |
Computer Network Equipment
Cost: $2,665,050 |
1990 |
Jenness House (Arthur Freeman Jenness)
Multicultural Center
Cost: $27,300 |
1990 |
Jewish Religious Center
Design and Construction: $1,457,450
Architect: Herbert Newman Associates AIA, P.C.
General Contractor: GSS Construction |
1990-91 |
Mission Park
Renovations - Phases I-III: $2,885,000 |
1991 |
East College
Renovation: $330,412 |
1991 |
Sawyer Library Automation
Cost: $650,000 |
1991 |
Pine Cobble Faculty Housing Subdivision
Cost: $7,612,000 |
1991 |
Williams Oxford
Renovation: $75,000 |
1992 |
Danforth Block
Renovation: $815,798 |
1992 |
Morgan Hall
Renovations: $1,572,568
Architect: Weese Langley Weese |
1993 |
Currier Hall
Renovation and refurbishment: $685,082 |
1993 |
Dodd House (Cyrus Morris Dodd 1855)
Renovation and refurbishment: $886,702 |
1993 |
Poker Flats (formerly Stetson Road Apartments)
Conversion to student housing: $1,600,000
Architect: Einhorn Yaffee Prescott |
1993 |
Sawyer/Hopkins Hall
Air Conditioning: $745,942 |
1993 |
Sawyer Library
Renovation: $3,200,000
Architect: Weese Langley Weese |
1994 |
Bascom House (John Bascom 1849)
Renovation: $537,846 |
1994 |
Fitch House (Ebenezer Fitch)
Renovation: $944,270 |
1994 |
Perry House (Arthur Latham Perry 1852)
Renovation: $968,874 |
1994 |
Spencer House (Philip Spencer)
Renovation: $845,046
Architect: EDM |
1995 |
Kellogg House - Center for Environmental Studies (Ebenezer Kellogg)
Matt Cole Library addition: $350,729
Architect: Ann Beha Associates |
1996 |
Center for Development Economics
Renovation: $1,239,862 |
1996 |
Goodrich House (Frank Goodrich)
Renovation: $141,168
Architect: Christopher Williams |
1996 |
WLS Spencer Studio Art Building (Wadsworth Littleford Stegeman)
Design and Construction: $5,606,660
Architect: Carlos Jiminez Associates/Cambridge Seven Associates |
1996 |
Williams Hall/Sage Hall
Renovation: $9,797,306
Architect: Einhorn Yaffee Prescott
General Contractor: Barry Bette and Led Duke |
1997 |
Cole Field House
Renovation: $1,727,923
Additional Funding: $247,000
Architect: Baron & Hammer |
1997 |
Droppers House (Garrett Droppers)
Renovation/Addition: $52,071
Architect: Christopher Williams |
1997 |
Griffin Hall
Phases I-III: $2,750,000
Architect: Childs Bertman Tseckares |
1997 |
Simon Squash Courts
Carol Girard and Cynthia Stewart Simon Squash Center
Renovation: $3,800,000
Architect: Wurmfeld Associates |
1997 |
Susan Hopkins House (Susan Sedgwick Hopkins)
Renovation: $160,094
Additional Funding: $67,000 |
1997 |
Woodbridge House
Renovation: $244,940
Additional Funding: $117,000 |
1998 |
Clarence Chaffee Tennis House
Torrence M. Hunt '44 Tournament Courts
Rebuilt tennis house and court improvements: $279,668
Todd Hunt Tennis Center: $167,694
Architect: Christopher Williams |
1998 |
Doughty House (William H. Doughty Jr. 1898)
Renovation and refurbishment: $362,973 |
1998 |
Mears House
Renovation/AC: $220,339 |
1998 |
Seeley House (Charles F. Seeley)
Restoration: $54,563 |
1998 |
Thompson Hall Dorm
Renovation: $1,121,774
Architect: Thomas Bartels |
1999 |
Class of 1937 House/Children's Center
Renovation: $395,187
Architect: Dignard Architectural Services |
1999 |
East/Fayerweather
Single Sex Bathrooms: $532,462
Architect: H.P. Rovinelli Architects |
1999 |
Fernald House
Renovation/Code Issues: $209,665 |
1999 |
Ft. Hoosac Renovation
Renovation: $167,222
Architect: Bob Holdridge |
1999 |
Goodrich Hall
Conversion to Student Activity Center: $2,430,251
Architect: Bruner/Cott Associates
Refurbish and install Tenney Window: $12,150
Cummings Studios |
1999 |
Greylock Housing
Code Deficiencies and Network Cabling: $244,000 |
1999 |
Mt. Hope/Elm Tree House
Renovation/Code Work: $538,966
Architect: Einhorn Yaffee Prescott |
1999 |
Tyler House-Phase I
Renovation: $50,000 |
1999 |
West College
Renovation: $850,074
Architect: Primary Group |
1999 |
Wood House (Hamilton B. Wood '10)
Renovation: $1,047,897
Architect: Primary Group |
2000 |
Brooks House
Renovation: $933,559
Architect: Thomas Bartels |
2000 |
Garfield House
Renovation: $313,515
Architect: Thomas Bartels |
2000 |
Greylock Housing-Bryant/Mark Hopkins
Renovation: $2,500,000
Architect: Black River Design
Contractor: MLB |
2000 |
Lambert House (Anna Elizabeth Lambert)
Renovation: $105,862
Architect: Mollenburg and Betz |
2000 |
Milham House (Willis I. Milham 1894)
Renovation: $244,611 |
2000 |
Weston Field Grandstand
Relocation and Renovation: $254,745
Architect: Christopher Williams |
2001 |
The Carl W. Vogt '58 House (formerly 63 Park Street)
Renovation: $1,594,717
Sitework: $150,000
Architect: Mark Hammer |
2001 |
American Legion
New Construction: $791,205
Architect: Hill Architects |
2001 |
Chaffee Tennis House
Todd Hunt Tennis Center
Construction of Additional Courts: $167,694 |
2001 |
Dodd Dining Renovation
Renovation: $1,045,705
Architect: Centerline
General Contractor: Cutler |
2001 |
Greylock Housing-Carter/Gladden
Renovation: $3,268,596
Architect: Black River Design
Contractor: MLB |
2001 |
Heating Plant Upgrade
Upgrade: $969,859 |
2001 |
Hubbell House (Mary Hubbell)
Renovation: $276,543
Architect: David Westall
General Contractor: Renau |
2001 |
Parsons House (Eben B. Parsons 1859)
Renovation: $245,827
Architect: David Westall |
2001 |
Tyler Annex Renovation
Renovation: $966,457
Architect and General Contractor: Breadloaf |
2001 |
Tyler House Renovation-Phase II
Renovation: $1,282,174
Architect and General Contractor: Breadloaf |
2001 |
Morley Science Laboratories and Schow Science Library
Edward William Morley/Nan and Howard Schow
Science Library and Thompson Labs Renovations: $47,827,700
Architect: Einhorn Yaffee Prescott/Zimmer Gunsul Frasca
General Contractor: Gilbane Building Company |
2002 |
Alumni House/The Log Renovation
Renovation: $104,874
Architect: David Westall
General Contractor: Renau |
2002 |
Heating Plant Upgrade
Boiler 3 Replacement: $3,300,000
Electrical Cogeneration: $2,700,000
Auxiliary Systems: $693,889
Architect: Childs Bertman Tseckares
General Contractor: Pizzagalli |
2002 |
Mather House
Relocation to Stetson Court and Renovation: $497,187
Architect: Thomas Bartels
General Contractor: Renau |
2002 |
Mission Park Dining Renovation Phase I
Renovation: $3,061,876
Architect: Centerline
General Contractor: Breadloaf |
2002 |
Thompson Hall Student Parking Lot
Design and Construction: $300,339
Architect: Halvorson |
2003 |
Bascom House Renovation
Conversion to Admissions: $408,622
Architect: EDM
General Contractor: Renau |
2003 |
Brooks B Parking Lot Expansion
Expansion: $166,604
Engineer: Vince Guntlow
Contractor: Petricca |
2003 |
Lansing Chapman Rink Renovation
Renovation: $922,021
Dasher Boards: $167,938
Engineer: RFS
Contractor: American Refrigeration |
2003 |
MSL Neuroscience Lab 022
Animal Lab Conversion: $254,012
Paul Solomon's Office: $19,394
Architect: Einhorn Yaffee Prescott
General Contractor: Tierney |
2003 |
Parking Garage
Design: $400,000
Sitework and Construction: $5,393,158
Architect: William Rawn Associates
General Contractor: Barr & Barr |
2003-04 |
High Voltage Distribution System Expansion
Expansion: $349,974
Electrical System Repairs: $775,000
Engineering Consultant: vanZelm, Heywood and Shadford
General Contractor: Pizzagalli |
2003-04 |
Mission Park Renovation Phase II
Student Life Improvements: $1,835,376
Network Upgrade: $650,000
Life Safety and ADA: $3,283,919
Architect: Centerline
General Contractor: Breadloaf |
2003-04 |
33 Tenison Road, Cambridge, England
Purchase and Renovation: $1,142,155 |
2004 |
Baxter Hall
Demolished 10/2004 |
2004 |
Central Chilled Water Plant
Planning, Site Work and Preliminary Design: $250,000
Construction: $4,180,587
Architect: William Rawn Associates
General Contractor: Barr & Barr |
2004 |
Chadbourne House Renovation (Paul Ansel Chadbourne)
Design: $50,000
Renovation: $497,798
Architect: EDM
General Contractor: Renau |
2004 |
Renzie Lamb Synthetic Turf Field
Cost: $1,993,460
Architect/General Contractor: Clark Companies |
2004 |
New Baseball Field-Cole Field
Bobby Coombs Baseball Field: $510,814 |
2004 |
North Campus Utilities Phase I
Cost: $3,500,000
Chilled Water to Chapin: $350,000
Engineer: VanZelm Heywood & Shadford
General Contractor: Breadloaf |
2004 |
Southworth School Renovation
Acquisition: $400,000
Design and Conversion: $5,504,500
Architect: Black River Design
General Contractor: Engelberth |
2004-2012 |
Stetson/Sawyer Project
Programming: $1,000,000
Design: $2,000,000
Design: $2,000,000
Design Completion and Construction: $123,000,000
Architect: Bohlin Cywinski Jackson
General Contractor: Barr & Barr |
2004 |
Thompson Memorial Chapel
Centennial Celebration Restoration - $414,424
Windows-Lead Replacement - $106,619
Architect: Ryan-Biggs
General Contractor: Allegrone
|
2004-05 |
Prospect House Renovation Phase I and II
Student Life Improvements: $1,953,089
Renovation: $3,473,180
Radio Station: $423,390
Architect: Black River Design
General Contractor: MLB |
2005 |
AMT Renovation
Improvements: $1,762,027
Renovation: $3,200,173
Architect: William Rawn Associates
General Contractor: Barr & Barr |
2005 |
B&L Building
Acquisition: $300,000
Design, Demolition and Construction: $3,401,104
Additional Funding: $670,000
Architect: Burr & McCallum
General Contractor: Tierney |
2005 |
Class of '62 Center for Theatre and Dance
Project Cost: $52,194,310
Design and Construction: 50,300,000
Additional funding: $1,500,000
Theater Consultant: Robert Davis, Inc.
Architect: William Rawn Associates
General Contractor: Barr & Barr |
2005 |
Eph's Monument and Gravesite Restoration
Restoration: $323,487
Architect: Elmore Design
General Contractor: E.T. O'Connor |
2006 |
Agard Renovation
Design: $100,000
Renovation: $1,899,349
Architect: Woodward, Connor, Gillies , Seleman
General Contractor: Renau |
2006 |
Fernald House
Demolished 9/12/06 |
2006 |
North Campus Utilities Phase II
Cost: $2,777,039
Engineer: VanZelm, Heywood and Shadford
General Contractor: Barr & Barr |
2006 |
Morgan Hall Renovation
Design: $200,000
Construction: $6,089,058
Architect: Black River Design
General Contractor: Barr & Barr
|
2006 |
Wireless Implementation: $572,427 |
| 2007 |
Children's Center
Expansion Feasibility Analysis: $34,992
Site Selection: $75,000
Design: $370,575
Design and Construction: $5,775,000
Architect: D.W. Arthur Associates Architects
Contractor: Engleberth |
2007 |
Fitch House Cornice Repair
Design: $60,000
Construction: $1,109,000
Architect: MCWB/Ryan-Biggs
General Contractor: Allegrone |
2007 |
Paresky Center (David Paresky '60 and Linda Paresky)
Programming and Pre-design: $1,000,000
Design Consultants: $2,500,000
Construction: $35,200,000
Contaminated Soil Clean-Up:
Additional Funding - $8,500,000
Architect: The Polshek Partnership
General Contractor: Breadloaf |
2008 |
Athletic Complex
Master Planning: $200,000 |
2008 |
Garfield
Renovation design: $200,000 |
2008 |
Goodrich Hall
Great Hall Structural Repair: $400,000 |
2008 |
Kellogg House
Relocation and Renovation |
2007-08 |
Off-Site Storage Building
Simonds Road Property Purchase and Development: $2,350,000
General Contractor: Barr & Barr
|
2008-09 |
Weston Field Improvements
Design and Construction: $17,600,000
Architect: Moser Pilon Nelson/Clark Companies
General Contractor: Daniel O'Connell's Sons, Inc. |
2008 |
Weston Language Center
Renovation |